European design study on Neutrinofacilities - Euronu within FP7.

Slides:



Advertisements
Similar presentations
EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos.
Advertisements

NuSTORM March 2013 CERN Welcome and introduction.
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Introduction to EuCARD2 & WP4: Applications of Accelerators AccApplic  EuCARD2  WP4: Applications of Accelerators  The applications  Current workshops.
Participants WP3total Imperial College CERN STFC University Warwick CRNS University Oxford6 6 Total Euro  - WP3.
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
Costing Workshop Summary Chris Rogers, RAL, 30 Mar 2010 Establish a common framework for costing of neutrino facilities Compare Beta Beam, Super beam and.
Analysis and Control of Beam Dynamics in EMMA Kai Hock and Andy Wolski STFC PPRP Meeting, Glasgow, 24 June 2009.
Report from WP4: Applications of Accelerators AccApplic  Accelerator Applications  Aims of WP4  Workshops so far  Future workshops  Status  Plans.
International collaboration in high energy physics experiments  All large high energy physics experiments today are strongly international.  A necessary.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
BENE Meeting April 28, 2006 A. Bross US Contribution to the IDS Aka WDS BENE IDS/FP7 at RAL April 28, 2006 A. Bross.
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
SPC 17 March 2009 Alain Blondel European Neutrino Oscillation Experiments Towards a roadmap.
ISS After One Year Peter Dornan Imperial College London.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
The ISIS strong focusing synchrotron also at the Rutherford Appleton Laboratory. Note that ISIS occupies the same hall as NIMROD used to and re- uses some.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Proposal submitted 2 nd May 2007 “Approved” ~ beginning August 07  highest mark ever.
Networking Activity on Beams for European Neutrino Experiments BENE-Next ….. MEGLIO? Motivation Work Packages Partners & resources First ideas for the.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
Astroparticle Physics for Europe ASPERA -2 WP3: Knowledge and technology transfer 1. Kick-off meeting 7 July 2009, Rob van der Meer (FOM) WP 3 Knowledge.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
1 of 12 Stephen Brooks JAI Advisory Board, February 2006  Neutrino Factory Muon Beam Production Studies.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
RAL/ISS meeting, April Marcos Dracos Collection system, horn (work mainly done by Francis Osswald) goals and perspectives suppliers and collaborations.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Physics and Performance Evaluation Group NuFact 07 Okayama University, Japan August 6, 2007 Walter Winter Universität Würzburg for the executive committee:
NA-13 : EURISOL-NET Yorick Blumenfeld On behalf of the EURISOL DS management board.
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Aims of the Workshop  EuCARD2  WP4: Applications of Accelerators  Past workshops  Future workshops  Plans  Aims of this workshop EuCARD-2 is co-funded.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe History Aims Structure Some admin Rest of the meeting.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
TIARA – WP6 Involving Industry in TIARA Lucio Rossi (WPD) CERN.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
WP4: Applications of Accelerators AccApplic  WP4: Applications of Accelerators  The applications  Current workshops  Future workshops  Plans EuCARD-2.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
BrightnESS is funded by the European Union's Framework Programme for Research and Innovation Horizon 2020, under grant agreement Building a Research.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Ionisation Cooling Test.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
Moving away from the fish-eye view Integrating Surveys for the Ecosystem Approach 29 May 2013, Ingeborg de Boois (WGISUR)
EUROnu Review: 14 th April 2011 Summary of WP3 J. Pozimski.
Summary of IAP comments from 2007 EURISOL Town Meeting
Accelerator R&D for Future Neutrino Projects
Accelerator Research and Innovation for European Science and Society
WP 4 CERN Nov 2, 2009.
EU Institution Board 1 representative of each participating institute
Accelerator R&D for Future Neutrino Projects
Project Coordination Group (PCG) for the implementation of the MSFD
A High Intensity Neutrino Oscillation Facility in Europe
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

European design study on Neutrinofacilities - Euronu within FP7

FP7 Call for DS only Submission deadline 1st Mai Contribution from EU will not exceed 4M€ => A High Intensity Neutrino Oscillation Facility in Europe EURO Coordinator: Rob Edgecock

Proposal abstract …..The construction of such a facility in Europe would reassert Europe’s position as the lead region for high energy particle physics and it would be in line with the strategy for the future of European particle physics, as recommended by the CERN Scientific Policy Committee. The design study will review the three currently accepted methods to realize such a neutrino facility (the so-called neutrino Superbeams, Beta Beams and Neutrino Factories) and do detailed studies of potential show stoppers, it will define the detector options necessary to measure the neutrino oscillation parameters and it will perform a critical physics evaluation of these facilities. The design study will also perform a cost assessment, that coupled with the physics performance, will permit the European research authorities to make a timely decision on the lay-out and construction of the future European neutrino oscillation facility. Doing this work now will enable Europe to secure the lead in this field.

Participant no.Participant organisation namePart. short nameCountry 1 (Coordinator)STFC Rutherford Appleton LaboratorySTFCUK 2Commissariat à l'Energie AtomiqueCEAFrance 3European Organisation for Nuclear ResearchCERNSwitzerland 4University of GlasgowGLAUK 5Imperial College of Science, Technology and MedicineICLUK 6University of ValenicaIFICSpain 7Centre National de la Recherche ScientifiqueCNRSFrance 8CracowPoland 9University of DurhamDURUK 10Instituto Nazionale di Fisica NucleareINFNItaly 11Neutrino Factory Muon Collider CollaborationNFMCCUS 12MPIGermany 13"The Chancellor, Masters and Scholars of the University of Oxford" UOXF.DLUK 14Paul Scherrer InstitutPSISwitzerland 15Sofia University St. Kliment OhridskiUniSofiaBulgaria 16University of WarwickUK 17Université Catholique de LouvainUCLBelgium

Work packages Work package No Work package titleType of activity Lead participant No Person- months Start month End month 1Management and Knowledge Dissemination MGT Super-BeamRTD Neutrino FactoryRTD Beta BeamRTD Detector PerformanceRTD Physics ReachRTD TOTAL Approximately a total of 1M€ will be available for each of WP2,3,4 for 3 years

Objectives (WP3) The International Scoping Study of a future Neutrino Factory and Super- Beam facility (the ISS), in which BENE played both seminal and leading roles, established the baseline specification for the various accelerator systems that are required to produce high-intensity, high- energy neutrino beams in the Neutrino Factory. The ISS also established that the remaining crucial issues that must be addressed through the Design Study are: the muon front-end, including the ionisation-cooling channel; the large-aperture, rapid, acceleration systems; and the handling of the high-power proton beam that emerges from the pion-production target. In addition, in order to assess quantitatively the performance of the Neutrino Factory it is essential to develop an end-to-end simulation of the accelerator complex.

Description of work Coordination task: leading the task, with responsibility for ensuring that the specification of the muon front-end and acceleration systems are compatible. It is also responsible for ensuring that an appropriate framework for the end-to-end simulation is available (participant 5) Muon front-end task: The muon front-end task will provide a detailed evaluation of the performance of the muon front-end and determine its cost (participants 1, 3, 5, 13,16) Acceleration task: The acceleration task will develop a detailed definition of the acceleration scheme that is matched to the muon front-end and evaluate both its performance and its cost (participants 1, 3,5,7,13) Decay ring task: The decay ring task will provide a detailed evaluation of the performance of the decay rings and determine its cost (participants 1, 5) Proton-beam handling task: will develop a detailed concept for the handling of the spent proton beam that emerges from the target taking into account health and safety issues and determining a baseline cost. & Pion decay (participants 1, 14, 16) Integration task: The integration task will deliver an appropriate end-to-end simulation of the accelerator complex that will allow the performance of the facility to be determined (participants 1, 3, 5)

Deliverables Completed review of ionisation-cooling and muon acceleration options, 15 months Completed simulation of baseline and alternative ionisation-cooling channel (report). Recommendation of reference design, 30 months Cost and performance for reference muon front end (report), 30 months Completed simulation of baseline and alternative muon acceleration system. Recommendation of reference design. Cost and performance for reference muon acceleration (report), 38 months Completed simulation and cost and performance analyses for decay rings (report), 38 months Completed evaluation (cost and performance) of reference design for spent proton- beam handing system (report), 38 months Completed end-to-end simulation and evaluation of the performance of the Neutrino Factory as input to the comparison, 40 months

Participant no. /short name WP1WP2WP3WP4WP5WP6Total person months 1 STFC CEA CERN Glasgow IC IFIC CNRS Cracow Durham INFN NFMCC MPI UOXF.DL PSI Sofia Warwick UCL Total