Feedback from MEF  Only possible, if COMMON COORDINATION MEETINGS  Main possible conflict: SAFETY –No “work permits” in the injectors. MEF working on.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

Etienne CARLIER AB/BT/EC
September 24, The ‘history’ program Yi Chih Liu Operation Group Taiwan Light Source.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
Friday, h10: Stable beams at 1.38 TeV. 09h03: Beam dump.  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 10h36:
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
SPS RESTARTING AFTER LS1 05/03/2015 Stéphane Cettour Cavé.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
1 Beam Plans for Accelerator Systems: The Machine Protection System Jan Uythoven On behalf of the MPWG and the MPS Commissioning WG Special thanks to R.Schmidt,
SPS re-commissioning with beam K. Cornelis PS-SPS days.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
ADT re-commissioning after LS1 A. Butterworth, W. Höfle, F. Killing, G. Kotzian, T. Levens, D. Valuch with many thanks to BE/OP LBOC, ADT re-commissioning.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Status of KEK 150MeV FFAG M. Aiba (KEK) For KEK FFAG Gr. FFAG’05, 5 to 9 Dec., KURRI.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
Schedule IT General Schedule 9 th, September 09 Today.
Dry runs and cold checkout Markus Albert, Reyes Alemany, Rossano Giachino, Delphine Jacquet, Verena Kain, Belen Salvachua Ferrando, Matteo Solfaroli Camillocci.
Proton Source Improvement Workshop Cogging W. Pellico Dec 6&
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
ELENA EXTRACTION LINES W. Bartmann, D. Barna, M. Fraser, J. Jentzsch, R. Ostojic ELENA Commissioning discussion, 23th November, 2015.
Transfer Line Test preparation meeting V. Kain, R. Alemany.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
CLIC Interlock System study: from Principle to Prototyping Patrice Nouvel TE-MPE-EP TE-MPE Technical Meeting : 22/03/2012.
1 Machine Checkout and Setup Periods Jan Uythoven Thanks to: O.Aberle, R.Bailey, F.Bordry, O.Brunner, L.Bottura, E.Carlier, P.Charrue, E.Ciapala, S.Claudet,
PSB H - injection system commissioning J.Borburgh, C.Bracco, C.Carli, E.Carlier, B.Goddard, K.Hanke, B.Mikulec, J.Hansen, C.Maglioni, A.Newborough, D.Nisbet,
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
The Dashboard The Working Conditions The Common Chapters State What’s Next.
PC Current Interlocking for the SPS Fast Extractions. 1 J. Wenninger July 2009.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.
Design process of the Interlock Systems Patrice Nouvel - CERN / Institut National Polytechnique de Toulouse CLIC Workshop Accelerator / Parameters.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Low Level RF system group Thomas Schilcher :: Paul Scherrer Institut SwissFEL.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
R. Alemany & V. Kain, 21 st of April ‘09 LHC Dry Run- Week 14 oGoal: run injection and TL BI (fixed displays, logging, applications) plus injection BI,
LHC Beam Commissioning Meeting V. Kain & R. Alemany
Data providers Volume & Type of Analysis Kickers
The TV Beam Observation system - BTV
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Injector De-cabling Project
SLS Timing Master Timo Korhonen, PSI.
Injectors BLM system: PS Ring installation at EYETS
LINAC4 50 MeV phase BIS STATUS
Jan Uythoven For discussion
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
LHC injection W. Bartmann, M.J. Barnes, C. Bracco, F. Burkart, E. Carlier, B. Goddard, V. Kain, R. Steerenberg, L. Stoel, F. Velotti, C. Wiesner, C. Xu.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
A/N 26 16:00 Access finished problem with the BLM test. one crate is failing the beam permit test. Fixed. Access required in sector 78 for QPS to fix a.
Thursday morning – optics correction
Wednesday 31 October: Morning
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
Monday 24 October hours of 25ns MD
Machine Protection System Commissioning plans
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
ThomX – Commissioning Meeting – 25/01/2018
New page for summary of test status
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Review of hardware commissioning
Presentation transcript:

Feedback from MEF  Only possible, if COMMON COORDINATION MEETINGS  Main possible conflict: SAFETY –No “work permits” in the injectors. MEF working on procedure for injectors for end of september  Machine responsible should come to meetings already NOW!!!! Injector Re-commissioning WG1 Machine Preparation Beam Hardware tests Beam Check out Access possible No access foreseen time Machine responsible point of view Equipment expert point of view Deadline: controls readiness

Feedback from MEF (II)  We will start discussing machine responsible per machine soon  Need name per machine for September Injector Re-commissioning WG2

WHAT TO TEST, HOW TO TEST Injector Re-commissioning WG3

As this was not clear last meeting…  Essentially: try to run the equipment in the same way, as you would with beam, without beam. Examples:  Power converters: –Timing cycle loaded –Generate operational function for a given cycle.  Optics loaded  Transfer functions OK –Drive (= load the settings with the operational application) –start and stop with operational application (timing, sequencer) –Current acquisition –Check ripple –Check whether power converter can follow well –Imin OK. –Check logging –Check fixed display, page 1 signals, OASIS acquisition, FEI and SIS –… Injector Re-commissioning WG4

A few more remarks concerning testing  Example: preparation for operation of HiRadMat: dry run –HiRadMat cycle, extraction events on –Extraction pre-pulse generation –Check acquisition of all BI in extraction region and transfer lines:  Operational applications: thresholds generated,…  Logging –Try to calculate kick in the transfer line with YASP  Check whether can send it…verifies generation, etc… –Check interlocks and obtain green light –Move TEDs (depends on access conditions) –Pulse extraction kickers with energy tracking system Injector Re-commissioning WG5