PACS CoP & PV Review21/22 Jan 2009 CoP Plan and Timeline1 CoP Preparation H. Feuchtgruber.

Similar presentations


Presentation on theme: "PACS CoP & PV Review21/22 Jan 2009 CoP Plan and Timeline1 CoP Preparation H. Feuchtgruber."— Presentation transcript:

1 PACS CoP & PV Review21/22 Jan 2009 CoP Plan and Timeline1 CoP Preparation H. Feuchtgruber

2 PACS CoP & PV Review21/22 Jan 2009 CoP Plan and Timeline2 PACS Commissioning Phase Overview (1) FDIR SFT HeII Chopper controller parameter tuning Grating controller parameter tuning Full functional test (FFT) Short performance test (SPT) Ge:Ga detector tuning Telescope background measurement Bolometer detector tuning

3 PACS CoP & PV Review21/22 Jan 2009 CoP Plan and Timeline3 PACS Commissioning Phase Overview (2) Instrument User Manual - Covers FDIR, SFT, Chopper and Grating tuning [ ftp://ftp.mpe.mpg.de/people/pacs/PACS_User_Manual/PACS-ME-UM- 002_Issue_1_3_User_Manual.pdf] - Conceptually tested during SOVT2 real time commanding PACS Commissioning Phase Plan - PACS-ME-PL-024, issue 1.2 + attachments E:\PACS Project\CoP Plan\PACS Commissioning Phase Plan PACS- ME-PL-024 issue1.2.pdf

4 PACS CoP & PV Review21/22 Jan 2009 CoP Plan and Timeline4 Commissioning Phase Details (1)

5 PACS CoP & PV Review21/22 Jan 2009 CoP Plan and Timeline5 Commissioning Phase Details (2)

6 PACS CoP & PV Review21/22 Jan 2009 CoP Plan and Timeline6 CoP X-HSPOT Proposals HF: repetition of IST and TBTV HF: take a full spectrum of the early telescope KO, MS MS, KO KO, TM PR, HD MN, UK

7 PACS CoP & PV Review21/22 Jan 2009 CoP Plan and Timeline7 CoP X-HSPOT Proposals Example: GeGa_Bias_1

8 PACS CoP & PV Review21/22 Jan 2009 CoP Plan and Timeline8 Analysis & Uplink Feedback (1)

9 PACS CoP & PV Review21/22 Jan 2009 CoP Plan and Timeline9 Analysis & Uplink Feedback (2)

10 PACS CoP & PV Review21/22 Jan 2009 CoP Plan and Timeline10 Analysis & Uplink Feedback (3) Analysis procedures for: FDIR, SFT HeII, FFT, SPT-SPEC and SPT-PHOT exercised already twice during IST (report available) and TBTV (report in progress). A similar report will be generated based on the results of these tests during commissioning phase.


Download ppt "PACS CoP & PV Review21/22 Jan 2009 CoP Plan and Timeline1 CoP Preparation H. Feuchtgruber."