A Nordic Example “The Development of Wind Power in Denmark” Presented by Jørgen K. Lemming Risø DTU.

Slides:



Advertisements
Similar presentations
LEAVING A POSITIVE LEGACY. Future generations of Vermonters will benefit. Choosing clean energy sources, like wind, is the responsible thing to do. As.
Advertisements

Danish wind power plans by 2030 Outi Kartano Janne Tuunanen.
Offshore Wind 2004 From Vindeby to Nysted A Manufacturer’s Experience Henrik Stiesdal Bonus Energy A/S.
Denmark: The Current Global Leader in the Wind Energy Field.
Ilinca Julian, Heikki Ojanen, Juha - Matti Lukkari.
Norwegian Water Resources and Energy Directorate
Show guidelines, which are useful when placing elements and photos: 1. Rightclick on the slide and choose ’Grid and Guides’ 2. Check ’Display drawing guides.
The Need for an Energy Grid in the Maldives
Longyuan Mulilo De Aar 2 WEF MW Onshore Wind Energy Facility
Energy Year 2013 Electricity Finnish Energy Industries.
1 LNI & JMJ, SmartGrid 2nd General Assembly Danish TSO Research and Demonstration Activities towards a Future Smart grid EcoGrid Energinet.dk, PMFU section.
Deep Water Offshore Wind Energy By Paul D. Sclavounos Horns Rev Wind Farm (Denmark) - Rated Power 160 MW – Water Depth 10-15m.
World Market Update 2002 March Page 1 - Market Status - Demand Side Supply Side - Market Forecast - Forecast until 2007 Predictions
Introduction to the EnergyPLAN model Henrik Lund Aalborg University Denmark Aalborg University, September October 2005 PhD-course: Energy System Analysis.
BALTIC ELECTRICITY REGIONAL INITIATIVE Riga, 24 April, 2009 LATEST UPDATE IN LATVIA Ainārs Meņģelsons Public Utilities Commission.
BUSINESS and POLICY BB1: Leading EU markets: achieving the vision Wind Energy in Italy: policy framework, incentives, industry and market development Luciano.
Imbalance costs of wind power – how to improve the market integration of wind power Hannele Holttinen Senior Research Scientist, Team leader.
1 Adviser : Dr. Yuan-Kang Wu Student : Ti-Chun Yeh Date : A review of wind energy technologies.
Greta’s Grand Valley Wind Farm Contributing to Ontario’s Energy Future March, 2012 Greta Energy Inc.
11 Energy in Denmark Observed energy consumption and adjusted gross energy consumption.
Wind Energy in Morocco Resources, Potential & Projects Presented by M. Mustapha ENZILI Responsible of Wind Department Renewable Energy Development Center.
Wind Turbines and Water Heaters Load Control For Providing Power System Balancing Services Ken Dragoon Renewable Northwest Project PNDRP July 2010.
VetroEnergo AS Wind Power at the Kola Peninsula Presentation at Bellona Conference 1-2. April 2008 Lars Helge Helvig, Norsk Vind Energi AS.
New Offshore Wind Tenders in Denmark 1,450 MW before 2020.
17/04/2008Presentation name1Risø DTU, Technical University of Denmark Technology developments and R&D landscape: Research overview from Risø Peter Hauge.
The impacts of hourly variations of large scale wind power production in the Nordic countries on the system regulation needs Hannele Holttinen.
Strategic Research Agenda and Roadmaps in Denmark: the Wind Example Per Dannemand Andersen & Lykke Margot Ricard Presentation.
Renewable Energy Technology Deployment and Danish Experiences Senior Policy Advisor Annette Schou.
IceWind project TFI Annual Conference September 2010 Niels-Erik Clausen Wind Energy Division, Risø DTU.
Turkish Power System Overview March 2012
[Legislative] [Danish Policy] Energy 2000, Target to reduce CO2 emissions in 2005 by 20% compared to 1988 levels. Energy 21, Reinforce targets.
SYSLAB A platform for research and testing of decentralised energy resource based power systems Henrik Bindner Wind Energy Systems Wind Energy Division.
Prof. R. Shanthini 02 Feb 2013 Module 06 Renewable Energy (RE) Technologies & Impacts (continued) - Use of RE sources in electricity generation, in transport,
German Offshore Wind Strategy1 German Policies on Offshore Wind Energy Cornelia Viertl / Jens Bömer Division KI I 3 / Hydropower and Wind Energy.
Governors’ Wind Energy Coalition Conference Dennis Duffy December 10, 2009.
Status of the German Wind Energy Market and Prospects for the Future Claudia Grotz German WindEnergy Association (BWE) EWEC 2007 in Milan, Italy.
DOE Peer Review May 10, 2006 Golden, CO Walt Musial Leader-Offshore Projects National Renewable Energy Laboratory Offshore Wind.
Learning from Feed-in Tariffs Dr. Axel Bree "Data Gathering on Renewable Energies for the New Member States and Candidate Countries" th November.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
Riga 4th December 2008 Renewable energy: is there a Latvian masterplan? Ieva Indriksone Riga Graduate School of Law.
Märt Ots Estonian Competition Authority Baltic Electricity Market Forum Riga Latest developments in Estonia.
Wind, Wind Power and Vestas Implementation of Wind Power.
FUTURE FOR OFFSHORE WIND ENERGY IN SPAIN Wind Energy Department
11 Energy in Denmark Observed energy consumption and adjusted gross energy consumption.
08/12/2015 Developing renewable energy cost effectively EUROPEAN COMMISSION Tom Howes European Commission.
Wind Energy in Denmark Industry and framework Camilla Holbech, Senior Policy Adviser Danish Wind Industry Association.
FRANCE RE PRODUCTION 2009/2013 Eurobserver WIND POWER ENERGY France has the third wind power production rank in the EC. yearsCapacity MWOUTPUT twh.
INVOLAR Microinverters Evaluation of ROI of a 3 kW PV system.
An Overview of the Technology and Economics of Offshore Wind Farms
Vestas.com Texas/European Union Wind Energy Symposium October 2009 Dr. Carsten Hein Westergaard Vestas Technology R&D Americas, Inc.
SHP – Columbia University
District heating in Sweden 1 District heating in Sweden - Swedish Heat market challenges Erik Thornström Head of Energy policy, CHP and EU-coordination.
EnergyTour November Copenhagen Energy Summit Energy Tour District Heating in Denmark Mr Jan Elleriis, Vice President, Metropolitan Copenhagen Heating.
Eng Salma Hussien Egyptian Electric Regulatory and Consumer Protection Agency Renewable Energy Strategy Plan.
Restricted © Siemens AG 2014 All rights reserved.siemens.com/answers Passion for Offshore - Frank Zimmermann, Head of Sales - 5 th British Chamber Conference.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Wind Power in Korea Seokwoo Kim, Ph. D Korea Institute of Energy Research Daejeon, Korea.
Towards 100% RE in Denmark in 2050 Jakob Jespersen Danish Energy Agency Hai Phong, 17 December 2013 – the role of wind energy.
Offshore Wind ENERGY – SUSTAINABLE, ECONOMICAL, sAFE
Operation of power systems with high shares of wind power
Structural Reliability Aspects in Design of Wind Turbines
Wind Power: Energy, Environment, and Economics
Latest developments in Estonia
in the Russian Federation
The Austrian promotion scheme for green electricity Günter Pauritsch Workshop on renewable energy sources Sofia, 21 December 2011 Austrian Energy Agency.
An overview of wind energy 3/5/2018
Energy in Denmark 2014 Danish Energy Agency.
Evaluation of wind farm layouts
Sabine Schmedding, 11/06/18, Ho Chi Minh City
Presentation transcript:

A Nordic Example “The Development of Wind Power in Denmark” Presented by Jørgen K. Lemming Risø DTU

04/12/2008Riga December 20082Risø DTU, Technical University of Denmark Content of presentation Status for Wind power development in Denmark Present policy for wind Early Technology development (from small to large turbines) Resources and Mesurement og Wind Test and certification (safety and quality) Integration (Grid Access, Wind power and other RE resources) Industry (turnover for industry, exports) Offshore development (large scale)

04/12/2008Riga December 20083Risø DTU, Technical University of Denmark Status of development

04/12/2008Riga December 20084Risø DTU, Technical University of Denmark Development of Wind Power in Denmark

04/12/2008Riga December 20085Risø DTU, Technical University of Denmark Renewable energy policy Long term goal The share of renewable energy must be increased to at least 30% of energy consumption by (EU goal 20% 2020). Policy Agreement 2008 The majority of the parties in the Parliament agree that renewable energy should cover 20% of Danish gross energy consumption in This corresponds to 22.4% renewable energy relative to final energy consumption.

04/12/2008Riga December 20086Risø DTU, Technical University of Denmark 2008 Energy policy: Better terms for wind turbines A renewable energy law to create greater transparency with respect to the legislative framework for the use of renewable energy. Better subsidy terms for new onshore wind turbines. Follow-up of re-powering regulations. Wind planning in the municipalities, including a green fund for restoring nature. 10 million DKK guaranteed financing to local wind project preliminary studies, etc. Possibility of economic compensation to neighbours for loss of property value due to new wind turbines. Possibility of local joint ownership. New offshore wind parks in 2012; tender for 2 times 200 MW late Action plan for developing offshore wind turbines. Survey of conditions for small wind turbines.

04/12/2008Riga December 20087Risø DTU, Technical University of Denmark Danish Subsidy terms for new wind turbines on land A replacement of the previous price premium of 0.10 DKK/kWh over the market price with a premium of 0.25 DKK/kWh for 22,000 peak load hours. A wind turbine at an average inland location typically takes about nine years to produce the equivalent of 22,000 peak load hours, whereas one at a good coastal location will take about seven years. A continued premium of DKK/kWh for compensation for balancing costs, etc. as at present. An additional DKK/kWh to cover wind turbine owners' contribution to a green fund. Scrapping regulations New turbines will receive the new price premium plus an extra supplement of 0.08 DKK/kWh for the first 12,000 peak load hours. The new extra premium replaces the current premium of 0.12 DKK/kWh which was adjusted to 0 DKK/kWh in pace with the market price increase from 0.26 to 0.38 DKK/kWh.

04/12/2008Riga December 20088Risø DTU, Technical University of Denmark Support scheme for offshore wind turbines Large scale project Tender – Cheapest, fastest and most beautiful Fixed price in full load hours = years of production Lowest bid for Horns Rev 2 = app. € cent 7 per kWh Lowest bid Rødsand II (after re-tendering) app. € cent 8 per kWh Other projects Premium financed as PSO added on top of market price

04/12/2008Riga December 20089Risø DTU, Technical University of Denmark New Deployment of Wind Power in DK Existing and approved off-shore capacity (1225 MW) = 12% of total electricity consumption in Potentials = 50% of electricity consumption. Under construction Horns Rev II 200 MW 2009 Approved Rødsand II 200 MW 2011 Re-powering 350 MW Decided offshore Wind Power Anholt 400 MW 2012 New Onshore 2011 – 75 MW New Onshore 2010 – 75 MW Total new installation of Wind Power up : 1300 MW

04/12/2008Riga December Risø DTU, Technical University of Denmark EARLY DANISH TECHNOLGY DEVELOPMENT

04/12/2008Riga December Risø DTU, Technical University of Denmark Askov Test center (Poul La Cour 1897) Testing of Wind Elcetricity producing Turbines Aerodynamics and wind tunnel for experiments Consulting and teaching in Electrification of the Country

04/12/2008Riga December Risø DTU, Technical University of Denmark  The Gedser wind turbine operated the ancestor of  The Danish Wind Turbine Concept  3-bladed  up-wind  automatic controls  active yaw  asynchronous generators  Generation (15-55kW) Udvikling

04/12/2008Riga December Risø DTU, Technical University of Denmark Risager 30 kW 1978 Development of the modern Wind Turbine Gedser 200 kW 1959 Tjæreborg 2MW 1985 Vestas 3 MW 55 kW 660 kW 2 MW Tvind

04/12/2008Riga December Risø DTU, Technical University of Denmark Size of Wind Turbines Hub height 150 m 100 m m

04/12/2008Riga December Risø DTU, Technical University of Denmark m Ø 12 m Ø 80 m Ø 65 m Ø ? Size of commercial wind turbines at first market introduction

04/12/2008Riga December Risø DTU, Technical University of Denmark Made by Henrik Stiesdal, Siemens

04/12/2008Riga December Risø DTU, Technical University of Denmark RESOURCES AND MEASUREMENT OF WIND

04/12/2008Riga December Risø DTU, Technical University of Denmark Wind Resource Map for Denmark

04/12/2008Riga December Risø DTU, Technical University of Denmark Short-Term Prediction Numerical Weather Prediction Prediction model Online data Orography Roughness Wind farm layout End user Prediction of wind farm output hours ahead

04/12/2008Riga December Risø DTU, Technical University of Denmark The Høvsøre Test Station and the experimental setup Research on different types of lidars

04/12/2008Riga December Risø DTU, Technical University of Denmark TESTING AND CERTIFICATION

04/12/2008Riga December Risø DTU, Technical University of Denmark Testing of turbines and Components Old Risø test site

04/12/2008Riga December Risø DTU, Technical University of Denmark Test site at Høvsøre

04/12/2008Riga December Risø DTU, Technical University of Denmark Blade Testing

04/12/2008Riga December Risø DTU, Technical University of Denmark History in brief: System Approval from Type Approval scheme from 1991 Type approval of wind turbines Quality assurance Danish Standard DS 472 on Loads and Safety of Wind Turbine Constructions New Approval Scheme based on IEC WT 01 and international standards (61400-xx) ultimo 2004 New Regulators rules for grid connection July 2004 New rules for small Wind turbines < 5 m New rules for Maintenance of turbines The Danish Technical Certification Scheme for Design, Manufacture and installation of Wind Turbines

04/12/2008Riga December Risø DTU, Technical University of Denmark IEC Standards and Technical Specifications and Reports IEC , ed.3,Safety Requirements IEC , ed. 2,Safety Req of Small WT (< 200m 2 rotor) IEC Safety of Offshore WT IEC Noise Measurements IEC Power Curve Measurem. IEC/TS Strength Measurements IEC Power Quality IEC/TS Blade Testing IEC/TR Lightning Protection IEC WT 01Certification of WT

04/12/2008Riga December Risø DTU, Technical University of Denmark New Maintenance and Service Scheme After July all turbines in Denmark have to be service by a certified or approved service company according to the specification set by the manufacture. Except very small. Owners must report to the Energinet.dk each time a regular service has been carried out and the time for the next. Spot checks will be carried out.

04/12/2008Riga December Risø DTU, Technical University of Denmark INTEGRATION

04/12/2008Riga December Risø DTU, Technical University of Denmark

04/12/2008Riga December Risø DTU, Technical University of Denmark Production record January 2005 – 1076 GWH ~ 32% of total demand. 41 % in western Denmark (old Eltra area)

04/12/2008Riga December Risø DTU, Technical University of Denmark SYSLAB – Distributed Energy System Laboratory Distributed control –Embedded intelligence –Self-organizing Communication Flexibility –FlexHouse –Demand response –Vanadium battery –Hybrid/Electric car High wind energy penetration

04/12/2008Riga December Risø DTU, Technical University of Denmark DANISH INDUSTRY

04/12/2008Riga December Risø DTU, Technical University of Denmark Industry activities With two large manufactures in Denmark the Danish manufactures still had a large share the world market in 2007 (nearly 30 %). The largest manufacture was Vestas selling 4,503 MW in 2007 (22,8 % of the world market) Siemens/Bonus sold 1,397 MW in 2007 (7.1 % of the world market). The turnover in the wind industry in 2007 was more than 65 billion DDK. Nearly all of the production of turbines is exported for a net value of 35 billion DDK. Employing in Denmark more than 23,500 people.

04/12/2008Riga December Risø DTU, Technical University of Denmark

04/12/2008Riga December Risø DTU, Technical University of Denmark OFFSHORE DEVELOPMENT I DENMARK

04/12/2008Riga December Risø DTU, Technical University of Denmark Offshore development in Denmark Vindeby 5 MW (1991) 2. Tunø Knob 5 MW (1995) 3. Middelgrunden 40 MW (2001) 4. Horns Rev I 160 MW (2002) 5. Samsoe 23 MW (2003) 6. Roenland 17 MW (2003) 7. Frederikshavn 10.6 MW (2003) 8. Nysted-Roedsand 165 (2003) 9. Grenå 6 MW (?) 10. Horns Rev II, 200 MW (2010) 11. Roedsand II, 200 MW (2011)

04/12/2008Riga December Risø DTU, Technical University of Denmark Danish Pilot projects Vindeby 1991: 11 x 450kW, 2-3 km off-shore Tunø Knob 1995: 10 x 500kW, 5 -6 km off-shore Middelgrunden 2001: 20 x 2 MW, 1,5-2,5 km off-shore

04/12/2008Riga December Risø DTU, Technical University of Denmark Distance to land (Horns Rev km, Nysted 8-10 Km) 80 wind turbines Internal 36 kV cabling 150 kV cabling to major grid on land Nysted Horns Rev and Nysted Offshore Wind Farms

04/12/2008Riga December Risø DTU, Technical University of Denmark Horns Rev 160MW

04/12/2008Riga December Risø DTU, Technical University of Denmark Horns Rev- 80 møller 160 MW Photos: ELSAM A/S

04/12/2008Riga December Risø DTU, Technical University of Denmark Development of new foundation types A bucket-foundation A Gravaty Foundation A Monopile

04/12/2008Riga December Risø DTU, Technical University of Denmark Plans for future offshore wind farms Report on future Offshore sites Update of action plan from Sites each 44 km2 for a capacity of 4600 MW Wind Power Production 18 TWh, or just over 8% of total energy consumption in Denmark or approximately 50% of Danish electricity consumption cs/Publikationer/Havvind moeller/Fremtidens_%20 havvindm_UKsummery_a ug07.pdfhttp:// cs/Publikationer/Havvind moeller/Fremtidens_%20 havvindm_UKsummery_a ug07.pdf

04/12/2008Riga December Risø DTU, Technical University of Denmark Thank you for your attention