Presentation is loading. Please wait.

Presentation is loading. Please wait.

14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.

Similar presentations


Presentation on theme: "14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7."— Presentation transcript:

1 14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7

2 14 mars 2007M. Dracos, Neutrino Design Study2 FP7 call and first discussion with EU officers DS structure Future actions Neutrino Oscillation Facility Design Study in FP7

3 14 mars 2007M. Dracos, Neutrino Design Study3 Work Program: Capacities

4 14 mars 2007M. Dracos, Neutrino Design Study4 FP7 Capacities Work Programme: Infrastructures

5 14 mars 2007M. Dracos, Neutrino Design Study5 Design Studies budget

6 14 mars 2007M. Dracos, Neutrino Design Study6 ESFRI and CERN strategy group report

7 14 mars 2007M. Dracos, Neutrino Design Study7 Discussion with EU officers (meeting the 05/01/07 with D. Pasini and C. Kurrer) Encouragements for a neutrino DS, not more than 5 M€ by EU, duration: 4 years, possibility to extent the DS using the 2010 call, meanwhile possible to participate to IA proposals, but very difficult to obtain funding for R&D, IA more for improving existing facilities, investigate for ERC grants (young physicists).

8 14 mars 2007M. Dracos, Neutrino Design Study8 Neutrino Oscillation Facility Design Study in FP7 Title:European Design Study of a High Intensity Neutrino Facility Acronym: EURO- Aim: Study and comparison (physics performances and cost) of the different options in order the neutrino European community to be ready for the particle physics decisions of 2010-2012. Duration:4 years Cost:<5 M€ (+institutes participation ~50% with a minimum of 25%) Coordinating person:R. Edgecock Host institutes:CCLRC more details in: http://gdrneutrino.in2p3.fr/documents/euro_nu_DS.pdf

9 14 mars 2007M. Dracos, Neutrino Design Study9 p-driver target collector  front-end  accel. stor. ring technologies  beamOverview SBBBNF  13 CPVMSW … (non-acc.  ?) LAr Cerenkov Emulsions magnetized physics detectors facilities optional or not baseline

10 14 mars 2007M. Dracos, Neutrino Design Study10 p-driver target collector  front-end  accel. stor. ring technologies  beam Work Packages Super-Beam Neutrino Factory Beta-Beam in order to underline synergies… Near det. Beam instr. Far det. Perform. Comparison Detectors Physics

11 14 mars 2007M. Dracos, Neutrino Design Study11 Work Packages 1. 1.Management (R. Edgecock, M. Lindroos, M. Dracos) 2. 2.Super-Beam (M. Zito, C. Densham) 3. 3.Neutrino Factory (K. Long, J. Pozimski) 4. 4.Beta-Beam (complementarities with EURISOL DS) (A. Fabich, M. Benedikt) 5. 5.Detectors (near, far, beam instrumentation) (P. Soler, xx) 6. 6.Physics (performances, comparisons) (P. Hernandez, A. Donini)

12 14 mars 2007M. Dracos, Neutrino Design Study12 Distribution of resources WPmonths% Management487.4 Super-Beam168 (78 target 36 horn 24 p-driver 30 integration) 25.9 (12.0 target 5.6 horn 3.7 p-driver 4.6 integration) Neutrino Factory14422.2 Beta-Beam13220.4 detectors8413.0 physics7211.1 TOTAL648~13.5 FTE/year

13 14 mars 2007M. Dracos, Neutrino Design Study13 EURO- and ESGARD ESGARD supports the DS on neutrinos with all the partners ready to contribute. It is in line with the strategy document and would enhance the EU role in this field. P-driver is studied elsewhere. Therefore, it should only be in this DS for consistency of the whole project, with a lower priority and without asking for money. Detectors should not be a large part of the DS and be only included for consistency of the project. Astrophysics community is working on detector proposals. Caveat: 1. 1.all ingredients must be part of the project so that its success does not depend on institutes external to the collaboration. 2. 2.There must be a unique coordinator who can be helped by additional scientific coordinators if necessary.

14 14 mars 2007M. Dracos, Neutrino Design Study14 Proposal preparation Proposal preparation: R. Edgecock, M. Lindroos, M. Dracos (under BENE SG supervision). Identify all interested institutes: under way (summary of the project already prepared: http://bene.web.cern.ch/bene/euro_nu_DS.pdf)http://bene.web.cern.ch/bene/euro_nu_DS.pdf Propose WP coordinators: finished Proposal presentation: 7 Feb. (BENE SG meeting) and 28 th March(?). Draft to be sent to the participating institutes for approval: end of March Discussion with Brussels: end of March Signature by participating institutions: beginning of April Final proposal agreed: 20 Apr. Proposal delivery: 2 nd May

15 14 mars 2007M. Dracos, Neutrino Design Study15 END

16 14 mars 2007M. Dracos, Neutrino Design Study16 Possible participants Bulgaria:Sofia France:Grenoble, Saclay, Strasbourg Germany:Julich, Rostock Italy:Bari, Genoa, LNF, LNGS, LNL, LNS, Milan Latvia:IPUL Russia:Dubna, ITEP, Novosibirsk Sweden:Uppsala Switzerland:CERN, ETH, Geneva, PSI UK:Brunel, CCLRC, IC, Oxford, Sheffield, Warwick Poland:Cracow

17 14 mars 2007M. Dracos, Neutrino Design Study17 Work Package Proposal 1 WP1 – Management: Coordinator: EdgecockLead lab: CCLRC Consortium Board Membership: DS coordinators WP coordinators 1 member/institute Purpose: Oversight of DS Meetings: Twice per year or as required Steering Committee Membership: DS coordinators WP coordinators IDS representatives Others ex-officio as required Purpose: Running the DS Meetings: Every two months


Download ppt "14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7."

Similar presentations


Ads by Google