CERN NuPAC meeting 10-12 Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.

Slides:



Advertisements
Similar presentations
Paris, November 2004 M. Lewitowicz NuPECC meeting Physics case of SPIRAL 2 and EURISOL SPIRAL2 and EURISOL facilities Available Beams Physics Case Conclusions.
Advertisements

EURISOL Peter Butler University of Liverpool
NuPECC June 2007 The ISOLDE research programme Peter Butler (University of Liverpool) 1.The present 2.The future.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther Rosner NuPECC LRP2010 Town Meeting Madrid, 2/6/10 1.
EURISOL Transition period MYRRHA and
Complementarity of New RNB Facilities and Their Technological Challenges HIAT ‘09 Venice, Italy June 8, 2009 Jerry Nolen Physics Division Argonne National.
EURISOL (and the European ISOL roadmap) Yorick Blumenfeld* (CERN) *on leave from IPN Orsay.
BEAM INTENSITIES WITH EURISOL M. Valentina Ricciardi GSI, Darmstadt, Germany.
Radioactive Ion Beams: where are we now experimentally? M. Huyse K.U. Leuven Moriond, March 2003 Opening page.
Alex C. MUELLER Physics with a multi-MW proton source, CERN, Geneva, May Additional Installations for a Nuclear Physics Facility Alex C. MUELLER.
Estimation of production rates and secondary beam intensities Martin Veselský, Janka Strišovská, Jozef Klimo Institute of Physics, Slovak Academy of Sciences,
Status of EURISOL Yorick BLUMENFELD We acknowledge the financial support of the European Community under the FP6 “Research Infrastructure Action - Structuring.
Lunchtime S.I.E.S.T.A. James Butterworth Finding Atomic Nuclei Offenders with James the Nuclear Detective “It’s element.. element... elementary my dear.
ISCC 24 May 2004L.M. Fraile L.M. Fraile, CERN PH/IS ISOLDE scientific coordinator’s report ISOLDE Collaboration Committee 24 th May 2004 ISOLDE scientific.
Nuclear Science in Africa
A facility for Nuclear, Atomic, Material and Radiobiology Sciences. Delivering stable (from C to U) and radioactive ions (from He to Xe) in the energy.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Noyaux CERN- ISOLDE Yorick Blumenfeld.
Cross section measurements at LNL M.Mezzetto (INFN-Pd) on behalf of INFN-LNL: M. Cinausero, G. De Angelis,G. Prete.
H. Ravn CERN High-power Targetry for Future Accelerators 7/9/ H. L. Ravn/CERN, EP High power targets for EURISOL and Beta -beams.
The Youngsters in Theoretical Nuclear Physics An Ace up France’s sleeve in the RIB competition.
EURISOL – Distributed Facility (DF) Y. Blumenfeld, M. Lewitowicz, P. Van Duppen, A. Maj Background : EURISOL RTD : EURISOL Design Study.
Nuclear physics: the ISOLDE facility
Radioactive ion beam facilities How does they work ? 2012 Student Practice in JINR Fields of Research 9.oct.2012 I. Sivacekflerovlab.jinr.ru.
Obergurgl -02/10/2007Lecture 2. The Story so far We looked at a) our present theoretical understanding of Nuclear Structure b) Some simple physics.
Mats Lindroos INTC Agenda 09:00 Introduction by the Chairman, J. Äystö 09:05 Report by the ISOLDE Technical Coordinator, M. Lindroos 09:25 Report by the.
A Plan to Construct a Rare Isotope Accelerator Facility KoRIA S. W. Hong Sungkyunkwan University (SKKU) On behalf of Conceptual Design Project Team S.
SPL, a driver for EURISOL? Yorick Blumenfeld* Isolde-CERN * On leave from IPN Orsay We acknowledge the financial support of the European Community under.
New Opportunities with HIE ISOLDE Piet Van Duppen KU Leuven, Belgium Introduction: Radioactive Ion Beam (RIB) physics: key questions HIE ISOLDE opportunities.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
K. Riisager, TA8 ISOLDEEURONS PCC-Meeting, Mainz (Germany), April 2006 Recent highlights from ISOLDE News from the facility –Users meeting, February.
Radioactive ion beam production at other facilities
NuPECC Mapping Studies FINUPHY/EURONS I3 EURONSFINUPHY/FP5 EURONS/FINUPHY Meeting, Funchal (Portugal), 7-9 February 2005 NuPECC Report 2002 “Impact, Applications,
Mats Lindroos Future R&D: beta-beam Mats Lindroos.
SPES. 1.Develop a Neutron Rich ISOL facility delivering Radioactive Ion Beams at 10AMeV using the LNL linear accelerator ALPI as re-accelerator. 2.Make.
Reiner Krücken Welcome to Kloster Banz. Reiner Krücken The Munich Accelerator for Fission Fragments at the FRM II in Garching Facility Overview Status.
European Isotope Separation On-Line Radioactive Nuclear Beam Facility A preliminary design study of the next- generation European ISOL RNB facility GANIL,
The FAIR* Project *Facility for Antiproton and Ion Research Outline:  FAIR layout  Research programs Peter Senger, GSI USTC Hefei Nov. 21, 2006 and CCNU.
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
Coseners meeting Sept Future of European ISOL Peter Butler.
ISOLDE at the turn of the millennium* Juha Äystö Helsinki Institute of Physics Helsinki, Finland * As seen by the ISOLDE Physics Group.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Radioactive Ion Beams CW 0.5 MW (for protons) 1 GeV (for protons) p to U Chiara, Manuel, Adam, HuiMay 2011, CAS, Bilbao.
UK Research in Nuclear Physics P J Nolan University of Liverpool.
Trends in Heavy Ion Physics Research, Dubna, May Present and future physics possibilities at ISOLDE Karsten Riisager PH Department, CERN
ISOLDE – High-lights and Future Plans Maria J. G. Borge, CERN, PH-Dept.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
SECONDARY-BEAM PRODUCTION: PROTONS VERSUS HEAVY IONS A. Kelić, S. Lukić, M. V. Ricciardi, K.-H. Schmidt GSI, Darmstadt, Germany  Present knowledge on.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Riccardo Raabe (IKS, KU Leuven) for the Collaboration INTC 01/02/2012 INTC-O-014 Storage ring facility at HIE-ISOLDE: Technical Design Report.
Nuclear physics: the ISOLDE facility Magdalena Kowalska CERN, PH-Dept. on behalf of the CERN ISOLDE team Lecture 2:
Summary: Physics Opportunities for ISOLDE and n_TOF Peter Butler.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
How can one produce rare isotopes? Question Slid 3 Hendrik Schatz NNPSS 2012, Slide 3 Rare Isotope Production Techniques: Uniqueness of FRIB Target spallation.
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
Comprehensive investigation of the decay losses in the ISOL extraction method KP2 Seminar, Strahinja Lukić.
EURISOL: European Collaboration towards the ultimate ISOL facility Yorick Blumenfeld IPN – Orsay We acknowledge the financial support of the European Community.
The Future of EURISOL Results from the Design Study
Finnish participation at ISOLDE
Workshop, 10/2012 “The Project”
for the EURISOL Steering Committee
Progress of BRIF and CARIF
Nuclear Physics in France
BEAM INTENSITIES WITH EURISOL
Superbeams with SPL at CERN
EMIS, 2002, Victoria, Canada Mats Lindroos for PSMB Mats Lindroos.
European Spallation Neutron Source ESNS
Hadron Programs at HIRFL-CSR
Joint session – Beta-beams
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Presentation transcript:

CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL

CERN NuPAC meeting Dec 2005 Users & Science 450 users (7% total CERN) potentially 1000 users with upgrade 25 countries; 100 institutions 175 projects (4 years)

CERN NuPAC meeting Dec 2005  Originally constructed by several CERN member states ~ 15 MCHF  Utilises now  50% ISOLDE running time  In last three years REX has accelerated 33 different RIB  Present RIB yield from ISOLDE allows 10% of all radioisotopes be used REX post-accelerator

CERN NuPAC meeting Dec 2005 World ISOL

CERN NuPAC meeting Dec 2005 HIE-ISOLDE Increase in REX energy from 3 to 10 MeV/u (first step in increase to 5.4 MeV/u) Increase proton intensity 2  6  A (LINAC4, PSB upgrade) - target and front-end upgrade Super-HRS for isobaric separation RILIS upgrade & LIST RFQ cooler, REX-TRAP, REX-EBIS REX-ECR upgrades Low energy facility (< 1 MeV/u) Collinear Laser Spectroscopy, ISOLTRAP nuclear mass Condensed matter, Nuclear Astrophysics

CERN NuPAC meeting Dec 2005 Spectrometer plans ISOLDE PH-IS and INTAG JRA

CERN NuPAC meeting Dec 2005 Coulomb barrier for RIB

CERN NuPAC meeting Dec 2005 Transfer reactions at high energy W.N. CATFORD (SURREY)

CERN NuPAC meeting Dec 2005 ISOL In-flight RIB Physics Reach

CERN NuPAC meeting Dec 2005 Time-line and costs REX energy upgrade to 5.4 MeV/u2008 High intensity upgrade2010 REX energy upgrade to 10 MeV/u2011 Material costs15.3 MCHF Staff42.5 FTE Identified sources extra-CERN: 4.1 MCHF ISOLDE collaboration IKS Leuven BE EPSRC UK ISTC, EU, RU VR SE

CERN NuPAC meeting Dec 2005 Operational costs Existing REX operation650 kCHF per year (2 engineers, 3 technicians + materials) Must be transferred to CERN May 2006 HIE-ISOLDE, additional personnel: operation 3 FTE target/front-end2 FTE DAQ 1 FTE Secretariat0.5 FTE

CERN NuPAC meeting Dec 2005 EU projects ( ) EURONS I 3 : (2.1 MCHF) TNA JRA’s: INTAG, CHARGE BREEDER, LASER, SAFERIB, (TRAPSPEC) EURISOL DS:(2.8 MCHF) R&D in targets &  -beam radioisotope manipulation safety

CERN NuPAC meeting Dec kW direct production 5 MW spallation n target  100 MeV/u RIB Eurisol

CERN NuPAC meeting Dec 2005 EURISOL layout SPL HIE-ISOLDE PS booster IF target

CERN NuPAC meeting Dec 2005 European Roadmap for RIB facilities linac d 40 MeV HI 15 MeV/u reactor PS booster p 1.4 GeV

FINIS

CERN NuPAC meeting Dec 2005 Europe 2 nd Generation ISOL FACILITYDRIVERPOWERENERGY HIE- ISOLDE CERN PS booster p, 1.4 GeV, 10 µA 10 KW MeV/u linac SPIRAL-II GANIL linac deuterons 40 MeV heavy ions 15 MeV/u 200 kW (secondary target) 2 – 25 MeV/u cyclotron MAFF Munich reactor10 14 n/cm 2.sec7 MeV/u linac SPES Legnaro linac p,d, … 100MeV 200 kW (secondary target) 10 MeV/u linac

driver accelerator or reactor thin targethigh-temperature thick target fragment separator experiment ion source mass separator storage ring In FlightISOL heavy ions light ions, neutrons post accelerator GeV/u (  s) meV to 100 MeV/u (ms to several s) gas cell (ms) IF versus ISOL After Mark Huyse stochastic/electron cooling to MeV/u (s)

CERN NuPAC meeting Dec 2005 Unique Experimental Facility Repertoire: 850 radionuclides from 70 elements Availability: 350 shifts of radioactive beam /year (2 primary targets & mass separators) Selectivity: target/ion source expertise, RILIS, mass separation Postacceleration: REX TRAP+EBIS+LINAC

CERN NuPAC meeting Dec 2005 World machines LocationDriverPost-accelerator Fragment separator Type of facility GSI –FAIR synchrotron, heavy ions: 1.5 A GeV -‘Super-FRS’In-Flight EURISOL protons, 1 GeV, 1-5 MW CW Linac, up to 100 A MeV -ISOL USA: RIA Rare Isotope Accelerator 900 MeV protons heavy ions: 400 A MeV, 100 kW Linac up to 8–15 A MeV 4-dipole Separator ISOL, In-Flight JAPAN: RIKEN RIB Factory Ring-cyclotrons up to 400 AMeV (light ions) up to 150 A MeV (heavy ions) - 3 fragment Separators storage & cooler rings In-Flight

CERN NuPAC meeting Dec 2005 Kr yields

CERN NuPAC meeting Dec 2005 RIB physics

SPL versus PS Booster

CERN NuPAC meeting Dec 2005 Costs

CERN NuPAC meeting Dec 2005 How does the differential cross section vary with beam energy ? and the total cross section ? W.N. CATFORD SURREY TIARA

CERN NuPAC meeting Dec 2005 How does the differential cross section vary with beam energy ? and the total cross section ? W.N. CATFORD SURREY TIARA

CERN NuPAC meeting Dec 2005 How does the differential cross section vary with beam energy ? and the total cross section ? W.N. CATFORD SURREY TIARA

CERN NuPAC meeting Dec 2005 How does the differential cross section vary with beam energy ? and the total cross section ? W.N. CATFORD SURREY TIARA