PACS SVR38/9 Nov 2007 Commissioning Phase1 Commissioning Phase H. Feuchtgruber.

Slides:



Advertisements
Similar presentations
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations The planning concept - current status Detlef Koschny Space Science Department ESA/ESTEC.
Advertisements

Jan 28, 2009CFS-GBL meeting 1 PM report Jan 28, 2009: Reviews –AAP –PAC (May 9 and 10, 2009) Meetings –TILC09 FALC –Madrid, Jan 19, 2009.
The PACS Status Herschel PV Mid-Term Review ESAC, September 1, Herschel Performance Verification Mid-Term Review PACS Status: Overview Markus Nielbock.
Bruno Altieri Jan # 1 Pointing calibration plan Bruno Altieri (HSC) PACS PV phase.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Questions from the European colleagues & Answers (only) from the Chinese engineers present for Y.-W. Zhang and S.-G. Yuan Chinese Academy of Space Technology.
HAWCPol / SuperHAWC Software & Operations J. Dotson July 28, 2007.
6.1 Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Building Information Systems Chapter 13 VIDEO CASES Video Case 1: IBM: Business.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
System Implementation
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
PACS CoP & PV Review 21/22 Jan 2009 PVSpecWave1 Spectrometer Wavelength Calibration XHSPOT Proposal: PVSpecWave H. Feuchtgruber.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
RSOC System Testing Status - 1 RSOC System Test Concept –Covered in RO-EST-PL-5013 –Status to be presented at key system reviews (GSRR) Connectivity Tests.
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Mattia Vaccari & Giulia Rodighiero & Gabriele Mainetti Department of Astronomy -
Transaction Processing Systems and System Development Life Cycle
PACS SOVT-2 (SIMS) and CAPs development MPIA PACS ICC Meeting #32 1 st – 3 rd April 2009, MPE Garching Markus Nielbock (MPIA)
PACS SVR22/23 June 2006 PACS Thermal Behaviour1 PACS Thermal Behaviour Tests T. Müller, H. Feuchtgruber, A. Contursi, Cs. Kiss, Sz. Csizmadia.
PACS Status Report Herschel ST#38ESAC, 30 Jun 2009 Herschel map making workshop 10 July 2009 B.Altieri/E. Sturm for the PACS Team / HSC Herschel map making.
PACS SVR22/23 June 2006 FM IST1 PACS FM Tests at Integrated Satellite Level H. Feuchtgruber with inputs from the PACS Operations Team: D. Cesarsky, H.
Planning and Writing Your Documents Chapter 6. Start of the Project Start the project by knowing the software you will write about, but you should try.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
SGS: Activities and Requests Helen Middleton. Hermean Environment Working Group Meeting | SGS Team | Key Largo | 16/05/2013 | Slide 2 Contents 1.ESAC.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
WFO Planning Tool RFC & FCT
Observing System Capability Analysis and Review Tool (OSCAR) Detailed functions WIGOS Project Office WMO; Name of Department (ND)
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
T Project Review X-tremeIT I1 Iteration
DCIPS Implementation Project Plan Update Army G2 Intelligence Personnel Management Office (IPMO) April 6, 2009.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
Consortium Meeting La Palma October ICC Status Tanya Lim 1 SPIRE Consortium Meeting La Palma, Oct. 1 – ICC Status Tanya Lim RAL.
PACS CoP & PV Review21/22 Jan 2009 CoP Plan and Timeline1 CoP Preparation H. Feuchtgruber.
HST Quarterly Review Page 1 Space Telescope Science Institute 12 February 2004 SI Status: COS STScI Support of COS Thermal-Vacuum Testing COS Thermal-Vacuum.
PACS SOVT-2 and CAPs development MPIA PACS ICC Meeting #31 12 th – 13 th January 2009, Vienna (A) Markus Nielbock (MPIA)
INFO 637Lecture #101 Software Engineering Process II Review INFO 637 Glenn Booker.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
CSI-MAXIMUS, Inc CSI Comprehensive Service & Support Implementing the CSI Way.
Certificate IV in Project Management Certificate IV in Project Management Course Structure Course Number Qualification Code BSB41507.
ESA UNCLASSIFIED – For Official Use ESA AVHRR Data Holdings and Ongoing Curation Activities Mirko Albani, Sergio Folco.
Oct.10, 2007EAMA7 The next-generation Infrared astronomy mission SPICA Outline of SPICA Scientific Research Concept (SciReC) SPICA 研究コンセプト概要 17 th May.
JWST Calibration mini-summit STScI June 13, 2008.
Retail Business Processes PR 50121_07 Project Update Retail Market Subcommittee September 13, 2006 Adam Martinez Mgr, Market Operations DPO.
Spectroscopy with PACS M82 PACS line imaging from the SHINING team (Contursi et al First Results workshop talk) Phil Appleton and Dario Fadda for.
PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch.
PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
PACS ICC Readiness Review MPE, July 3/ PACS Photometer PV Phase Plan 1 Status Report M. Nielbock: PACS PHOT PV Phase Plan Markus Nielbock (MPIA)
DEX Publication Project OASIS PLCS TC Telecon 22 January 2008 Trine Hansen.
PACS SVR38/9 Nov 2007 System Testing1 Tests on Satellite Level H. Feuchtgruber.
1 SICBDST and Brunel Migration status and plans. 2 Migration Step 1: SICBMC/SICBDST split  Last LHCb week: Split done but not tested  Software week.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
Herschel EQM – Results and Lessons Learnt6/7 Feb 2006 PACS Overall Analysis1 Overall PACS EQM IMT Analysis Contributions by PACS ICC.
Personal Training Assistant – Sprint#1 Group Gamma.
ESA UNCLASSIFIED – For Official Use HSO-OP - Solar and Planetary Missions Division Solar Orbiter Instrument Operations, Data Handling and FDIR Ignacio.
Introducing the INS Master Schedule Wayne Baggett.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Markus Nielbock (MPIA) – PACS Calibration Status Report Herschel Calibration Steering Group Meeting #24 PACS Calibration Status Report Markus Nielbock.
RSOC Overview at SWT #26, 11/12 June 2009
Maxim Pathfinder Prework 16 August 1999
GLAST Large Area Telescope:
5th Session of the Task Team on WIGOS Metadata
Jim Henricksen, MnDOT Steve Ruegg, WSP
SDO Flight Dynamics Subsystem
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
CVTS Continuing Vocational Training
GLAST Large Area Telescope
Presentation transcript:

PACS SVR38/9 Nov 2007 Commissioning Phase1 Commissioning Phase H. Feuchtgruber

PACS SVR38/9 Nov 2007 Commissioning Phase2 Overview and Constraints Launch and Early Orbit Phase (LEOP) –Duration 110min. (formal end = 2 nd orbit correction on day 12) –From ground disconnection to separation from launch vehicle –Orbit corrections (day 2, day 12) –Ground station coverage ~22h per day (few days) Commissioning (spacecraft and instruments in parallel) - Telescope heating (days 0 - ~22) - Cryo Cover opening (~day 30, Telescope around 120K) - Ground stations: New Norcia (3h) + Kourou(2h), but probably not contiguous - Data rate limitations for Kourou <=150kbit/s real time - PACS to assist in Telescope - Startracker boresight calibration - ICC operations will be conducted primarily at MOC with online support by

PACS SVR38/9 Nov 2007 Commissioning Phase3 Preparation Status (1) Plan discussed and agreed within PACS ICC First draft Plan delivered on 31-July-07 Second draft in progress: –Separate specialist meetings to settle open issues: Optimum bias determination and curing strategy of Ge:Ga detectors for FPG Optimum bias determination for bolometers for FPG (TBD) FPG strategy (TBD) –Documentation via dedicated system level test procedures –Separate technical notes for open issues –Converted real-time procedures into MOIS (done for FDIR, SFT, Chopper; Grating on hold because of open SCR)

PACS SVR38/9 Nov 2007 Commissioning Phase4 Preparation Status (2) Baseline operations are planned via MPS and MTL All manual procedures must be delivered via the PACS User Manual and attached MOIS import files. ftp://ftp.mpe.mpg.de/people/pacs/PACS_User_Manual/PACS_ ME-UM-002_drft4r_User_Manual_binder.pdf  IUM update (MOIS conversion) towards Issue 1 in progress

PACS SVR38/9 Nov 2007 Commissioning Phase5 Detailed Contents (1) Step #DescriptionDuration (min) DocumentStatus 1FDIR30PACS-ME-TP % 2SFT HeII120PACS-ME-TP % 3Chopper_x (x=1,2,3,4) 780PACS-ME-TP % 4Grating_x (x=1,2,3,4,5) 1200PACS-ME-TP-02195% 5Chopper_5600TN in progress; CUS coding TBD 10% 6GeGa_Bias_11230PICC-MA-TN-001; CUS coding TBD 50% 7FFT720PACS-ME-TP %

PACS SVR38/9 Nov 2007 Commissioning Phase6 Detailed Contents (2) Step #DescriptionDuration (min) DocumentStatus 8SPT-SPEC420PACS-ME-TP % 9SPT-PHOT420PACS-ME-TP % 10BOLO_Bias_1420TBW10% 11GeGa_Bias_2360PICC-MA-TN-001; CUS coding TBD 50% 12BOLO_Bias_2600TBW10% 13GeGa_Bias_x (x=3,4) 720PICC-MA-TN-001; CUS coding TBD 50% Cryo Cover Open

PACS SVR38/9 Nov 2007 Commissioning Phase7 Detailed Contents (3) Total Volume: hours (35.5 hours real time, hours without ground contact) Step #DescriptionDuration (min) DocumentStatus 14FPG_1 (PHOT)120TBW (Chop/Nod AOT + large raster) 10% 15FPG_2 (PHOT)480TBW (detailed raster) 10% 16FPG_3 (SPEC)120TBW (Chop/Nod AOT + large raster) 10% 17FPG_4 (SPEC)480TBW (detailed raster) 10% 18FPG_5720TBW (Contingency)0%

PACS SVR38/9 Nov 2007 Commissioning Phase8 Next Steps and Open Work –Expect now feedback from HSC/Project on our commissioning phase plan input –Continue with details and completion strategy (who does what) and create small dedicated teams (calibrators, specialists, commanders) [Ge:Ga bias, bolometer bias and FPG teams] –Awaiting TN from project what PACS is expected to do for STR vs. Telescope alignment measurements –Convert SFT/IST scripts into Engineering Observations –Convert grating procedure into MOIS (SCR pending) –Release issue 1 of IUM with updated manual procedures –Get training on “Expert HSPOT” and MPS