Land Building Sediment Diversion at Myrtle Grove: Evolution & Status Update Brian Vosburg Geologist Governor’s Advisory Commission Meeting August 1 2012.

Slides:



Advertisements
Similar presentations
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Advertisements

Restoring and protecting Louisiana’s coast January 18, 2011 CPRA Meeting David Peterson Asst. Attorney General and AG Designee to CPRA Civil Division Lands.
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Shell Island West NRDA Restoration
US Army Corps of Engineers BUILDING STRONG ® LOUISIANA COASTAL AREA (LCA) PROGRAM UPDATE June 16, 2010 Presented by: Bren Haase, OCPR Mark Wingate, USACE.
US Army Corps of Engineers BUILDING STRONG ® Louisiana Coastal Area Modification of Davis Pond Study Overview Governor’s Advisory Commission on Coastal.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Restoring and protecting Louisiana’s coast Barrier Plan June 16, 2010 Kyle Graham Deputy Director of Planning and Programs Office of the Governor – Coastal.
Mid-Barataria Diversion - Status Update committed to our coast Andrew Beall Project Manager Governor’s Advisory Commission Meeting December 5, 2012.
Bayou Dupont Sediment Delivery – Marsh Creation #3 (BA-164)
Coastal Protection and Restoration Authority Presentation to Coastal Financing Authority July 30, 2008.
Fiscal Year 2013 Annual Plan BRIEFING TO: COASTAL PROTECTION AND RESTORATION AUTHORITY Baton Rouge, LA January 18, 2012.
FERC & Hydrokinetic Projects Ocean Energy for New England Conference Hosted by the Marine Renewable Energy Center at the Advanced Technology and Manufacturing.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Project Planning with the U.S. Army Corps of Engineers (USACE) Presenter Name Presenter Title.
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
State Drinking Water Administrators’ Current Issues NARUC Committee on Water Jim Taft, Executive Director Association of State Drinking Water Administrators.
April, 2008 Office of Coastal Restoration & Management PROJECT UPDATE Office of Coastal Restoration & Management PROJECT UPDATE.
US Army Corps of Engineers Coastal and Hydraulics Laboratory Engineer Research and Development Center Lower Susquehanna River Watershed Assessment Two.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Presentation to Contra Costa County Climate Leaders October 3, 2013.
River Basin Management Plans & Strategic Environmental Assessment & Appropriate Assessment Ray Spain Local Authorities Workshop, 3 rd December 2008.
LCA Mississippi River Hydrodynamic and Delta Management Study (MRHDMS) Carol Parsons Richards River Studies Manager Governor’s Advisory Commission on Coastal.
Chesapeake Bay Program: Governance and Goals Options for Principals’ Staff Committee Consideration March 7, 2013.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
Georgia’s Water Plan June 17, /09/08 Page 2 Agenda Plan Development Plan Overview.
Restoring and protecting Louisiana’s coast David Peterson – La. AG’s Office – Asst. Attorney General - AG Designee to CPRA Ken Ortego – Vilar and Elliott.
Progress on Coordinating CBP and Federal Leadership Goals, Outcomes, and Actions Principals’ Staff Committee Meeting 2/16/12 Carin Bisland, Associate Director.
Oil Spill Restoration Planning – NFWF Proposal No.1 Kyle Graham Deputy Director CPRA July 17, 2013 committed to our coast.
Increase Atchafalaya Flow to Terrebonne Governor’s Advisory Commission Meeting 7 August 2013 committed to our coast.
SOUTHWEST COASTAL AND SOUTH CENTRAL PROJECTS – Update and Path Forward CPRA Meeting January 22, 2013 committed to our coast.
Update On Mississippi River Delta Management Plan Presented at August 20, 2009, Meeting of Governor’s Advisory Commission on Coastal Protection, Restoration.
Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast.
Coastal Restoration Updates September 10, 2007 Coastal Restoration Updates September 10, 2007 Louisiana Department of Natural Resources Louisiana Department.
Connecticut Department of Energy and Environmental Protection.
Managing the Mississippi River’s Sediment, Nutrients, and Fresh Water July 13, 2011.
Mississippi River Long Distance Sediment Pipeline Project Louisiana Office of Coastal Protection and Restoration Coastal Protection and Restoration Authority.
Central Florida Coordination Area South Florida, St. Johns River and Southwest Florida Water Management Districts.
WFD National Stakeholder Forum 29 th /30 th October 2003 Building and Engineering Works Dr. Scot Mathieson Conservation Advisor SEPA.
Oil Spill Restoration Planning Part 2 (RESTORE Act, Criminal, NRDA, SEPs) Kyle Graham Deputy Director CPRA May 15, 2013 committed to our coast.
1 Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA) Overview.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
Safeguarding California: Implementation Action Plans Listening Tour October 2015.
STATUS UPDATE FOR CPRA January 26,  Study combines Cong. Boustany Recon with LCA Chenier Plain Effort  Cost Share Agreement signed in Jan
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
Implementing the Master Plan Kyle Graham Deputy Executive Director CPRA June 20, 2012 committed to our coast.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
LCA Program State Concerns Moving Forward February 25, 2010 Kyle Graham Governor’s Office Coastal Activities.
Date Planning for Compliance with the Final 316(b) Phase II Regulations For APPA – March 8, 2004 David E. Bailey EPRIsolutions.
2017 Coastal Master Plan Overview Karim Belhadjali
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Coquina Coast Seawater Desalination Project TERMS Base Contract TasksBase Contract Tasks – Must be completed – Negotiated and included in the Base Allowance.
CPRA Program Update ACEC, New Orleans Chapter April 14th, 2016
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
April 4, 2011 Princesa VanBuren Hansen Environmental Quality Board.
Project Updates Louisiana Water Synergy Project May 19, 2016.
Louisiana’s Coastal Protection and Restoration Update
CPRA Program Update ACEC, New Orleans Chapter April 14th, 2016
Chromium 6 Regulation Corrective Action Plan October 6, 2015
Expert Panel on Diversion Planning and Implementation: Meeting #3
Louisiana Coastal Area
Mississippi River Hydrodynamic and Delta Management Study
Diversions Update committed to our coast Kyle Graham, CPRA
Executive Order No. 23 Update Air & Waste Management Association Conference November 16, 2018 Presentation will focus on the latest policy development.
2023 Coastal Master plan committed to our coast
System Safety Regulation
Presentation transcript:

Land Building Sediment Diversion at Myrtle Grove: Evolution & Status Update Brian Vosburg Geologist Governor’s Advisory Commission Meeting August committed to our coast

Coastal Protection and Restoration Authority of Louisiana Re-cap of State/EDF Joint Myrtle Grove Investigation LCA Myrtle Grove Feasibility Study Status Update 2012 State Master Plan and the Myrtle Grove Diversion State Led Myrtle Grove/Mid-Barataria Diversion Engineering, Design and Permit Application Effort Overview Presentation Overview

Coastal Protection and Restoration Authority of Louisiana Joint venture between CPRA & Environmental Defense Fund intended to provide the LCA Feasibility Study with robust decision making tools in the form of numerical hydrodynamic models based on site specific observational data Included site specific river data collection, riverside hydrodynamic modeling, and bayside hydrodynamic and land building modeling Seven Data collection events ( ) at river discharges of 300,000 – 1,100,000 cfs Multi-dimensional river modeling of an array of diversion sizes, locations and alignments to identify optimal intake location and diversion configuration Bayside hydrodynamic modeling of water levels and velocities to evaluate impacts of different discharges and operating regimes State/EDF Joint Myrtle Grove Investigation

MYRTLE GROVE

WATER DISCHARGE

P-6/63 Point Integrative Isokinetic Sampler Spatial Trends (Bar Position)

ADCP Bar (sand) Resuspension May K cfs 726.4K cfs

Lateral Bar Face Suspended-Bedload Cycle THALWEG LATERAL BAR Bedforms R H Water Vel.

Myrtle Grove Diversion FLOW-3D Model Domain

Coastal Protection and Restoration Authority of Louisiana FCSA executed and Study initiated May √ Develop and Screen Initial Measures August √ Hydrodynamic Modeling (Barataria Bay water level and salinity) February 2013* Identify Tentatively Selected Plan May 2013 Chief’s Report signed October 2014 LCA Myrtle Grove Feasibility Study

Coastal Protection and Restoration Authority of Louisiana Identified 8 Diversion Projects, including one in the vicinity of Myrtle Grove- “Mid-Barataria Sediment Diversion” 50, ,000 cfs sediment diversion in the vicinity of Myrtle Grove intended to maintain existing land and build new land Two phases- initial 50,000 cfs magnitude, then increase to larger 250,000 cfs magnitude sometime in the future 2012 State Master Plan & Myrtle Grove

Keystone of the 2012 Master Plan: Reconnecting the River Flow regimes of sediment diversions based on flow in river. Large-scale diversions (250,000 cfs) operate at full capacity for short periods of time (typically less than a month) and in some years, are not operated at all at full capacity. Uses up to 50% of the Mississippi River’s peak flow.

Coastal Protection and Restoration Authority of Louisiana The State is currently in the process of seeking a Contracting Firm that will manage the complete process of engineering and design, environmental compliance, and permit application for a ~50,000 cfs magnitude Diversion in the vicinity of Myrtle Grove. (Mid-Barataria Sediment Diversion) State Led Engineering, Design and Permit Effort

Coastal Protection and Restoration Authority of Louisiana A sediment diversion at this location is a top priority for the State. The LCA Myrtle Grove Study will continue, and will communicate and coordinate with this effort. Provides a Parallel Path for the LCA Myrtle Grove Diversion and the State Master Plan Mid-Barataria Diversion. Goal is to ensure that the State is well prepared to act should sufficient funding become available to implement the project, particularly if the funding becomes available relatively soon. The “parallel path” approach will best position the State to implement this important project should funding become available from any source. State Led Engineering, Design and Permit Effort

Coastal Protection and Restoration Authority of Louisiana Key Milestone Dates (tentative) Mid-August 2012 – Selection of Contracting Firm Mid-October 2012 – Issuance of NTP Mid-October 2013 – Submittal of Permit Application Mid-April 2014 – Submittal of Final Design with bid Documents State Led Engineering, Design and Permit Effort