Development Alternatives Baselines, Additionality & Monitoring Methodologies For Orientation Workshop on March 25-26, 2004 Udit Mathur Climate Change Centre.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

SSC-NM0053 Determination of Greenhouse Gas Emissions Reductions Based on Whole- Building Simulation of Building Mitigation Efforts Using eQUEST/DOE-2.2.
Carbon credits - origination to commercialisation© 2006 EcoSecurities Group plc Undertaking CDM Projects in Africa – Challenges, Trends and Opportunities.
Implementation of the Suppressed Demand Guidelines in New and Existing SSC Methodologies Carolyn Luce, Small Scale Working Group Member FIRST SDM JOINT.
Energy Conservation Energy Management.
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions reduction George Mavrotas.
Clean Energy Project Analysis Course Greenhouse Gas Emission Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo.
Fundamentals of PDD Analysis Recap of Theory and presentation of an illustrative PDD by Steve Thorne Maputo second SSA regional workshop 17 August 2004.
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
World Bank Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities December 3, 2005 Montreal.
Input-Output Analysis of Climate Change: Case Study of Efficiency Driven Policy Choice of Indian Response Strategy Joyashree Roy Jadavpur University, Kolkata,
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
A.K.Perumal, CDM – Methodology Panel,SSC-WG, RIT and AT member 25 th March 2012.
China Thermal Power Efficiency Project WB support to the improvement of coal-fired power generation efficiency in China Jie Tang Energy Specialist East.
Methodological Issues Arising Across Different Types of Energy Efficiency Projects QualityTonnes Kevin James Montreal December 3, 2005.
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
CLIMATE CHANGE AND SME FINANCING 9 – 10 October 2013, Sofia Greenhouse gases emission assessment in SME and Household sectors – current status and tendency.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
Solar Geysers – a CDM perspective TATA BP Solar case study.
Standardized approaches in CDM methodologies Daniel Perczyk 7th Joint Workshop 13/03/2011.
Development Alternatives Baselines & Additionality Methodologies Workshop on Clean Development Mechanism: Opportunities in Rajasthan January 28-29, 2005.
Technical aspects of NAMAs: Options and methodologies for developing baselines for different categories of NAMAs* Neha Pahuja Associate.
Case Study 5: Gemina rice husk project, Nicaragua Sandra Greiner Carbon Finance Unit The World Bank World Bank methodology event.
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Workshop on January 28 th – 29 th, 2005.
“Baselines for Small-scale CDM " Jørgen Fenhann, UNEP Risø Centre National CD4CDM workshop Casablanca January Content of the presentation: Present.
CDM Methodologies and Project Design: Workshop for CDM Project Developers 12/5/2004. Buenos Aires. Analysis of the Additionality Tool (with project examples)
Simplified Financial Analysis for Landfill Gas Capture Projects Presented By: Dr. M. K. Elewa TIMS - Egypt Approved Baseline and Monitoring Methodology.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA.
CD4CDMCD4CDM Estimating CO 2 Emissions Reduction by example.
CDM Project Developers Workshop.  Boundaries & Leakage  Calculating emissions reductions  Any other issues Session II.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
CDM Project Developers Workshop.  Baselines – what, types of baselines, baseline scenarios, baseline emissions.  Additionality – what, why, how  Establishing.
Development Alternatives 1 CDM PROJECT ON ENERGY EFFICIENCY INITIATIVES AT LOTUS SUITES AND THE ORCHID HOTEL, MUMBAI BY MALLIKA ROY DEVELOPMENT ALTERNATIVES.
Additionality and Project Cycle Tunis, August 27-29, 2004 TIMS/EEAA CD4CDM- Fourth Regional Workshop (Phase II) UNEP RISOE / APEXAdditionality in NovaGerar.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
Baseline Cairo, March 31 & April 1, 2004 TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEXPotential CDM Project for a Landfill in.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
1 Synergies Between Climate Change Financing Mechanisms: Options for China The PCF/CC Synergy Workshop.
CDM - PDD- Thu duc Plant Sep., 11, 2003 Preliminary findings of PDD– CDM model project for Thuduc fuel switching plant Master Nguyen Thi Kim Lien International.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
AIT Baselines and Additionality Sudhir Sharma Asian Institute of Technology Bangkok, Thailand 24 th March 2004.
UNEP Collaborating Centre on Energy and Environment CDM developments Njeri Wamukonya Regional CD workshop, 3-4 March 2003, NBI.
UNEP Collaborating Centre on Energy and Environment Rules for Small-Scale CDM Projects Prepared for the CD4CDM Regional Workshop in Tunis January.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
El Gallo Hydroelectricity Project PDD Analysis
1 Case study: Sofia District Heating Dr. Venkata R. Putti Team Leader, Carbon Finance Assist The World Bank Minsk / Belarus, March 2007.
0 National Inter-Ministerial Dialogue on Climate Change Cape Hotel Monrovia, Liberia June 25, 2009 Assessing and Developing Policy Options for Addressing.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Baseline for wind energy project in Tunisia Second National.
Clean Energy Project Analysis Course Clean Energy Project Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – 2004.
CDM Project Design Document CDM Project Design Document Training Course May 22, 2003 CCIC Conference Room Manila Observatory Ateneo de Manila University.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Baseline approaches and methodologies: interpretation of Para 48(a)-(c) M&P Buenos Aires, – December 5 th, 2004 Johannes Heister – World Bank, Carbon Finance.
Visit of the S. Korean delegation UNEP Risø Centre, 1 September 2005 Jørgen Fenhann Analysis of the CDM project pipeline Content of the presentation: What.
Kenya’s INDC: Actions in the Energy Sector
Presentation title Methodological tool and data for the development of a SB for the emission factor of an electricity system CDM Standardized Baselines:
Mitigation Targets and Actions under Sierra Leone’s NDC
Seminar On Energy Audit Submitted To: Submitted By:
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Standardized Baselines
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

Development Alternatives Baselines, Additionality & Monitoring Methodologies For Orientation Workshop on March 25-26, 2004 Udit Mathur Climate Change Centre

Development Alternatives What is a Baseline “The baseline for a CDM project activity that reasonably represents the anthropogenic emissions by sources of greenhouse gases that would occur in the absence of the proposed project activity.” The Marrakech Accords

Development Alternatives BASELINE (4) CDM Project (2) (1) (3) t Emission

Development Alternatives BASELINE DETERMINATION Baseline should be established:  By project participants using approved/new methodologies  In a transparent and conservative manner, taking into account uncertainty  On a project – specific basis  For small scale projects, as per simplified procedures  Taking into account relevant policies and economic situation in the project sector

Development Alternatives Approaches to Baseline Determination  Existing actual or historical emissions  Emissions from a technology representing economically attractive course of action, taking into account barriers to investment  Average emissions of similar project activities undertaken in previous five years in similar circumstances and are in top 20% performance-wise

Development Alternatives BASELINE VALIDITY  Maximum of seven years, renewable at most two times, or  Maximum of 10 years with no option of renewal

Development Alternatives Baselines - Determination of the ‘anyway scenario’ - what would have taken place anyway  Questions  Data Availability  How fast are standard business practices changing ?  Emissions v/s technology benchmarks  Sectoral / national or project level ?  Static or dynamic ? Is it related to greenfield / retrofitting ?  Are there identifiable project barriers ?

Development Alternatives Baselines for Energy Efficiency Projects  EE Projects can be categorised as  Demand-side energy efficiency programmes for specific technologies  Energy efficiency and fuel switching measures for industrial facilities  Energy efficiency and fuel switching measures for buildings

Development Alternatives Baselines for Demand-side energy efficiency programmes for specific technologies  Comprises programmes that encourage the adoption of energy-efficient equipment at many sites  If energy displaced is fossil fuel,  Baseline = Amount of fuel * Emission Coefficient of fuel  If the energy displaced is electricity,  Baseline = Energy baseline * Emission Coefficient of grid Energy baseline = Σ(n i. p i. o i )/(1 - l)

Development Alternatives Baselines for Energy efficiency and fuel switching measures for industrial facilities  Comprises any energy efficiency and fuel switching measure implemented at a single industrial facility.  For retrofit measures Energy baseline = Energy use of equipment replaced  For new facilities Energy Baseline = energy use of the equipment that would otherwise be built in the case of a new facility. Emissions Baseline = Energy Baseline * Emission Coefficient  The energy baseline consists of the energy use of the existing equipment that is replaced in the case of retrofit measures and of the facility that would otherwise be built in the case of a new facility.

Development Alternatives Baselines for Energy efficiency and fuel switching measures for buildings  Comprises any energy efficiency and fuel switching measure implemented at a single building, or group of similar buildings Baseline Calculation same as the previous case

Development Alternatives Baselines for fuel switching measures  Comprises fossil fuel switching in existing industrial, residential, commercial, institutional or electricity generation applications.  Emissions Baseline = current emissions of the facility expressed as emissions per unit of output (e.g., kg CO2equ/kWh).

Development Alternatives Baselines for Energy efficiency and fuel switching measures for buildings Hotel Orchid & Lotus Suites, Mumbai Energy use of equipment replaced = kWh/yr Emissions Baseline = *1.0796kgCO 2 /kWh = 3959 tonnes CO 2 /yr Case Study

Development Alternatives Types of Eligible RE Projects  Solar Photovoltaics  Mini Hydro  Tidal/Wave  Wind  Geothermal  Biomass Capacity < 15 MW for small scale projects

Development Alternatives Baseline Determination for Small- scale Renewable energy projects  The RE projects could be categorised as  On-Grid  Off-grid (Replacing existing fuels such as kerosene/diesel  Thermal applications

Development Alternatives Baselines for Grid Connected RE Projects Baseline = Kwh produced by RE generating unit * Emission Coefficient for the grid (kg CO 2 equ/kWh)

Development Alternatives Emission Coefficient = average of the “approximate operating margin” and the “build margin” or Emission Coefficient = weighted average emissions (in kg CO2equ/kWh) of the current generation mix. Baselines for Grid Connected RE Projects

Development Alternatives The “approximate operating margin” is the weighted average emissions (in kg CO 2 equ/kWh) of all generating sources serving the system, excluding hydro, geothermal, wind, low-cost biomass, nuclear and solar generation; The “build margin” is the weighted average emissions (in kg CO 2 equ/kWh) of recent capacity additions to the system, defined as the lower of most recent 20% of plants built or the 5 most recent plants Baselines for Grid Connected RE Projects

Development Alternatives Case Study : Mini Hydel  Plant Details  Installed Capacity: 3 MW  Plant Load Factor : 75%  Electricity Produced (Annually): lakh units  Auxiliary Consumption: 0.5%  Transmission Losses: 2%  Energy Available for sale: lakh units

Development Alternatives  Grid Details:  Relevant Grid : Northern Grid  Grid Composition:  Thermal – 74.1%  Nuclear – 4.5%  Hydro – 21.4%  Transmission & Distribution Losses : 20%  Baseline Carbon Emissions : 0.85 kgCO2/kWh Case Study : Mini Hydel

Development Alternatives  Emission Reductions = Kwh produced by RE generating unit * Emission Coefficient (kg CO 2 equ/kWh) of the grid = *0.85 = 14943tonnes CO 2 /Yr Case Study : Mini Hydel

Development Alternatives Baselines for Off-Grid RE Projects  Emissions Baseline = Energy Baseline * Emission Coefficient of the fuel displaced

Development Alternatives  Energy Baseline can be calculated in two ways:  EB = No. of consumers * Per capita Consumption 1- Avg technical distribution losses from mini grids Or  EB = Avg Annual output Produced 1- Avg technical distribution losses from mini grids Baselines for Off-Grid RE Projects

Development Alternatives Case Study : Solar Lanterns  Project Details:  Installation of solar lanterns to replace kerosene lamps  No. of lanterns: 10,000  Wattage : 10 W  Usage : 4 hours per day

Development Alternatives  Energy Baseline = Annual Output 1- line losses = kWh/yr = 187,500 kWh/yr  Emissions Baseline = * 0.9 = kgCO2/yr Case Study : Solar Lanterns

Development Alternatives Baselines for RE Projects for thermal applications  Category includes:  Solar thermal water heaters and dryers  Solar cookers  Bio-energy for water, space heating

Development Alternatives  Those Displacing technologies using fossil fuels  Baseline = Fuel Consumption of technology used otherwise * Emission Factor of the fuel  Those displacing non-renewable sources of biomass  Baseline = Biomass Consumption * Emission Coefficient of biomass displaced  Those displacing electricity  Baseline = Electricity Consumption * Emission Factor Baselines for RE Projects for thermal applications

Development Alternatives Additionality A CDM project activity is additional if anthropogenic emissions of greenhouse gases by sources are reduced below those that would have occurred in the absence of the registered CDM project activity

Development Alternatives Barrier Analysis  Investment barrier: a financially more viable alternative to the project activity would have led to higher emissions  Examples  Other projects have higher IRRs  Other projects are less risky  Other projects have proven financial viability

Development Alternatives  Technological barrier: a less technologically advanced alternative to the project activity involves lower risks due to the performance uncertainty or low market share of the new technology adopted for the project activity and so would have led to higher emissions; Barrier Analysis

Development Alternatives  Barrier due to prevailing practice: Prevailing practice or existing regulatory or policy requirements would have led to implementation of a technology with higher emissions; Barrier Analysis

Development Alternatives  Other barriers, such as:  institutional barriers  limited information,  managerial resources,  Organizational capacity,  financial resources,  capacity to absorb new technologies, Barrier Analysis

Development Alternatives  Tools to demonstrate additionality:  A flow-chart or series of questions that lead to a narrowing of potential baseline options;  A qualitative or quantitative assessment of different potential options and an indication of why the non-project option is more likely; Barrier Analysis

Development Alternatives  A qualitative or quantitative assessment of one or more barriers facing the proposed project activity,  An indication that the project type is not common practice (e.g. occurs in less than [<x%] of similar cases) in the proposed area of implementation, and not required by legislation Barrier Analysis

Development Alternatives Case Study  Energy Efficiency in Buildings (Hotel Orchid & Lotus Suites, Mumbai)  Additionality proved through:  Lack of experience with energy efficiency investments  Low priority towards data collection  Cash Constraints  Competition for capital  Uncertain Energy Savings

Development Alternatives Case Study  Demand-side energy efficiency programmes for specific technologies (Vertical Shaft Brick Kiln)  Additionality proved through:  Investment barrier  Technological barrier  Barrier due to low penetration  Barrier due to prevailing practice

Development Alternatives Case Study  Electricity Generation for the Grid  Across RE projects, several barriers have been shown, such as  Availability of finance  Regulatory related barriers  Low IRRs  High investment costs  Technological barriers, especially in wind and solar projects

Development Alternatives Monitoring  As per Marrakech Accords, participants should include,as part of PDD, a monitoring plan providing for:  Collection & archiving of all relevant data necessary to calculate project emissions  Collection & archiving of all relevant data necessary to calculate baseline emissions  Quality assurance & control procedures for monitoring process  Procedures for periodic calculations for emission reductions

Development Alternatives Monitoring Methodologies  A monitoring plan can be based on  Previously approved methodology  New methodology  Be determined by DoE as appropriate to circumstances of proposed project activity  Reflects good monitoring practice appropriate to the type of project activity

Development Alternatives Monitoring Methodologies for Small Scale Projects Demand-side energy efficiency programmes for specific technologies  For devices replaced, number & power of replaced devices to be recorded and monitored  For devices installed, either “power” and “operating hours” or “energy use” to be recorded and monitored

Development Alternatives  Energy efficiency and fuel switching measures for industrial facilities  For retrofits, monitoring includes:  Documenting the specifications of the equipment replaced;  Metering the energy use of the industrial facility, processes or the equipment affected by the project activity;  Calculating the energy savings using the metered energy obtained above Monitoring Methodologies for Small Scale Projects

Development Alternatives  Energy efficiency and fuel switching measures for industrial facilities  For a new facility, monitoring includes  Metering the energy use of the equipment installed;  Calculating the energy savings due to the equipment installed. Monitoring Methodologies for Small Scale Projects

Development Alternatives  Energy efficiency and fuel switching measures for buildings  For retrofits, monitoring includes:  Documenting the specifications of the equipment replaced;  Metering the energy use of the building(s) before and after the replacement equipment is installed;  Calculating the energy savings due to the measures installed. Monitoring Methodologies for Small Scale Projects

Development Alternatives  Energy efficiency and fuel switching measures for buildings  For new facilities, monitoring includes:  Metering the energy use of the building(s);  Calculating the energy savings of the new building(s). Monitoring Methodologies for Small Scale Projects

Development Alternatives Case Study  Energy Efficiency in Buildings (Hotel Orchid & Lotus Suites, Mumbai) Data typeData unit Measured (m), calculated (c) or estimated (e) Recording Frequency Proportio n of data to be monitored How will the data be archived? (electronic/ paper) For how long is archived data to be kept? Electricity Consumpti on kWh/ yr MOnce in a day 100%Electronic and paper both 2 years after the end of the crediting period Number of VFDs UnitsMOnce in a day 100%Electronic and paper both 2 years after the end of the crediting period Number of CFLs, classified according to power UnitsMOnce in a day 100%Electronic and paper both 2 years after the end of the crediting period Number of electronic chokes UnitsmOnce in a day 100%Electronic and paper both 2 years after the end of the crediting period

Development Alternatives  Grid Connected RE Projects  Monitoring consists of metering the electricity generated  For co-fired plants, amount of biomass and it’s energy content is to be monitored Monitoring Methodologies for Small Scale Projects

Development Alternatives Monitoring Methodologies for Small Scale Projects  Off-grid projects  Monitoring consists of  Metering the energy produced by a sample of the systems where the simplified baseline is based on the energy produced multiplied by an emission coefficient

Development Alternatives Case Study : Solar Lanterns Data type Data variabl e Data unit Measu red (m), calcul ated (c) or estima ted (e) Recordin g frequenc y Proporti on of data to be monitore d How will the data be archived ? (electron ic/ paper) For how long is archived data to be kept? Commen t Obser- vation Whethe r solar lantern is operati ng Yes/noNot applic able Once per year 33 % of lanterns in each communi ty Electroni c and paper 2 yearsTo verify operatio n Surve y Hours used per night HoursEstima ted (e) Once per year 10 % of lanterns in each communi ty Electroni c and paper 2 yearsTo verify usage pattern

Development Alternatives Monitoring Methodologies for Small Scale Projects  For thermal applications  Monitoring consists of  Metering the energy produced by a sample of the systems where the simplified baseline is based on the energy produced multiplied by an emission coefficient. OR  Metering the thermal and electrical energy generated for co-generation projects; OR

Development Alternatives Monitoring Methodologies for Small Scale Projects  If the emissions reduction per system is less than 5 tonnes of CO 2 a year:  Recording annually the number of systems operating (evidence of continuing operation, such as on-going rental/lease payments could be a substitute); and  Estimating the annual hours of operation of an average system, if necessary using survey methods. Annual hours of operation can be estimated from total output

Development Alternatives