Timing upgrades after LS1 Jean-Claude BAU BE-CO-HT1.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
20/01/09 OPERA general meeting Nagoya CNGS report.
Demands and Requirements for the New Control System for GSI Future Accelerators An Overview U. Krause, S. Richter, P. Schütt.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
The TIMING System … …as used in the PS accelerators.
Updates on RF synchronization and fast trigger distribution A. Butterworth, H. Damerau, W. Hofle Acknowledgements: T. Bohl, S. Doebert, I. Kozsar, J. Molendijk,
E. Hatziangeli – LHC Beam Commissioning meeting - 17th March 2009.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Distribution of machine parameters over GMT in the PS, SPS and future machines J. Serrano, AB-CO-HT TC 6 December 2006.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
LHCOP / SPS Cycling for LHC1 SPS cycling for LHC injection J. Wenninger AB/OP Introduction to the timing system. Timing and settings constraints.
WWWWhat timing services UUUUsage summary HHHHow to access the timing services ›I›I›I›Interface ›N›N›N›Non-functional requirements EEEExamples.
The CERN LHC central timing A vertical slice Pablo Alvarez Jean-Claude Bau Stephane Deghaye Ioan Kozsar Julian Lewis Javier Serrano.
SPS RESTARTING AFTER LS1 05/03/2015 Stéphane Cettour Cavé.
The CERN LHC central timing A vertical slice
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
T HE BE/CO T ESTBED AND ITS USE FOR TIMING AND SOFTWARE VALIDATION 22 June BE-CO-HT Jean-Claude BAU.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
SPS Timing. Outline Timing table Modes of operation Mode switch mechanism External events Creating a timing table Timing event cleaning.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
Sept-2003Jean-Claude BAU1 SEQUENCING AT THE PS Let’s take a quick tour.
1 LTC Timing AB/CO/HT Central timing hardware layout Telegrams and events Postmortem, XPOC LHC Central Timing API Fill the LHC Use Case Julian Lewis.
The CERN LHC central timing A vertical slice Pablo Alvarez Jean-Claude Bau Stephane Deghaye Ioan Kozsar Julian Lewis Javier Serrano.
Debriefing of controls re-commissioning for injectors after LS1 TC 09 October 2014.
LANSCE Master Pattern Generator Eric Björklund LANSCE-8 Controls Software (LA-UR )
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
CERN Raul Murillo Garcia BE-CO LS1 review – TE-EPC feedback BE-CO LS1 review TE-EPC feedback Raul Murillo Garcia on behalf of TE-EPC Daniel Calcoen Stephen.
FESA FRONT-END SOFTWARE ARCHITECTURE [FESA] Michel Arruat, Leandro Fernandez, Stephen Jackson, Frank Locci, Jean-Luc Nougaret, Maciej Peryt, Anastasiya.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
1 LHC Timing Requirements and implementation J.Lewis for AB/CO/HT 21 st /Sep/06 TC presentation.
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Feedbacks from EN/STI A. Masi On behalf of EN-STI Mathieu Donze` Odd Oyvind Andreassen Adriaan Rijllart Paul Peronnard Salvatore Danzeca Mario Di Castro.
CERN Timing Overview CERN timing overview and our future plans with White Rabbit Jean-Claude BAU – CERN – 22 March
The ACCOR Project Status Report and Outlook for 2010 and beyond M.Vanden Eynden on behalf of the ACCOR Project Team 1M.Vanden Eynden (BE/CO) - IEFC Workshop,
1 Events for the SPS Legacy & Common Implications.
22/09/05CO Review: FESA IssuesJJ Gras [AB-BDI-SW] 1/18 AB-CO Review FESA  The Functionality  The Tools  The Documentation  The Support  Maintenance.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
ProShell Procedure Framework Status MedAustron Control System Week 3 October 3 rd, 2011 Roland Moser PR a-RMO, October 3rd, 2011 Roland Moser 1.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
CO Timing Review: The OP Requirements R. Steerenberg on behalf of AB/OP Prepared with the help of: M. Albert, R. Alemany-Fernandez, T. Eriksson, G. Metral,
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
© 2001 By Default! A Free sample background from Slide 1 Controls for LEIR AB/CO Technical Committee - 18 th March 2004.
E. Hatziangeli – LHC Beam Commissioning meeting - 3 rd March 2009.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
LSA Core overview 6 / 11 / 2007 Wojciech Śliwiński (AB-CO-AP) on behalf of LSA team.
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
Proposals 4 parts Virtual Accelerator Open CBCM Data Base Cycle Server Quick Fix.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
SPS availability K. Cornelis Acknowledgments : A. Rey and J. Fleuret.
1 Synchronization and Sequencing for high level applications Julian Lewis AB/CO/HT.
LS1 Review BE-CO-SRC Section Contributions from: A.Radeva, J.C Bau, J.Betz, S.Deghaye, A.Dworak, F.Hoguin, S.Jensen, I.Koszar, J.Lauener, F.Locci, W.Sliwinski,
Timing Review Evolution of the central and distributed timing How we got where we are and why What are its strengths and weaknesses.
V4.
SPS Applications Software issues - startup in 2006 and legacy problems
Layout.
Data providers Volume & Type of Analysis Kickers
SLS Timing Master Timo Korhonen, PSI.
Javier Serrano CERN AB-CO-HT 29 February 2008
Database involvement in Timing
EC Activities Status for the LIU
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Timing System GSI R. Bär / U. Krause 15. Feb. 2008
LHC injection timing simulation
LHC BLM Software audit June 2008.
Tools for the Automation of large distributed control systems
Presentation transcript:

Timing upgrades after LS1 Jean-Claude BAU BE-CO-HT1

Outline Timing for frond-end computers CBCM (LHC injector chain) ◦Dedicated central timing for AD ◦New FESA interfaces ◦New SPS Start/Stop management ◦New SPS coast management ◦New SPS energy saving management ◦Master/Slave mechanism removed ◦Other changes ◦Planning Conclusion Jean-Claude BAU BE-CO-HT2

Timing for front-end computers Timdt timing library ◦Available since mid 2012 ◦Integrated in FESA 3 ◦Compatible with TGM library in a same front- end ◦Need a specific startup sequence  TimService instead of Get-tgm-tim & Timload  TimService provides all services for timdt & TGM Local timing renovation ◦Replacement of all TG8s by CTRs ◦Part of the ACCOR project Jean-Claude BAU BE-CO-HT3

CBCM: Dedicated central timing for AD AD removed from the LIC central timing AD will have its own central timing located in the building 193 Needed for the future ELENA decelerator Beam will be negotiated with their rdv points (PS extraction and AD injection) ◦Synchronization negotiated in absolute time ◦PS extraction and AD injection can move independently ◦No changes in the way the PS beams for ADE are declared in a BCD. Deployment for mid-march 2014 Jean-Claude BAU BE-CO-HT4

CBCM: New FESA interfaces The CTIM GM class has been migrated to 4 FESA 3 classes: ◦CTIM_Machine (Machine phase) ◦CTIM_Virtual (Events family) ◦CTIM_Key (Events sent on the GMT cables) ◦CTIM_Asynchronous (Triggered events) The MTG GM class has been migrated to 2 FESA 3 classes: ◦MTG_ExCond (External conditions) ◦MTG_CCVGroup (Control of a Telegram group) The CYPAR GM class has been migrated to the CycleParam FESA 3 class All the new FESA device names will have the suffix "-CTML" instead of "-CTM“ (ex: EC.128-CTM  EC.128-CTML) Consult the wiki page to know the relationship between the GM and new FESA classes Jean-Claude BAU BE-CO-HT5

CBCM: New SPS Start/Stop management ROCS replaced by the FGCD framework Pulse start/stop will be managed by the FGCs at any place in a supercycle Pulse start/stop synchronized with the central timing The pulse start/stop BCDs will be not required anymore in a sequence. Jean-Claude BAU BE-CO-HT6

CBCM: New SPS COAST management The FGCs will be able to suspend/recover the execution of a function. It will be driven by the timing. To be coastable, a SPS cycle must be : ◦Declared as coastable ◦To be alone in the supercycle ◦The same cycle must be declared in normal and spare. ◦The normal must be linked to the PS but not the spare The LIC central timing ◦will go in coast on demand ◦will play the normal or the spare depending on the coast state  Normal for coast prepare, ‘spare’ for coast and coast recover During a SPS coast ◦Impossible to change the sequence/BCD being executed ◦Impossible to change the SPS supercycle BCDs for coast prepare, coast and coast recover are not needed anymore in a sequence Jean-Claude BAU BE-CO-HT7

CBCM: New SPS energy saving management The full economy mode will be able to start at any place in the supercycle Partial economy mode will be controlled only by the BCT which measures the beam in the SPS injection line. All these new SPS features are described in a document (draft state) Jean-Claude BAU BE-CO-HT8

CBCM: Master/Slave mechanism removed Master/Slave mechanism was used to upgrade the LIC central timing in real time ◦Functionality not used since LHC ◦Upgrades made only during technical stops or shutdowns Disruption of the timing distribution during an upgrade Fast upgrade rollback is implemented Significant simplification of the LIC central timing ◦2 front-ends instead of 5 Jean-Claude BAU BE-CO-HT9

CBCM: Other changes All the SPS legacy timing events have been removed ◦OX.xxxx-CT, OIX.xxxx-CT, OEX.xxxx-CT Ion & Proton at the same time in the SPS ◦Ion for North area & proton for other destinations ◦The central timing will help to protect the North area from receiving protons Jean-Claude BAU BE-CO-HT10

CBCM: Planning After mid-March, smooth upgrades will be necessary to tweak the central timing systems. Jean-Claude BAU BE-CO-HT11 DescriptionDate LIC central timing - Phase 1 - Hardware renovation - FESA classes 26 November 2013 LIC central timing - Phase 2 - AD removed from LIC - New SPS facility Mid-March 2014 AD central timingMid-March 2014

Conclusion No revolution but significant improvements to the Operation No new constraints added to the Operation Some complexities have been removed ◦Simplifies diagnostics ◦Increases the reliability Jean-Claude BAU BE-CO-HT12