MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.

Slides:



Advertisements
Similar presentations
Multidisciplinary Senior Design Rochester Institute of Technology Dresser-Rand Painted Post P10459 MSD II Update Presentation 4/9/10 Team: Phil Eaton (ME)
Advertisements

CHAPTER 1 SOFTWARE DEVELOPMENT. 2 Goals of software development Aspects of software quality Development life cycle models Basic concepts of algorithm.
Composite Filament Winding Machine: P09226 Shijo George Christofer Brayton Alex Sandy Tiago Santos Daniel Weimann Project Manager Electrical Engineer Chief.
Filament Winding Machine. Project Name – Filament Winding Machine Project Number – P09226 Project Family – Competitive FSAE Autosports Systems Project.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
FRIDAY, DECEMBER 18, 2009 RYAN MILLER – ME, PROJECT MANAGER CHRIS OXLEY – EE, LEAD ENGINEER RYAN ENYEART – ME, SYSTEM ENGINEER ALEX MANLEY – EE, SYSTEM.
Project Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T MSD I Project Review Objectives of the Project Review Proposed Review Structure.
LFTB Proprietary Information 1 Fuser test bed ™ R I T MSD1 Project Review February 22, 2007 Fuser Test Bed P07501 IE TEAM Justin McMillan – Project Lead.
P09451 Mid-Project Review Bryan McCormick (ME) Project Manager Andy Freedman (ME) Heat Transfer/Fluids Analysis & Design John Kreuder (ME) Thermal Modeler.
Introduction to Software Engineering Dr. Basem Alkazemi
RIT Senior Design I, Project Review P07310: Electronic Shifted Manual Transmission George Slack Team Guide Jason BotterillTeam Leader, Mechanical Engineer.
P08456-LED Lighting for an Underwater ROV Jeremy Schiele-Project Manager Jonathan Lent-Mechanical Engineer Ryan Seeber-Computer Engineer Justin VanSlyke-Mechanical.
EDGE™ MAV Control System - P Management Review (MSD I) Erik Bellandi – Project Manager Ben Wager – Lead Engineer Garrett Argenna – Mechanical Engineering.
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
MSD Project P10236: Versatile Adaptive Controller Project Introduction P10236 Introduction.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
EDGE™ Project Status Update P09141 – Satellite Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
EDGE™ Project Overview P09503 – Electrophotographic Development and Transfer Station David Schwartz – ISE (Team Lead) Ruth Gay – ME Phillip Lopez – ME.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Team 10 Air Conditioning Experiment Members –Sean Gallagher –Pamela McDowell –Brian Davison –Prathana Vanarath Sponsors –Dr. Wexler –Dr. Advani Advisor.
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Team 10 ME Project: Air Conditioner Lab Members Customer Advisor Sean M. Gallagher, Brian Davison U of D ME Department Dr. Keefe Prathana Vannarath, Pam.
The objective of this project was to design a dynamic similarity test rig to replicate the operating conditions of the main crank bearing in the Dresser-Rand.
MSD P07302Design Review1 Motor Controller Subsystem MSD P07302 Project Sponsor: KGCOE Project Members: D. ShenoyProject Manager S. TallauSoftware Design.
MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.
Gravity Fed System Team Members: James Brinkerhoff, Christopher Kulbago, Patrick O’Connell, Lauren Pahls, Ted Rakiewicz, Sarah Salmon Group Number: P13631.
Software Engineering Management Lecture 1 The Software Process.
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
Electrical and Computer Engineering Senior Design John Peeples, Ph. D., P.E. Professor and Department Head.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
ENGI 8926: Mechanical Design Project II
P16415: Human Powered Centrifuge Amanda Johnson Nathan Corr Pieter Werner Joanna Jayawickrema Laura Pratt.
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
Team SHARP February 10,  Sponsor ◦ Dr. Will Tracz  Faculty Coach ◦ Robert Kuehl  Members ◦ Samuel Goshen ◦ Leo Torbochkin ◦ Dan Edenhofer ◦ Dominic.
P07108: METEOR Instrumentation Recovery System. Team Bash Nanayakkara – Project Manager (ISE) Scott Defisher – Fuselage Design (ME) Mike Kochanski – Software.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
P16680: AATech Universal Oil and Bag System Subsystem Design Review 10/20/15.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
Project Final Presentation Joe Featherall.
 P09454: Design and Testing of Centrifugal Pump Components Rishitha Dias Kevin Klucher P09454.
Rishitha Dias (IE): Team Manager Kevin Klucher (ME): Technical Lead John Hayles (ME): Design Engineer Reme Meck (ME): Turbomachinery Expert P09454.
What has been accomplished at the end of MSD 1 & 2?
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
“UV Tube” Water Disinfection P07402 Project Review 23 February 2007 Sponsored by Dr. Andres Carrano and Dr. Brian Thorn of the KGCOE ISE Department.
Project: P08371 Portable Command Post Rick Chadwick ME Harith Wijetungage IE Scott Pudlewski EE Sponsors: Technet Global Services DiLorenzo Electronics.
Joseph Ferrara Team Lead (ME) Joseph ChurchDesign Engineer (ME) Joshua Van Hook LabView Engineer (EE) Jamie Jackson Electronics (EE) Joelle Kirsch Project.
Midpoint Project Review P10454 VAD Test Loop
Software Engineering Management
P07307: Controls for Dynamic Suspension
Dr. Marcos Esterman Faculty Guide W. Casolara Project Leader
Turbomachinery Flow Visualization P08453
P07203 Dynamometry Laboratory Infrastructure
Concept Level Project Plan P08008 – ArcWorks Process Improvement
Concept Level Project Plan P08453 – Turbomachinery Flow Visualization
AUTOMATIC SHIFT CONTROLS FOR ATV SPONSOR: POLARIS INDUSTRIES
Cold Pressure Fusing II Team Fusion
Low Energy Printing Project P09505
P08351: Automated Oiling System
Multidisciplinary Capstone Design:
HEMODYNAMIC SIMULATOR II P09026
P07021: Instrument to Detect Thromboemboli
SENIOR DESIGN PROJECT P08455
Multidisciplinary Capstone Design:
Capstone Presentation
Project Readiness Review P10029 – Air Muscle Artificial Limb
Project Lifecycle and IT Product Life Cycle
Low Energy Printing Project Overview
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Presentation transcript:

MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components

Design Team: Rishitha Dias - ISE – Project Manager Kevin Klucher - ME – Lead Engineer John Hayles - ME Reme Meck - ME Ammar Jangbarwala - ME

Project Background: Project Family: Sustainable Technologies for the Global Marketplace Project Track: Flow Visualization Sponsor: Dresser-Rand Corp. Faculty Guide: Dr. S. Day

Project Deliverable: The goal of the project is to design, build, test and deliver to KGCOE, a centrifugal pump system for particle imaging velocimetry studies, which can be used both as a teaching tool for undergraduate students as well as a research tool for graduate and faculty researchers.

Customer Needs: Primary Customers:  Faculty & Graduate Researches  Undergraduate Instructors Customer Needs / Target Specifications:  Generate Multiple Flows~ 3 Unique Impeller Designs ~ 2 Unique Diffuser Designs  PIV Compatibility>85% Transmissivity of Pump Components  Lab Teaching Tool< 5 min Impeller change out time > 0.45” Tool Clearance Measureable Flow, Pressure & Power. Must withstand a drop from 42”

Existing Pump System: Close-up view of Pump Housing & Impeller Sensors & Actuators Tank GUI

Existing Pump System:

Design Concept: Interchangeable Diffuser Interchangeable Impeller

Impeller and Diffuser Design Examples

Design Concept:

System Architecture:

Risk Item: Machining acrylic to make impellers is challenging Complex impeller designs are costly to manufacture  Manufacture impeller blades separately and glue to back-plate  Use Rapid Prototyping for complex geometries Risk Mitigation: High Risk: Part Manufacturing

High Risk: Technology Risk Item: Impeller/Diffuser Performance will not meet desired levels GUI I/O control for motor needs to be implemented  Use empirical results to improve component design  Seek assistance from Faculty Consultant Risk Mitigation:

Overall Progress: Platform: The existing pump system is functioning at an acceptable level. Schedule: The Design & Analysis is on schedule. Awaiting customer feedback to finalize. Budget: $6,500, expected costs are $2,100, not including the machining costs Performance:  Customer needs: On track to meet all customer needs, except Motor I/O control with GUI  Specification: On track to meet all specifications, except Pump Efficiency levels

Product development Phase: Current Stage of Design Phase 1 Phase 2 Phase 3 Phase 4 MSD I MSD II Planning Concept Development System Level Design Testing & Refinement

MSD II Milestones: Week 1 End: Improve Impeller Designs using Empirical Data Week 4 End: Completed Housing Assembly Week 5 End: Complete Basic Testing of Sealing etc. Week 6 End: Complete GUI I/O system Week 8 End: Complete Pump Performance Testing Week 9 End: Testing & Verification Finalized Week 10 End: Documentation Finalized, Project Review

Questions: