ATLAS UPGRADE BARREL END SERVICES – Work on trying to reduce mass of cooling in R/PHI TJ Fraser UCL 13.06.08 Assuming cooling pipes have to be directed.

Slides:



Advertisements
Similar presentations
WP7 ATLAS ID Barrel End Services T.J.FRASER UCL Aim: Using experience gained from work on the current ATLAS SCT Barrel, attempt an improved design and.
Advertisements

Barrel services minimum space allocation in Z ‘Strawman’ layout and Spider… layout WARM and COLD GAP versions Services envelope in Z: In order to reserve.
A.Nichols CLRC1 SCT HEX PRR ( ) Layout & Installation of Barrel off-detector HEX circuits From barrel cooling loop to PPB1 l Barrel Hex is a plain.
A.P.Colijn1 CO2 Cooling for an ATLAS upgrade Plant requirements CO 2 : Properties CO 2 : Consequences of the properties CO 2 : From LHCb to ATLAS (or the.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Comparison of cooling services at barrel end Description SCT Barrel Upgrade ID barrel one end one end Total number of staves/rows 176 Staves/rows serviced.
CO 2 return pressure drop budget and pipes from PP2 to tracker Georg Viehhauser.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
Material calculation of petal core variants Sergio Díez Cornell with input from many people CERN AUW, 3 rd Nov 2014.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Work to Date Analysis Work –Random Vibration Analysis of RICH2 Structure PSD data from LEP Tunnel (Including affect of large ventilation system) Excitations.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
Statistical Process Control
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
HEP GROUP MEETING work on the ATLAS UPGRADE T.J.Fraser.
Barrel SCT Material Budget By Alessandro Tricoli RAL ATLAS Physics meeting, 18 th March 2008.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
ATLAS Tracker Upgrade - Services at Barrel Ends: Scenario where services are routed through existing services channels on cryostat shown on the next 3.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
UK Activities on pixels. Adrian Bevan 1, Jamie Crooks 2, Andrew Lintern 2, Andy Nichols 2, Marcel Stanitzki 2, Renato Turchetta 2, Fergus Wilson 2. 1 Queen.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
Status of Reconstruction in sidloi3 Ron Cassell 5/20/10.
12th HL-LHC Parameter and Layout Committee meeting.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
SP & DC-DC Considering the benefits of combining serial powering and DC-DC conversion technologies in powering ATLAS SCT upgrade modules & staves Richard.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
FCC-hh HCAL software goals Ana Henriques (thanks for Clement Helsens, Carlos Solans input)
Strip Tracker Costing Analysis Status Carl Haber July 25, 2011.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ATLAS ITk Upgrade: SLIM Update
Comments on Engineering talk by A. Catinaccio at Inner Tracker Engineering Meeting CERN ) Fixed length barrel layout drawing by C. Bault (Strawman.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
Module Radiation Length. Goals Estimate the expected radiation length of a module, based on the design and measurements on as-built modules Determine.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
ATLAS Internal ID Service Integration
End-cap Mechanics FDR Overview of the Project
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
? ENDCAP: Mechanics IFIC-Valencia.
Future tube procurement Richard French
Sensor Layout Options Aim is to understand the implication and constrains of possible sensor design/layout on the general ID Layout. Keep both ATLAS “drum”
WP9 ITS Mechanics and Cooling
Services Layout – Update
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
BARREL 3 FIBRE ROUTE ORDER and HARNESS INSTALLATION ORDER]
The IR beam pipe M. Sullivan For
Barrel stave allocation on the PP0 exhaust fitting
Stainless Steel Water Well Casing.
Perforated Casing Pipe. Stainless Steel Perforated Casing.
TRD GAS SYSTEM PRR Gas System Integration Gas building
Perforated Casing Pipe. Stainless Steel Perforated Casing.
Compare noise from 3PG against module data?
Presentation transcript:

ATLAS UPGRADE BARREL END SERVICES – Work on trying to reduce mass of cooling in R/PHI TJ Fraser UCL Assuming cooling pipes have to be directed to specific narrow channels on the cryostat and cannot be spread around phi then layout must include manifolding for cooling output on the barrel end. This also reduces the considerable mass. On the existing SCT barrel, there is one cooling pipe per row of modules. On the upgrade barrel, there will be two cooling pipes per stave. Need to reduce numbers of pipes as close to barrel as possible if you want to use EC detectors! Otherwise you have an Iron Curtain (well stainless steel probably) One way to do this is could be to manifold pairs of pipes close to the barrel end so that mass is reduced. The number of pipes would then be closer to the current SCT. To bring two cooling pipes of the same type closer, to reduce mass of bridge, alternate staves could be reversed with respect to cooling pipe flow, so that stave at phi1 would have exhaust on left and input on right (looking end on) and stave at Phi2 would have exhaust on right and input on left etc. The design of the short links could include strain relief. Ongoing / Future work : continue with CAD drawings and excel spreadsheets. Lots of possibilities to try out in order to reduce mass at the barrel end but at the same time trying not to increase the size of the envelope in Z.

normal stave reverse stave Upgrade Barrel end services (all layers)Total %Xo/side comparison

Total %Xo/side COMPARISON of UPGRADE with PRESENT SCT BARREL COOLING at Barrel end – Output and Input pipes – normal vs reverse stave OUTPUT – present SCT barrel spiders comparison with 2 types of upgrade stave Comparison with reverse cooling stave INPUT – present SCT barrel capillaries Comparison with 2 types upgrade stave Comparison with reverse cooling stave existing SCT existing SCT existing SCT existing SCT Upgrade (3 layers short stave) normal cooling staves Upgrade (3 layers short stave) normal cooling staves Upgrade (3 layers short stave Upgrade (3 layers short stave) reverse cooling stave reverse cooling stave

bus cooling normal stave buscooling reverse stave Total %Xo/side for bus and cooling for Upgrade – all staves (3 short and 2 long) Comparison of normal stave with reverse stave cooling, with constant mass for bus. Note: cooling assumed here to be CO2 with 3mm OD cooling pipe on stave and with all cooling pipe on barrel end stainless steel (for Upgrade). Opto components not yet included.