MOM Commissioning Requests [Ken mail ] Target: - Timing - Turn-key system for target operation Beam counters: - Remove BC1 - Readout BC2 Electronics: -

Slides:



Advertisements
Similar presentations
USING THE TELEPHONE.
Advertisements

K. Long, 18 April, 2015 Beam-line status — red sky at night?
Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
MICE Target Electronics, DAQ and BPS MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
1 10 Dial-a-Prayer and Follow-up Phone Calls Click to start DAP 10.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
MOM report 23/9 – 28/9 G.CECCHET. MOM report Hall PPS commissioning Target tests last night MOM laptop.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
MICO Alain Blondel 17 March MICO Alain Blondel 17 March MICE target test-run March 2008 Friday 14/03/2008 6:00-> 18:00 Saturday 15/03/2008.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
November 4th 2009MICE CM25 - RAL1 Commissioning Needs – MICO83 m. apollonio  g. cecchet.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
M.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ M. Apollonio – MICE Operations Manager University of Oxford MICE beam line commissioning.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
M. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Magnets Dry Run ISIS Scheduling Meeting Latest news on Target Ready to run ? Summary of: Magnets.
MOM Report. Shield Wall – Gone Before During After 2.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Commissioning needs K.Long. Machine start: Target ready to go Water leak: –In branch in trench serving D2, Q4 – Q6: Small leak exacerbated by header tank.
1 MICE Magnets Contents: Background Refurbishment Testing Installation & survey Current status Upstream beamline Open issues & concerns MICE Beamline Review,
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Tele-Sales Force (TSF) Lead Generation Campaign Script.
K. Long, 2 December 2014 Spokesman’s update 1. Contents: Update Step IV – Installation and commissioning – Preparations for data taking Shift tool; CHEESE.
1 Hall & Beamline Installation Richard Apsimon, Andy Nichols, Willie Spensley MICE Collaboration Meeting, th Feb 2008.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Pete Mendicino Mendicino.net (443) Slide number 1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
MOM Report Paul Hodgson Paul Soler Victoria Blackmore VC-139: 14/04/111/8.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
MICE VC MOM Report, 25 th February 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - Machine Physics and User Runs - Suggestions.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
MICE MICO Alain Blondel 23 December MICE Commissioning needs 22 December 08.
MICE VC 12/2/20091 [23/1-19/2] MOM report Hogdson Apollonio Zisman 23/1/09 12/2/09 19/2/09 Relevant Issues: - NO target since december accident  no data.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
© 2015 albert-learning.com How to talk to your boss How to talk to your boss!!
Welcome to My Reading Recovery Lesson. Rereading Familiar Books In every lesson every day I get to read lots of little books. I get to pick some of my.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
MICE Operations Scenario Run 1
Presentation transcript:

MOM Commissioning Requests [Ken mail ] Target: - Timing - Turn-key system for target operation Beam counters: - Remove BC1 - Readout BC2 Electronics: - Repair/return NIM crate - Start programme of checking NIM modules - Buy some NIM modules as spares Magnets: - Leak in Q6  action on Q5 too ??? - Power supplies: Q1 and Q2 - Slow controls CTRL over quadrupoles (from MICE CR)

Craig, Kenny, Well, it went well on Saturday night, but, I blew up another NIM crate. I'd 'borrowed' it from Dave Sankey's lab. I'll him in a moment, but, it seems clear that we need a testing programme to see where we are. Craig, is there a NIM crate that we can replace the one lent by Dave? I'd have two requests: * Craig: could we discuss a testing plan to establish which of the modules is good? * Paul: Could you make a reasonable list of modules that we should buy as spares and perhaps to replace some of the ancient modules that we currently rely on. Also, Ash is happy to organise a cupboard of connectors etc. Perhaps you and Craig could help him with the list of things.

Kenny, James, Adam, The beam counter worked OK on Saturday night. It saw particles, but was swamped by background. So, I think what we have to do is: * Remove BC1 -- its only material in the beam! * Readout BC2: Kenny and Adam will be coming to RAL Wednesday-Friday to make sure this happens (I think). K

Dear All, Firstly, Paul and Paul did a very good job Saturday/Sunday. It was a very important, and successful, run and both Pauls rearranged there schedules at the last minute to make it possible. Of course, the run threw up some issues which we should try and address: * Timing: we need a programmable delay, I think. The reason is that the ISIS timing signal seems to be just on the edge of what the target electronics can cope with. Perhaps we should buy a programmable unit. I think the specification should be driven by Steve G in consultation with Paul S and ISIS. Is that reasonable? * Operation: The target operation was pretty smooth, a credit to those who put it together. However, its an 'experts only' system at the moment. Should we try and get some effort to help make it a 'turn key' system? Congratulations! K

Marco, Kevin, Malcolm, I attach the spread sheet I made out of the BC1 and GVA2 counts. Its Excel and the empty boxes did not have a number recorded. Seems clear to me that BC1 sees the target, but is swamped by noise. I think we should take it out at the next opportunity. Hope this is explicable and can be archived with the rest of the stuff. K

A successful run on Saturday night -- but a few issues: * Water leak in Q6: This seems to be in the outer (downstream) manifold on the downstream end of the magnet. On the manifold it is at the bottom right as you face the magnet looking upstream. Perhaps its as simple as tightening a jubilee clip, but I fear it will require removing at least one mirror plate. In this case we'll have to discuss removing the beam monitor or at least replacing the aluminium cover. * Power supplies for Q1 and Q2: We need to continue to chase Dan Fysik over this while Graham is on holiday. Who should do this, is it Martin or Steve -- or someone else? * The slow controls for the magnets worked fine, but we need to fix a few gremlins and make a write up for the control room. I wonder if Pete Owens could spend a little time at RAL to work on this in advance of the shift on Wednesday evening. * Network to the remaining power supplies should be expedited now. Who should drive this -- Steve or Adrian?

Hi Ken Sounds like a successful weekend as far as magnet power converters are concerned. I have spoken to Martin this morning and he tells me that Q4, 5 & 6 ran up manually without the need for modifications. Martin has agreed to chase Danfysik regarding Q1 & 2. Regarding slow controls, these are operational for Q1 to 3 and D1 & 2. Last week I asked Hickmans to install the serial cables to Q4 to Q9 power converter racks from the control rack, this will then enable all magnets to be remotely controlled. When is the next key date to have all power converters commissioned and fully operational? From my understanding the next area to focus on is the Decay Solenoid. This has now been rewired in its final position but requires recommissioning and the addition of control for CV1/2 by the Daresbury supplied control system. Regards Graham

Conclusions WATER leak on Q6 to be fixed for the time being no action (requires access to DSA with crane!) NB: Q5 has the same “bad practice” rubber connection (comment by John Govans as unsafe), so we need to think about proper connections with stiff pipes Next Runs WEDNESDAY 18:00  8:00 AM (thursday) FRIDAY “ “ “ “ (saturday) ~4000 actuations left Plan 1)re-establish target operations 2)use: BM1, GVA1, BC2, BM2, Cherenkov (?) 3)D1+D2 4)D1+D2 + Q4 5)D1+D2 + Q5 6)D1+D2 + Q4 + Q5 7)Take Data (DAQ) during these operations Survey: after 3600 actuations  6hrs) people needed - Paul & Paul for the target - Kevin & myself on the magnets - IC for beam monitors (Kenny, James, Ken …) - would be very nice to have Geneva for DAQ (J.Seb.? … )