Florida Gas Transmission Mainline Hydrostatic Test From the Golden Glades Interchange to the interchange of NW 122 nd Street with the Palmetto Expressway.

Slides:



Advertisements
Similar presentations
Background Presenters Work done in preparation for WHS changes
Advertisements

Managed Lanes Development Strategy Phase I District Four October 17, 2012.
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
Expanding the Potential of Tolling: A 21 st Century Look AASHTO November 18, Brian Peters Florida DOT, Assistant Secretary of Finance and Administration.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
Demonstration Grant PARTNERS FOR PIPELINE SAFETY WEB PAGES Develop interactive and informative webpage for residents, property owners, contractors and.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Updating Boulder’s work zone traffic control guidelines Marni Ratzel Bicycle & Pedestrian Transportation Planner GO Boulder/city of Boulder.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
Copper Theft Update Mayor and Council May 22, 2012.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
Mario Fiorillo – Transportation – Civil Mario Fiorillo Present work experience Florida If you have any questions please me at
District 6 Public Transportation Office Commuter Assistance Program ACTIVITY REPORT
Florida Gas Transmission Section #2 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From Tampa By-Pass Canal to East of Lake Magdalene Hillsborough.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
Florida Gas Transmission Mainline Hydrostatic Test From the Palmetto Expressway Interchange with Okeechobee Road to the Intersection of Milam Dairy Road.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
The Miami Intermodal Center September 23, 2009 Is Becoming a Reality!
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
PAPAL VISIT 2015 CITIZEN ADVISORY LOWER PROVIDENCE TOWNSHIP.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Florida Gas Transmission Section #1 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From Compressor Station 30 (Plant City West) to Main Line.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
Enhanced 511: Beyond the Basics Jerry Woods Florida DOT – District 5 iFlorida - Automated Message Generation Based on Travel Times.
December 2006 Study Update We’ve been busy since our last round of advisory committee and task force meetings were held in the summer and fall. Our next.
“Reverse-Laning” I-65 for Hurricane Evacuations “Reverse-Laning” I-65 for Hurricane Evacuations.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
Florida Gas Transmission 16-Inch Section#2 Hydrostatic Test
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve B) to US-19 North of SR 688/Ulmerton.
HWY 192 – Traffic Crash Study Common Goal – To improve the quality of life in the City of Kissimmee by reducing the number and severity of Traffic crashes.
Premium Transit District 4, Office of Modal Development Making the Connection.
Pipeline Safety – 2015 Year in Review. Large PHMSA Budget Increase Pipeline Safety spending in 2015 was increased $26.9 million. Main areas of expansion.
Interstate 95 Managed Lanes PD&E Study (95 Express) Project Development and Environment Study SE FSUTMS Users Group The Corradino Group November 2, 2007.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
1Regierungsbaumeister Michael Ilk - Landeshauptstadt Stuttgart, Tiefbauamt Co-ordinating Street and Highway Works in the City of Stuttgart.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
Program Manager Administrator
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
North Dakota’s Experience Work Zone Focus State Workshop April 19, 2005.
2007 Incident Management Summit Sri Balasubramanian Chief, Office of Emergency Management Division of Maintenance California Department Of Transportation.
The Pipeline Safety Trust “Restoring Trust In Pipeline Safety” New Orleans, LA November 2-3, 2006 Nate Muehl Damage Prevention & ROW Relations Manager.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
Community Pipeline Safety Initiative – St. Helena 1 Community Pipeline Safety Initiative City of St. Helena Tree Commission May 12, 2016.
Florida Gas Transmission 16-Inch Section#1 Hydrostatic Test 16-Inch Saint Petersburg Lateral Pipeline From Polk City to Lakeland Polk County.
THE PALM BEACH COUNTY LEAGUE OF CITIES.
CITY OF HALLANDALE BEACH
How To Read MS811 Locate Request Tickets
FDOT Emergency Shoulder Use (ESU) & One-Way Corridors
Florida Gas Transmission Mainline Hydrostatic Test
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
Florida Gas Transmission Mainline Hydrostatic Test
Florida Gas Transmission 16-Inch Section#1 Hydrostatic Test
Trident Group, Inc
PUBLIC NOTICE OF POLLUTION
SD INTRASTATE PUBLIC EDUCATION
Florida Gas Transmission Mainline Hydrostatic Test
Florida Gas Transmission Mainline Hydrostatic Test
PROJ. 566(17) LOR PID MAJOR WIDENING
Harbour Island Force Main Replacement
SD INTRASTATE PUBLIC EDUCATION
Presentation transcript:

Florida Gas Transmission Mainline Hydrostatic Test From the Golden Glades Interchange to the interchange of NW 122 nd Street with the Palmetto Expressway Miami-Dade County

 Who is Florida Gas Transmission (FGT)?  Why is FGT testing?  What is the test exactly?  When will the test occur?  Where will the test take place?  How will the test be conducted?  How will the test affect me? Today’s Outline 2

 Natural gas transmission company operating a 5,000 mile pipeline system along the Gulf  Provide all of the natural gas for power generation in Miami-Dade County  18” diameter Mainline serving South Florida  Customers include:  Electric utility companies  Local distributors  Industrial clients Florida Gas Transmission Company 3

 The U.S. Department of Transportation regulates all interstate pipelines  Testing is federally mandated  Best practice to confirm the safety and reliability of the pipeline  Safety is our #1 priority  Ensure continued superb customer service Need for the Test 4

 Hydrostatic Test  Remove the natural gas from the line Controlled release vents harmlessly into atmosphere Service is maintained on another system  Test the integrity of the pipeline by filling the line with water Put the water under pressure for a fixed period of time Nature of the Test 5

 Hydrotesting the 18” Mainline system  Standard, common pipeline test procedure  Recent, successful 18” Mainline tests were completed in:  Saint Lucie  Palm Beach  Last Miami-Dade test done April 2011 Background  Martin  Broward 6

Public Awareness Campaign Project Process Begin Project Obtain Permits Prepare System for Testing Conduct Hydrotest End Project 7

 Test window is set:  Early morning Thursday 10 April 2014  Coordinated with FP&L and regulators Project Schedule 8

 Total Project Length = 10.2 miles  Begin: Golden Glades Interchange  End: NW 122 nd Street  Generally, along the Palmetto Expressway  Within the limits of:  City of Miami Gardens  Town of Miami Lakes  City of Hialeah  Unincorporated Miami-Dade County Project Location 9

Project Location (con’t) Project Limit N 10

 Remove natural gas from the 18” Mainline  Completed the week before the hydrotest  Fill the line with water  Pressurize the system  Normal operating pressure is 722 PSI  Test pressure is up to 1,444 PSI Relatively short duration (approx. 30 minutes)  Reduce to intermediate pressure at 1,108 PSI Maintain for 8 hours How the Test is Performed 11

 De-pressurize the line  Drain the water from the system  If any integrity issues are found:  They are corrected as soon as possible  The hydrotest is performed again Any re-testing must be performed within the prescribed test window timeframe  Resume normal natural gas service How the Test is Performed (con’t) 12

 Safety is our #1 priority  Performed extensive test preparations, including an inspection of the entire system  Any pipe anomalies will be repaired in advance of conducting the hydrotest  For the duration of the high pressure test, as a safety consideration, we plan to isolate sections of the pipeline route from people and traffic Safety During the Test 13

 Advance Preparations  Make all key stakeholders aware Adjacent property owners Emergency service providers General driving public  Announcements Flyers, newspaper, FL511, website, etc.  Dynamic message signs 2 weeks in advance Conducting the Test 14

 Night of the Test  Begin at midnight  Close ramps/roads/lanes with barricades  Law enforcement support  Confirm all-clear along the 10.2-mile corridor  Conduct hydrotest  Reopen roadways at approximately 4:00 AM Conducting the Test (Con’t) 15

 General Utility Permit from the Florida Department of Transportation is in process  Officers will be stationed at ramp and road closures and at detours  Traffic will be detoured from:  Turnpike  I-95  Palmetto Expressway Traffic Control During the Test 16

Project Location – District 1 17

Project Location – District 13 18

Project Location – District 12 19

Please visit our website: Or contact FGT: Mr. Terry Coleman 2405 Lucien Way, Suite 200 Maitland, FL Toll Free – 844.FGT.INFO ( ) Office – Fax – – For More Information 20

FGT 18” Mainline Hydrotest Summary  Federal mandate  Testing with water  Test window is set for Thursday 10 April 2013  Midnight – 4:00 AM  10.2 mile section of pipe  Detours for Turnpike, I-95, Palmetto Expressway  Law enforcement support Project Limit N 21

Thank You 22