LBT Q4 2008 Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.

Slides:



Advertisements
Similar presentations
MMT Primary Mirror Actuator Test Stand Upgrade
Advertisements

LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
Arecibo Telescope Servo & Drive System Technical Meeting May 2004 VERTEX ANTENNENTECHNIK GmbH Arecibo Telescope Servo Drive System Ideas For Computer.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Main Components of a CNC System
Connecticut Corsair Senior Design Simulator Refurbishment EE Design Team 194.
©Ian Sommerville 2000CS 365 Ariane 5 launcher failureSlide 1 The Ariane 5 Launcher Failure June 4th 1996 Total failure of the Ariane 5 launcher on its.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
The Voice Operated and Wirelessly Controlled Elevator Jeremy Hester Advisor: Dr. Mohammad Saadeh Class: ET 494 (Senior Design II), Fall 2013 Class Professor:
LBTO PMC Subsystem February 13, 2007 Chris Biddick 1 cjb.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
LBT Q Engineering Review MCSC Mount Control System.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
Slow controls R and D Chris Gould North Carolina State University and TUNL.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering/Software Review ROTRotators.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
Operations Good –Telescope downtime is low –Important repairs accomplished –Observer satisfaction is high Bad –Maintenance is deferred –Unfinished work.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
Sardana/IcePAP Based Control System for elliptically polarized Undulator at Max IV 30th Tango Collaboration meeting
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
LBT Q Engineering Review Primary Mirror Cells.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
LBT Q Engineering Review ENGG – Engineering General.
ATLAS Pre-Production ROD Status SCT Version
MICE Target Report Video Conference 29/11/07
HP Printer Support Number. Support for HP Computer Support for Update your Printer Drivers 24/7 Support Services Support for Diagnosis & Fixing.
Electrical System P09045: Membrane Characterization Test Stand
Presentation transcript:

LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern

13-Jan-2009LBT Q42008 Eng/SW Review Accomplishments (Q4/2008) Installed bit bounce buffer board at SX, HP-1 and found that it did not solve the problem. (CB, MG, JK) Installed bit bounce buffer board at SX, HP-1 and found that it did not solve the problem. (CB, MG, JK) Additional study revealed an enable signal timing problem with stepper controller, fixed by Chris in software on mountain. (CB, MG) Additional study revealed an enable signal timing problem with stepper controller, fixed by Chris in software on mountain. (CB, MG) Also removed acceleration/deceleration profile which led to smoother, deterministic operation (no missed steps). (CB, MG) Also removed acceleration/deceleration profile which led to smoother, deterministic operation (no missed steps). (CB, MG) Purchased and tested new micro-stepping motor controller. (MG) Purchased and tested new micro-stepping motor controller. (MG) VHDL algorithm written and tested for microstepping using existing software control. Future velocity mode control also partially simulated/tested. (MG) VHDL algorithm written and tested for microstepping using existing software control. Future velocity mode control also partially simulated/tested. (MG) New hardpoint monitor board design underway using incremental and absolute encoders, new microstepping motor controller, and optional servo motor support. (MG) New hardpoint monitor board design underway using incremental and absolute encoders, new microstepping motor controller, and optional servo motor support. (MG) Replaced two non-functioning fans in spare VME crate. (GH) Replaced two non-functioning fans in spare VME crate. (GH) Telemetry has been implemented in the PMC subsystem, but is still turned off due to performance issues. (CB) Telemetry has been implemented in the PMC subsystem, but is still turned off due to performance issues. (CB) The elevation angle is sent to VxWorks in a way that is more robust with respect to load on the server running the PMC. (CB) The elevation angle is sent to VxWorks in a way that is more robust with respect to load on the server running the PMC. (CB) PMC documentation review comments completed. (DA, MG, JK) PMC documentation review comments completed. (DA, MG, JK)

13-Jan-2009LBT Q42008 Eng/SW Review Highlights (Q4/2008) Much PMC electronic re-work occurring in Tucson Much PMC electronic re-work occurring in Tucson Cells still behaving well Cells still behaving well

13-Jan-2009LBT Q42008 Eng/SW Review Open Issues Technical Technical Cell Documentation a work in progress, 08-Jan review created final (hopefully) list of AIs. Cell Documentation a work in progress, 08-Jan review created final (hopefully) list of AIs. Hardpoints have lower stiffness than desired, meet 80N/ m (min required) Hardpoints have lower stiffness than desired, meet 80N/ m (min required) Actuator test stand undocumented/not maintainable Actuator test stand undocumented/not maintainable Tracker reveals hysteretic behavior (~5u) in hardpoints Tracker reveals hysteretic behavior (~5u) in hardpoints Schedule Schedule Major PMC changes, replacing hardpoints with super-hardpoints, and redesigning HP monitor board and steppe driver must be completed this Quarter if we hope to re-fit the PMCs next shutdown. Major PMC changes, replacing hardpoints with super-hardpoints, and redesigning HP monitor board and steppe driver must be completed this Quarter if we hope to re-fit the PMCs next shutdown. Financial Financial ETS Test Stand proposal will be cost-plus, >$140k ETS Test Stand proposal will be cost-plus, >$140k Resource Resource Mountain staff limitations pace work at Observatory Mountain staff limitations pace work at Observatory ETS staff limitations pace cell documentation effort ETS staff limitations pace cell documentation effort

13-Jan-2009LBT Q42008 Eng/SW Review Planning (Q1/2009) Mike G. continues modification of hardpoint monitor board Mike G. continues modification of hardpoint monitor board Telemetry has been implemented in the PMC subsystem, but is still turned off due to performance issues. (CB) Telemetry has been implemented in the PMC subsystem, but is still turned off due to performance issues. (CB) Super-Hardpoint 1 st article to be built and characterized. Super-Hardpoint 1 st article to be built and characterized. ETS will rework Actuator Calibration Stand (TBD) ETS will rework Actuator Calibration Stand (TBD)