Gate-to-Gate Operations Update Captain Bob Hilb UPS Advanced Flight Systems April 14, 2008.

Slides:



Advertisements
Similar presentations
Using CNS/ATM to Dramatically Improve Gate-to-Gate Operations Captain Bob Hilb UPS Advanced Flight Systems October 8, 2007.
Advertisements

Airside Capacity Enhancement
Presented to: REACT Workshop By: Jay Merkle Date:25 June 2008 Federal Aviation Administration High Density Airport Time- based RNAV/RNP NextGen/JPDO Demonstrations.
Continuous Climb Operations (CCO) Saulo Da Silva
By: Steve Lang Date: September 2007 Federal Aviation Administration Wake Vortex R&D Status Briefing NBAA Convention.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
Applications from packages I to III
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
Introduction to NextGen Relevance to Taiwan 29 May 2008 The views, opinions and/or findings contained in this report are those of The MITRE Corporation,
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
Workshop on preparations for ANConf/12 − ASBU methodology
Gate-to-Gate Project: Implementing Sequencing, Merging, and Spacing Captain Bob Hilb September 11, 2006.
02/10/08 NextGen dependence on GPS! Captain Joe Burns Managing Director Flight Standards, Technology, Flight Test United Airlines.
ATN2001 Rev New Kent Fisher, Program Manager Boeing Air Traffic Management Kent Fisher, Program Manager Boeing Air Traffic Management.
1/14 Development and Evaluation of Prototype Flight Deck Systems for Distributed Air-Ground Traffic Management ASAS Thematic Network - Workshop 3 Toulouse,
© 2003 The MITRE Corporation. All Rights Reserved. Cockpit Display of Traffic Information (CDTI) Enhanced Flight Rules (CEFR) Randall Bone October 7, 2003.
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
AIR TRAFFIC CONTROL Presented by S.SUMESWAR PATRO Regd no:
Rob Eagles Director ASIA PACIFIC Safety, Operations & Infrastructure.
Study Continuous Climb Operations
1 Carl B. Jezierski Manager, Airborne Technologies Group Ralph J. Yost Project Lead, Airborne Networks FAA William J. Hughes Technical Center SAE Aerospace.
20 In-Trail Climb experience and an airlines view of ASAS opportunities Captain Rocky Stone United Airlines Manager – Flight Systems Technology.
The SESAR Target Concept of Operations ASAS Related Aspects
1 September 28th, 2005 NASA ASAS R&D A IRSPACE S YSTEMS P ROGRAM Michael H. Durham Kenneth M. Jones Thomas J. Graff.
NTAS NextGen Videos  Satellite Based navigation  ADS-B ◦ In / Out  Performance Based Navigation ◦ RNP/RNAV  TBO  Data Link Communications.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
Slide 1 July 2004 – FALBALA/WP5/FOR3/D – CENA, DFS, EEC, NATS, Sofréavia & UoG WP2 Current situation analysis – Aircraft perspective Philippe Louyot (CENA)
ADVANCED AVIATION TECHNOLOGIES RELATED TO AVIATION CAPACITY IMPROVEMENTS Prepared for: MTC Prepared By: Don Crisp ATAC February 23, 2007.
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
NextGen Current System Primary Radar – Creates blip on Radar Screen Secondary Radar – Aircraft encodes identifier and telemetry data VHF Radio – Voice.
Presented to: NAS-Wide Simulation Workshop By: Kimberly Noonan, FAA NextGen and Ops Planning Date: January 28, 2010 Federal Aviation Administration NextGen.
By: Date: Federal Aviation Administration Surveillance and Broadcast Services November 12, 2008 Merging and Spacing Enabling Continuous Descent Arrivals.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Shaping Boeing Surveillance Strategy Drivers & Obstacles ASAS Thematic Network II.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
4 th Workshop, Amsterdam, 23 rd -25 th April 2007 NUP II+…results from different areas… …not only CPDLC and S&M Presented by Fredrik Lindblom, LFV
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
EUROCONTROL European Organisation for the Safety of Air Navigation.
What Is Multilateration Triangulation System Uses Aircraft Transponder Multiple Ground Receivers Central Computer Calculates & Displays Aircraft Position.
Lecture 9: Ecological Factors & Aircraft Performance AIRCRAFT WEIGHT & PERFORMANCE.
Slide 1 July 2004 – FALBALA/WP5/FOR4/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Mark Watson & Richard Pugh ( NATS) CARE / ASAS Action FALBALA Project Dissemination.
Airbus Status on ADS-B In / Out Update
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
ASAS TN2 Briefing Cyro Stone 15 April 2008.
DIRECTION TECHNIQUE CERTIFICATION Paris, April 2008 SL ASAS TN2 Workshop ppt ASAS & Business.
2004 Friends/Partners in Aviation Weather Forum 1 Progress in Weather Information Management and Dissemination 2004 Friends/Partners in Aviation Weather.
1 Panel on New Air Traffic Control and Management Technology February 23, 2007 Regional Airport Planning Committee Panel on New Air Traffic Control and.
© 2015 Noblis, Inc. Jonathan Hammer Modeling for Verification and Validation Workshop, FAA WJHTC Monte Carlo Modeling Techniques in FAA Systems Development.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
Tom G. Reynolds Sponsor: Gary Pokodner, FAA Weather Technology in the Cockpit (WTIC) Wind Needs for NextGen Applications Air Traffic Control Systems Group.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
NY/NJ/PHL Metropolitan Area Airspace Redesign Record of Decision (ROD) Announcement Congressional Briefing Name: Steve Kelley Date: September 5, 2007 Federal.
ASAS TN Third Workshop, April 2004, Toulouse Session 1 Use of the System by pilots and controllers Tony Henley.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
Workshop on preparations for ANConf/12 − ASBU methodology
Friends and Partners of Aviation Weather
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Karim Zeghal EUROCONTROL Experimental Centre
FPAW 2016 Summer Meeting 3 August 2016 Louis Bailey.
Workshop on preparations for ANConf/12 − ASBU methodology
FAA and JPDO ASAS Activities
Presentation transcript:

Gate-to-Gate Operations Update Captain Bob Hilb UPS Advanced Flight Systems April 14, 2008

2 Agenda Background Gate-to-Gate Scheduling and Control Merging and Spacing Cockpit Display of Traffic Information Assisted Visual Separation Surface Area Movement Management Benefits

3 Implementation Concept Gate-to-Gate surveillance, RTA/Flight Deck Merging and Spacing (FDMS), NextGen CDA RNAV/RNP procedures, and Datalink –Enable building and controlling of a total schedule Systems approach needed –Optimize to the total system, not sub-optimization of each individual capability FDMS can deliver aircraft to the runway, the critical point of the schedule, within a few seconds –Time based wake turbulence separation can enable all weather capacity consistency –Runway stagger technique to further optimize runway usage –Can be done with minimal FMS and ATC automation changes

4 Louisville Technology Demonstration Previous –Surface Management System (SMS) –Successful test of Continuous Descent Arrivals (CDAs) –ADS-B Cockpit Display of Traffic Information (CDTI) on 107 B-757 and B-767 aircraft – ADS-B “Out” on other aircraft Now –Airline Based En-route Sequencing and Spacing (ABESS) –Five B-757 with ACSS SafeRoute - FDMS, CDTI Assisted Visual Separation (CAVS) and Surface Area Movement Management (SAMM) –B-767 Certification and Ops Approval imminent

5 SMS – Airport View

6 Continuous Descent Arrivals Arrival procedure (RNAV/RNP) for idle power descent from cruise to final approach –saves fuel, lowers noise, lowers emissions FAA Center of Excellence for Noise & Emissions sponsored successful trials Oct at SDF

7 Trial Results Continuous Descent Arrivals – October 2004 Trials –30% reduction in noise (up to 6 dB) –34% reduction in nitrous oxide (NOx) emissions –Below 3000 feet –250 to 465 pounds less fuel burn per flight Reduced Noise Impact CDA (Sept ) ) Baseline (Sep 28-Oct 2)

8 Trial Results Identified the need for a closed loop spacing system for high traffic density NextGen CDAs Needs affordable retrofit to make the concept feasible –Bundled applications in an Electronic Flight Bag –Merging and Spacing –Surface Area Movement Management –ATC datalink and others –Surveillance Processor alternative to FMS upgrade –FDMS with RTA

9 ABESS Based on earlier MITRE and NASA work Uses all available surveillance sources to predict aircraft sequence and build schedule for arrival fix (at all runway ends – future) –FAA radars, ACARS, ADS-B, and Rapid Update Cycle (RUC) winds (SMS for all nearby airports - future) Detects conflicts Calculates speed changes and RTA to smooth flow Uplinks speed to aircraft and M&S info (RTA future) Joint FAA, NASA, MITRE, UPS project

10 Scheduling Process Utilize fused surveillance (with ADS-B accuracies) and SMS to allow scheduling of aircraft inbound to a hub –All aircraft within defined time horizon (1-2 hours?) –All airborne and pre-departure traffic –SMS predicts when aircraft at close-in airports will be ready for take-off –Schedule built to maximum capacity for each runway with slots for pre-departure aircraft –Move slots as required

11 Controlling the Schedule Airborne aircraft are initially given speeds (RTA – future) via datalink to achieve strategic schedule –Datalink - initially ACARS, ultimately ATC datalink –Scheduler - initially ABESS, ultimately in terminal traffic manager Pre-departure aircraft are given take-off times to make their slots –Similar to today’s controlled take-off time process –Slots are easily moved to accommodate unexpected ground delays Within ADS-B range, aircraft are assigned the aircraft to follow and spacing interval via datalink Aircraft use FDMS to the runway

12 Currently in Revenue Service VMC or IMC Merging and Spacing NextGen Constant Descent Arrival (CDA) CDTI Assisted Visual Separation (CAVS) / CEFR Approach

13 Merging and Spacing – Now Redesigned RNAV/RNP arrivals that utilize CDA principles AOC strategic scheduling and spacing at Louisville –Airline Operations Center (AOC) utilizes ABESS to provide speed, spacing, and aircraft-to-follow assignments to flight crew ATC responsibilities unchanged –Responsible for separation –Intervenes, if necessary, to maintain arrival flow –Maintains awareness of AOC and flight deck spacing operations

14 VMC Capacity in IMC Conditions CDTI Assisted Visual Separation (CAVS) –Provides the ability to maintain “Visual Approach” arrival rates in conditions that currently require Instrument Approaches –Advanced ATSA-VSA –Initially allows loss of out the window visual during Visual Approaches –Ultimately penetrate cloud layer in basic VMC Next Steps Relieve controller of wake turbulence separation responsibility –With extremely consistent delivery of aircraft at runway using FDMS Use FDMS for runway stagger

15 SAMM

16 Surface Area Movement Management (SAMM) Airport surface map and traffic displayed on the EFB provides surface situational awareness –Tracks the movements of own aircraft and other ground and airborne traffic in the terminal area using ADS-B –ASDE-X based Traffic Information Service-Broadcast (TIS-B) (next year) –Alerts crews of potential conflicts with traffic (next year) –Alerts crews if incursion is imminent (next year) Commercial Aviation Safety Team (CAST) determined moving map with traffic over 95% effective –All other strategies less than 50% effective

17 Current Results Five 757s equipped with SafeRoute –1-2 nights weekly, 2-4 aircraft per night –Limitations - crew training, aircraft availability –FDMS has worked as advertised –No problems with SAMM, about 75 airports in database –CAVS working as advertised, concerns on call sign usage but not needed for CAVS –Should activate a 757 in Europe shortly Expect 767 cert and ops approval shortly –Will activate s immediately thereafter

18 Runway Stagger During simultaneous dependant approaches controllers raised concerns over spacing Ability to use FDMS to space off of the aircraft on the parallel runway would greatly enhance capacity in many airports It could also allow many airports to make more runways mixed use with even further capacity gains Can take advantage of previous Paired Approach application work with runway separations down to 700 feet  2500 ft or less   1.5 mi diagonal Normal spacing 1.5 mi diagonal

19 Merging and Spacing Operations Flight deck-based spacing function –Uses CDTI and Speed Guidance –After flying NextGen CDA, CAVS approach can be flown Worldwide implementation –ATC utilizes scheduling tool for all participants –Aircraft flying NextGen CDA require M&S functions –Runways can be designated for M&S operations in a mixed equipment environment for early implementation

20 UPS Aircraft Architecture ACSS Surveillance (TCAS) 3000 ACSS Transponder upgrade - DO-260A Boeing Class III EFB (possibility of using Class II/III or 2 Class II EFBs) –ADS-B Applications –CPDLC (future) –Surface Moving Map –AOC Applications Simple speed guidance display

21 Benefits UPS Louisville –Significant fuel, distance, and time reductions measured but with limited data –Should have public results soon Airspace System –First major step towards aviation modernization –Affordable retro-fit, ability to standardize across all fleet types allows near term implementation –Provides guidance for new aircraft implementation –Bundled applications within in one system create layered, cumulative benefits with good ROI –Accelerates EUROCONTROL, FAA, and JPDO plans