Tony Doyle Overview of UK Development and Deployment Programme, LCG PEB Meeting, CERN, 16 September 2003.

Slides:



Advertisements
Similar presentations
London Tier2 Status O.van der Aa. Slide 2 LT 2 21/03/2007 London Tier2 Status Current Resource Status 7 GOC Sites using sge, pbs, pbspro –UCL: Central,
Advertisements

Slide 1 Steve Lloyd Grid Brokering Meeting - 4 Dec 2006 GridPP Steve Lloyd Queen Mary, University of London Grid Brokering Meeting December 2006.
S.L.LloydATSE e-Science Visit April 2004Slide 1 GridPP – A UK Computing Grid for Particle Physics GridPP 19 UK Universities, CCLRC (RAL & Daresbury) and.
Tony Doyle GridPP – From Prototype To Production, HEPiX Meeting, Edinburgh, 25 May 2004.
UK Testbed Report GridPP 9 Steve Traylen
GridPP July 2003Stefan StonjekSlide 1 SAM middleware components Stefan Stonjek University of Oxford 7 th GridPP Meeting 02 nd July 2003 Oxford.
Tony Doyle GridPP2 Proposal and Responses to Questions, Grid Steering Committee, Coseners, 28 July 2003.
S.L.LloydGrid Steering Committee 8 March 2002 Slide 1 Status of GridPP Overview Financial Summary Recruitment Status EU DataGrid UK Grid Status GridPP.
GridPP9 – 5 February 2004 – Data Management DataGrid is a project funded by the European Union GridPP is funded by PPARC GridPP2: Data and Storage Management.
Tony Doyle - University of Glasgow GridPP EDG - UK Contributions Architecture Testbed-1 Network Monitoring Certificates & Security Storage Element R-GMA.
John Gordon eScience Centre UK Deployment of LCG1 John Gordon CCLRC Escience Centre GridPP7, Oxford, July 2003.
LCG WLCG Operations John Gordon, CCLRC GridPP18 Glasgow 21 March 2007.
Tony Doyle GridPP2 – Project Specification, GridPP9 Collaboration Meeting, Edinburgh, 4 February 2004.
Tony Doyle Executive Summary, PPARC, MRC London, 15 May 2003.
John Gordon CCLRC eScience centre Grid Support and Operations John Gordon CCLRC GridPP9 - Edinburgh.
Your university or experiment logo here What is it? What is it for? The Grid.
Partner Logo Tier1/A and Tier2 in GridPP2 John Gordon GridPP6 31 January 2003.
Tony Doyle GridPP2 Specification Process Grid Steering Committee Meeting, MRC, London, 18 February 2004.
Partner Logo UK GridPP Testbed Rollout John Gordon GridPP 3rd Collaboration Meeting Cambridge 15th February 2002.
S.L.LloydGridPP Collaboration Meeting IC Sept 2002Slide 1 Introduction Welcome to the 5 th GridPP Collaboration Meeting Steve Lloyd, Chair of GridPP.
David Britton, 28/7/03 Imperial, College GridPP1 Overview David Britton, 28/7/2003 Imperial College.
1Oxford eSc – 1 st July03 GridPP2: Application Requirement & Developments Nick Brook University of Bristol ALICE Hardware Projections Applications Programme.
Slide 1 of 24 Steve Lloyd NW Grid Seminar - 11 May 2006 GridPP and the Grid for Particle Physics Steve Lloyd Queen Mary, University of London NW Grid Seminar.
UK Agency for the support of: High Energy Physics - the nature of matter and mass Particle Astrophysics - laws from natural phenomena Astronomy - the.
GridPP Presentation to PPARC Grid Steering Committee 26 July 2001 Steve Lloyd Tony Doyle John Gordon.
Tony Doyle GridPP2 Proposal, BT Meeting, Imperial, 23 July 2003.
The National Grid Service Mike Mineter.
Dave Kant Grid Monitoring and Accounting Dave Kant CCLRC e-Science Centre, UK HEPiX at Brookhaven 18 th – 22 nd Oct GOSC Oct 28.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Torsten Antoni – LCG Operations Workshop, CERN 02-04/11/04 Global Grid User Support - GGUS -
GridPP From Prototype to Production David Britton 21/Sep/06 1.Context – Introduction to GridPP 2.Performance of the GridPP/EGEE/wLCG Grid 3.Some Successes.
Presenter Name Facility Name EDG Testbed Status Moving to Testbed Two.
15 May 2006Collaboration Board GridPP3 Planning Executive Summary Steve Lloyd.
Tony Doyle - University of Glasgow PPARC Review Timeline 0. PPARC Call (February 2003) 1.GridPP2 Proposal (30/5/03) 2. Feedback from Reviewers 3. Responses.
LHCb Computing Activities in UK Current activities UK GRID activities RICH s/w activities.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Nick Brook University of Bristol The LHC Experiments & Lattice EB News Brief overview of the expts  ATLAS  CMS  LHCb  Lattice.
EGEE statement EU and EU member states major investment in Grid Technology Several good prototype results Next Step: –Leverage current and planned national.
2 GridPP2 Budget David Britton, 4/12/03 Imperial College.
Enabling e-Research over GridPP Dan Tovey University of Sheffield.
Tony Doyle “GridPP2 Proposal”, GridPP7 Collab. Meeting, Oxford, 1 July 2003.
S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
Southgrid Status Report Pete Gronbech: February 2005 GridPP 12 - Brunel.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
Quarterly report SouthernTier-2 Quarter P.D. Gronbech.
Tony Doyle “GridPP – Year 2 to Year 3”, Collaboration Meeting, Bristol, 22 September 2003.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Tony Doyle GridPP – From Prototype To Production, GridPP10 Meeting, CERN, 2 June 2004.
12th November 2003LHCb Software Week1 UK Computing Glenn Patrick Rutherford Appleton Laboratory.
1 st EGEE Conference – April UK and Ireland Partner Dave Kant Deputy ROC Manager.
John Gordon CCLRC e-Science Centre LCG Deployment in the UK John Gordon GridPP10.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
GridPP Deployment & Operations GridPP has built a Computing Grid of more than 5,000 CPUs, with equipment based at many of the particle physics centres.
Tony Doyle - University of GlasgowOutline EDG LCG GSC UK Core Grid GridPP2 EGEE Where do we go from here? Operations.
GridPP Presentation to AstroGrid 13 December 2001 Steve Lloyd Queen Mary University of London.
GridPP Building a UK Computing Grid for Particle Physics Professor Steve Lloyd, Queen Mary, University of London Chair of the GridPP Collaboration Board.
London Tier 2 Status Report GridPP 11, Liverpool, 15 September 2004 Ben Waugh on behalf of Owen Maroney.
Tony Doyle - University of Glasgow 8 July 2005Collaboration Board Meeting GridPP Report Tony Doyle.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
Presenter Name Facility Name UK Testbed Status and EDG Testbed Two. Steve Traylen GridPP 7, Oxford.
2-Sep-02Steve Traylen, RAL WP6 Test Bed Report1 RAL and UK WP6 Test Bed Report Steve Traylen, WP6
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
J Jensen/J Gordon RAL Storage Storage at RAL Service Challenge Meeting 27 Jan 2005.
Slide § David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP delivering The UK Grid.
18/12/03PPD Christmas Lectures 2003 Grid in the Department A Guide for the Uninvolved PPD Computing Group Christmas Lecture 2003 Chris Brew.
Regional Operations Centres Core infrastructure Centres
UK GridPP Tier-1/A Centre at CLRC
UK Testbed Status Testbed 0 GridPP project Experiments’ tests started
Collaboration Board Meeting
Presentation transcript:

Tony Doyle Overview of UK Development and Deployment Programme, LCG PEB Meeting, CERN, 16 September 2003

Tony Doyle - University of GlasgowOutline Management The Project Map GridPP Status UK Grid Users Deployment – LCG and UK perspective Current Resources EDG 2.0/LCG 1.0 Deployment Status Accounting Todays Operations Future Operation Planning Middleware Status Middleware Evolution GridPP2 Planning Status

Tony Doyle - University of Glasgow Institutes GridPP GridPP in Context Core e-Science Programme GridPP CERN LCG Tier-1/A Middleware Experiments Tier-2 Grid Support Centre EGEE Not to scale! Apps Dev Apps Int

Tony Doyle - University of Glasgow GridPP Management CB (20 members) meets half-yearly to provide Institute overview PMB (12 members) meets weekly [via VC] to provide management of project TB (10 members) meet as required in response to technical needs and regularly via phone EB (14 members) meet quarterly to provide experiments input

Tony Doyle - University of Glasgow GridPP Project Overview

Tony Doyle - University of Glasgow Financial Breakdown Five components –Tier-1/A = Hardware + 10 CLRC e-Science Staff –DataGrid = 25 DataGrid Posts inc. CLRC PPD Staff –Applications = 17 Experiments Posts (to interface middleware) –Operations = Travel (~100 people)+ Management + Early Investment –CERN = 25 LCG posts + Tier-0 + LTA

Tony Doyle - University of Glasgow Quarterly Reporting Quarterly reporting allows comparison of delivered effort with expected effort Feedback loop as issues arise

Tony Doyle - University of Glasgow Funded Effort Breakdown (Snapshot 2003Q3) LCG effort is largest single area of GridPP Future project priorities focussed on LCG and EGEE

Tony Doyle - University of Glasgow GridPP Status: The Project Map

Tony Doyle - University of Glasgow GridPP Status: Summary GridPP1 has now completed 2 ex 3 years All metrics are currently satisfied 103 of 182 tasks are complete 70 tasks not yet complete or overdue 9 tasks are overdue: –6 are associated with LCG 2 of these are trivial (definition of future milestones) 4 of these are related to the delay in LCG-1 –2 are associated with applications (CMS and D0) –1 is associated with the UK infrastructure (test of a heterogeneous testbed)

Tony Doyle - University of Glasgow Risk Register (Status April 03) Scaling up to a production system (LCG-1 deployment) System management effort at UK Tier-2 sites (being addressed as part of GridPP2)

Tony Doyle - University of Glasgow UK Certificates and VO membership 1.UK e-Science CA now used in production EDG testbed 2.PP users engaged from many institutes 3.UK participating in 6 ex 9 EDG VOs

Tony Doyle - University of Glasgow UK Deployment Overview Significant resources within EDG. Currently being upgraded to EDG2. Integrating EDG on farms has been repeated many times but it is difficult. Sites are keen to take part within EDG2 currently, with LCG1 deployment after this. By the end of the year many HEP farms plan to be contributing to LCG1 resources. Basis of Deployment Input to LCG Plan. Input from Tier-1 (~50%) initially and four distributed Tier-2s (50%) on ~Q timescale. CPU (kSI2K) Disk TB Support FTE Tape TB CERN Czech Repub France Germany Holland Italy Japan Poland Russia Taiwan Spain Sweden Switzerland UK USA Total

Tony Doyle - University of Glasgow RAL CE SE LCG 1.0/EDG 2.0 5xWN LCG Testbed CE LCG 1.0/EDG xWN Tier1/a CE SE EDG 2.0 WP3 Testbed MON CE SE EDG 2.0 1xWN EDG Dev Testbed MON SE ADS UI within CSF. NM for EDG2. Top level MDS for EDG. Various WP3 and WP5 dev nodes. VOMS for DEV TB. SE LCG0 Testbed CE 1xWN

Tony Doyle - University of Glasgow London Grid: Imperial College CE SE EDG 2.0 EDG Testbed WNs CE EDG 2.0 WNs BaBar Farm CE SE CMS-LCG0 WN CE SE EDG 2.0 1xWN WP3 Testbed MON RB for EDG 2.0. Plan to be in LCG1 and other testbeds.

Tony Doyle - University of Glasgow London Grid: Queen Mary and UCL CE SE EDG 1.4 1xWN EDG Testbed 32xWN Queen Mary CE also feeds EDG jobs to 32 node e-Science farm. Plan to have LCG1/EDG2 running for the end of the year. Expansion with SRIF grants.(64WN+2TB in Jan 2004, 100WN + 8TB in Dec 2004.) CE SE EDG 1.4 1xWN EDG Testbed UCL Network Monitors for WP7 development. SRIF bid in place for 200 CPUs for the end of the year to join LCG1.

Tony Doyle - University of Glasgow Southern Grid: Bristol CE SE EDG 2.0 1xWN EDG Testbed CE SE EDG 2.0 1xWN WP3 Testbed MON CE SE CMS-LCG0 CMS/LHCb Farm 24xWN CE SE EDG 1.4 BaBar Farm 78xWN GridPP RC. Plan to join LCG1

Tony Doyle - University of Glasgow Southern Grid: Cambridge and Oxford CE SE EDG xWN EDG Testbed Cambridge farm shared with local NA-48, GANGA users. Some RH73 WNs for ongoing ATLAS challenge. 3TB GridFTP-SE. Plan to join LCG1/EDG2 later in the year with an extra 50 CPUs. EDG jobs will be fed into local e-Science farm. CE SE EDG 1.4 2xWN EDG Testbed Oxford: Plan to join EDG2/LCG1. Nagios monitoring has been set up. (RAL is also evaluating Nagios) Planning to send EDG jobs into 10 WN CDF farm. 128 node cluster being ordered now.

Tony Doyle - University of Glasgow Southern Grid: RAL PPD and Birmingham CE SE EDG 2.0 9xWN EDG Testbed CE SE EDG 2.0 1xWN WP3 Testbed MON PPD User Interface Part of Southern Tier2 Centre within LCG1. 50 CPUs and 5TB of disk expected for the end of year. CE SE EDG 1.4 1xWN EDG Testbed Birmingham: Expansion to 60 CPUs and 4TBs. Expect to participate within LCG1/EDG2

Tony Doyle - University of Glasgow NorthGrid: Manchester and Liverpool CE SE(1.5TB) EDG xWN CE SE(5TB) EDG xWN CE SE EDG 1.4 9xWN EDG Testbed BaBar Farm DZero Farm GridPP and BaBar VO Servers. User Interface Plan that DZero farm will join LCG. SRIF bid in place for significant HEP resources. CE SE EDG 1.4 1xWN EDG Testbed Liverpool plan to follow EDG 2, possibly integrating newly installed Dell (funded by NW Development Agency) and BaBar farm. Largest single Tier-2 resource.

Tony Doyle - University of Glasgow ScotGrid: Glasgow, Edinburgh and Durham CE SE EDG 1.4 ScotGRID 59xWN WNs on a private network with outbound NAT in place. Various WP2 development boxes. 34 dual blade servers just arrived. 5TB FastT500 expected soon. Shared resources (CDF and Bioinformatics) CE SE EDG 2.0 WP3 Testbed MON Edinburgh: 24TB FastT700 and 8-way server just arrived. Durham: existing farm available. Plan to be part of LCG. CDF LHC BIO

Tony Doyle - University of Glasgow EDG 2.0 Deployment Status 12/9/03 RAL (Tier1A): Up and running with UI gppui04 available (as part of CSF) and offer to give access to LCFGng node to help people compare with their own LCFGng setup. IC: Existing WP3 testbed site is at Standard 2.0 RB available UCL: Trying to go to 2.0: SE up so far. QMUL: 2.0 installation ongoing. RAL (PPD): site up and running. Oxford: wait until October for 2.0. Birmingham: Working on getting a 2.0 site up next week Bristol: WP3 testbed site at Also doing a new 2.0 site install. UI and MON up, still doing CE, SE and WN. Cambridge to follow. Manchester: Trying to get set up. Glasgow: Concentrating on commissioning new hardware during the next month. Wait until then before going to 2.0. Edinburgh to follow.

Tony Doyle - University of Glasgow Meeting Current LHC Requirements: Experiment Accounting Experiment- driven project. Priorities determined by Experiments Board.

Tony Doyle - University of Glasgow Tier-1/A Accounting LHCb ATLAS CMS Monthly accounting: Online Ganglia-based monitoring, see: Last month: CMS (and BaBar) jobs. Annual accounting: ATLAS, CMS and LHCb jobs. Generally dominated by BaBar since January.

Tony Doyle - University of Glasgow Todays Operations 1.Support Team built from sysadmins. 4 funded by GridPP to work on EDG WP6, the rest are site sysadmins. 2.Methods list, phone meetings, personal visits, job submission monitoring RB, VO, RC for UK use to support non-EDG use 3.Rollout Experience from RAL in EDG dev testbeds and IC and Bristol in CMS testbeds 10 sites have been part of EDG app testbed at one time

Tony Doyle - University of Glasgow GridPP2 Operations To move from testbed to production, GridPP plans a bigger team with a full-time Operations Manager Manpower will be from the Tier-1 and Tier-2 Centres who will contribute to the Production Team The team will run a UK Grid which will belong to various grids (EDG, LCG,..) and also support other experiments RAL is also leading the LCG Security Group –written 4 documents setting out procedures and User Rules –working with GOC task force on Security Policy –Risk Analysis and further planning for LCG in 2004

Tony Doyle - University of Glasgow LCG Operations RAL has led project to develop an Operations Centre for LCG1 –Applied GridPP and MapCenter monitoring to LCG1 –Dashboard combining several types of monitoring –Set up a web site with contact information –Developing Security Plan –Accounting (the current priority, building upon resource centre and experiment accounting)

Tony Doyle - University of Glasgow

EGEE Tier1 (16.5 FTE) UK Team (8 FTE) UK GSC (2 FTE) (2FTE) EGEE ROC (5 FTE) EGEE CIC (4.5 FTE) The UK Production Team will be expanded as part of EGEE ROC and CIC posts to meet EGEE requirements To deliver an EGEE grid infrastructure that must also deliver to other communities and projects Could do this just within PP (matching funding available) but also want to engage fully with UK Core programme

Tony Doyle - University of Glasgow Tier-1/A Services [FTE] High quality data services National and International Role UK Focus for International Grid development Highest single priority within GridPP2 Regained Programme CPU 2.0 Disk 1.5 AFS 0.0 Tape 2.5 Core Services 2.0 Operations 2.5 Networking 0.5 Security 0.0 Deployment 2.0 Experiments 2.0 Management 1.5 Total 16.5

Tony Doyle - University of Glasgow Tier-2 Services [FTE] Four Regional Tier-2 Centres London: Brunel, Imperial College, QMUL, RHUL, UCL. SouthGrid: Birmingham, Bristol, Cambridge, Oxford, RAL PPD. NorthGrid: CLRC Daresbury, Lancaster, Liverpool, Manchester, Sheffield. ScotGrid: Durham, Edinburgh, Glasgow. Hardware provided by Institutes GridPP provides added manpower Current Planning Y 1Y 2Y 3 Hardware Support Core Services4.0 User Support Specialist Services Security1.0 Resource Broker1.0 Network0.5 Data Management2.0 VO Management Existing Staff-4.0 GridPP Total SY 40.0

Tony Doyle - University of Glasgow Operational Roles Core Infrastructure Services (CIC) –Grid information services –Monitoring services –Resource brokering –Allocation and scheduling services –Replica data catalogues –Authorisation services –Accounting services Still to be defined fully in EGEE Core Operational Tasks (ROC) –Monitor infrastructure, components and services –Troubleshooting –Verification of new sites joining Grid –Acceptance tests of new middleware releases –Verify suppliers are meeting SLA –Performance tuning and optimisation –Publishing use figures and accounts

Tony Doyle - University of Glasgow SRB for CMS UK eScience has been interested in SRB for several years. CCLRC has gained expertise for other projects and is collaborating with SDSC Now hosting MCAT for worldwide CMS pre-DC04 Interfaced to RAL Datastore –Service Started 1 July ,000 files registered 10 TB of data stored in system Used across 13 sites worldwide including CERN and Fermilab 30 Storage resources managed across the sites MCAT Database MCAT Server SRB A Server SRB B Server SRB Client a b cd e f g

Tony Doyle - University of Glasgow EDG StorageElement Not initially adopted by LCG1 Since then limited SRM functionality has been added to support GFAL –available for test by LCG Full SRMv1 functionality has been developed and is currently being integrated on internal testbed GACLs being integrated

Tony Doyle - University of Glasgow RGMA - Status Running on WP3, EDG-development and EDG-application testbeds Application Deployment: 29 CEs, 11 SEs, 10 sites in 6 countries –RGMA browser access in < 1sec Monitoring scripts being run on the testbeds and results linked from the WP3 web page – Registry replication is being tested on WP3 testbed –Better performance & higher reliability required Authentication successfully tested on WP3 testbed Two known bugs remain –Excessive threads requiring GOUT machine restart New code has been developed with extensive unit tests. Now being tested on WP3 testbed This new code will support at least 90 sites –Latest Producer choosing algorithm failing to reject bad LPs – shows up intermittent absence of information Revised algorithm needs coding (localised change)

Tony Doyle - University of Glasgow RGMA - Users Users and Interfaces to other systems: –Resource Broker –CMS (Boss) –Service and Service Status for all EDG services –Network Monitoring & Network Cost Function –MapCenter –Logging & Bookkeeping –UK e-Science, CrossGrid and BaBar evaluating –Replica Manager –MDS (GIN/GOUT) –Nagios –Ganglia (Ranglia) Future: RB direct use of RGMA (no GOUT) –Better performance and reliability

Tony Doyle - University of Glasgow Middleware, Security and Network Service Evolution Information Services [5+5 FTE] and Networking [ FTE]: strategic roles within EGEE Security expands to meet reqts. Data and Workload Management continue No further configuration management development programme defined by –mission criticality (experiment requirements driven) –International/UK-wide lead –leverage of EGEE, UK core and LCG developments ActivityCurrent Planning Security3.5 Info-Mon.4.0 Data & Storage4.0 Workload1.5 Networking3.0 TOTAL16.0 Security Middleware Networking

Tony Doyle - University of Glasgow GridPP2 Proposal ~30 page proposal + figures/tables + 11 planning documents: 15.Tier-0 16.Tier-1 17.Tier-2 18.The Network Sector 19.Middleware 20.Applications 21.Hardware Requirements 22.Management 23.Travel 24.Dissemination 25.From Testbed to Production

Tony Doyle - University of Glasgow Current planning based upon £19.6m Funding Scenario PPPARC Review Timeline: Projects Peer Review Panel (14-15/7/03) Grid Steering Committee (28-29/7/03) Science Committee (October 03)

Tony Doyle - University of GlasgowTimeline

GridPP2 Project Map Need to build this in: to identify progress…

Tony Doyle - University of Glasgow Experiment Requirements: UK only Total Requirement:

Tony Doyle - University of Glasgow Meeting the Experiments Hardware Requirements Significant… Production Grid inc. Tier-2 resources needed…

Tony Doyle - University of Glasgow Projected Hardware Resources Total Resources: (note x2 scale change)

Tony Doyle - University of Glasgow Application Interfaces - Service Evolution Applications –18 FTEs: ongoing programme of work can continue –Difficult to involve experiment activity not already engaged within GridPP Project would need to build on cross-experiment collaboration – GridPP1 already has experience –GANGA: ATLAS & LHCb –SAM: CDF & D0 –Persistency: CMS & BaBar Encourage new joint developments across experiments

Tony Doyle - University of GlasgowConclusions Management under control via the Project Map and Project Plan GridPP Status is defined in terms of high level tasks and metrics: under control Major component is LCG –We contribute significantly to LCG and our success depends critically on LCG Deployment – high and low level perspectives merge via accounting Resource centre and experiment accounting are both important Comprehensive accounting is a priority, built up from existing systems Todays operations in the UK are built around a small team Future operations planning expands this team significantly: Production Manager being appointed Middleware deployment focussing on Information Service performance issues Existing IS team will be reinforced in UK within EGEE Security (deployment and policy) is emphasised GridPP2 planning status: formal feedback in November