GEOSS Task AR-09-01b Architecture Implementation Pilot Phase 6 (AIP-6) Bart De Lathouwer Open Geospatial Consortium (OGC) GEO-X Plenary, Geneva, Switzerland.

Slides:



Advertisements
Similar presentations
GEOSS ADC Architecture Workshop Break-out summaries: Initial Operating Capability (IOC) Doug Nebert U.S. Geological Survey February 5,
Advertisements

GEOSS Architecture Implementation Pilot, Phase 3 - Call for Participation - George Percivall, Open Geospatial Consortium GEO Task AR-09-01b Task POC December.
GEOSS Architecture Implementation Pilot Water Information Services with GEOSS Interoperability Arrangements George Percivall Open Geospatial Consortium.
High level summary and recommendations from AIP-3 George Percivall Open Geospatial Consortium Task lead AR-09-01B ADC-16, May 2011.
GEOSS Task IN-05 Architecture Implementation Pilot AIP-5 Point of Contact: George Percivall Open Geospatial Consortium (OGC) March 2012.
Successful Implementations for SBAs using GEOSS Interoperability Arrangements George Percivall The Open Geospatial Consortium Jay Pearlman, IEEE Nadine.
Summary Kick-off meeting AIP-6 (March 28-29, NOAA, Washington DC) Slides provided by Bart De Lathouwer Open Geospatial Consortium AIP Lead
GEOSS Task AR-09-01b Architecture Implementation Pilot Phase 4 (AIP-4) Nadine Alameh, George Percivall, Ingo Simonis Open Geospatial Consortium (OGC) GEOSS.
AR – Issues for Attention Tactical and Strategic Guidance documents – what is the agreed approval/ publication process? –Strategic Guidance will.
SIF Status to ADC Co-Chairs
GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.
Report of the Architecture and Data Committee (ADC) R.Shibasaki (ADC, Japan)
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
GEOSS Common Infrastructure (GCI)
Slide # 1 Report to ADC AR Status Doug Nebert, POC U.S. Geological Survey.
GEOSS Community Portal Recommendations Team Report.
From “Usability Testing 2009” to the “Sprint to Plenary 2011” GEO Portal and Clearinghouse: reaching out to users with user-friendly interfaces. Gary J.
Architecture Priorities. Why do stakeholders perceive that the architecture does not meet needs? Users are not seeing what they expect The interaction.
The Multi-disciplinary Interoperability research challenges: EuroGEOSS and EGIDA projects Stefano Nativi National Research Council of Italy (CNR ) GEPW-5.
GEOSS AIP-5 for World Water Online Registry An attempt to Integrate WaterML2 services in GEOSS.
GEOSS Task AR-09-01b Architecture Implementation Pilot Nadine Alameh, Ph.D. Open Geospatial Consortium (OGC) GEOSS Interoperability.
© GEO Secretariat GEO WP & 2013 GEO priorities for CEOS Support GEO Secretariat CEOS SIT-28 NASA - Langley March 2013.
GEO Architecture and Data Committee Architecture Workshop Hosted by the European Commission At the Joint Research Centre February 2008 DRAFT.
Update from the GEO Secretariat Rob Koopman 15 th Architecture and Data Committee Meeting Campos de Jordaõ, Brazil 28-FEB - 03-MAR-2011.
Vision and architecture of GEOSS Information System GEOSS Design and Evolution George Percivall The Open Geospatial Consortium (OGC) GEO Task IN-05 coordinator.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall Open Geospatial Consortium GEO Task AR Point.
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 14 & 15 May 2007.
GEOSS Architecture Implementation Pilot AIP February 2011 GeoViQua First Workshop George Percivall Open Geospatial Consortium Task Lead AR-09-01B - AIP.
AIP-2 Kickoff Workshop End-to-end use case: Discovery, access, and use with variations Doug Nebert GEOSS AIP-2 Kickoff September 2008.
ENV proposal meeting, Geneva, Sep. 24, GCI Presentation Joost van Bemmelen, ESA
GEOSS Architecture Implementation Pilot, Phase 3 - AIP-3 Initial Concepts - Hervé Caumont George Percivall Open Geospatial Consortium GEO Task AR-09-01b.
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
GEO Work Plan Symposium 2012 ID-03: Science and Technology in GEOSS ID-03-C1: Engaging the Science and Technology (S&T) Community in GEOSS Implementation.
Architecture Implementation Pilot-5 Disasters Management WG Encourage mature systems to interoperate with the GEOSS Common Infrastructure Hervé Caumont,
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall September 2008.
GEOSS Common Infrastructure Internal Structure and Standards Steven F. Browdy (IEEE)
Architecture Implementation Pilot-5 Disasters Management WG Encourage mature systems to interoperate with the GEOSS Common Infrastructure Hervé Caumont,
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC,
® GEOSS AIP 5 Water SBA Update HDWG June 2012 Matt Austin NOAA Stefan Fuest KISTERS Jochen Schmidt NIWA.
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 28 February & 1 March 2007.
Report of the Architecture and Data Committee (ADC) R.Shibasaki (ADC, Japan)
1 ISO WAF Community Catalog Product Access Servers Registry Clearinghouse(s) GEO Portals Community Portals Users Client Apps GetCapabilities ISO
GEOSS Common Infrastructure Initial Operating Capability Directions and Discussion Presented to GEO ADC Geneva May
Science and Technology Roadmap - current progress 1 st GEO/EGIDA Workshop Bonn, Germany, May 09 th - 11 th, 2011.
Implementing GEOSS architecture with-and-for Users George Percivall Open Geospatial Consortium Task lead AR-09-01B.
GEOSS Common Infrastructure Access to Priority Earth Observations Data “ Sprint to Plenary” Group on Earth Observations Eighth Plenary Session - GEO-VIII.
ISWG / SIF / GEOSS OOSSIW - November, 2008 GEOSS “Interoperability” Steven F. Browdy (ISWG, SIF, SCC)
® Reference Architecture and Agile Development George Percivall OGC Chief Engineer 4 April 2014 Copyright © 2014, Open Geospatial Consortium.
Strengthening Disaster Management using Earth Observations – GEOSS and CEOS Activities – George Percivall, Nadine Alameh; OGC John Evans, GST Karen Moe,
GEOSS Common Infrastructure: A Practical Tour Doug Nebert U.S. Geological Survey AIP-3 Kickoff March 2010.
ISWG / SIF / GEOSS OOS - August, 2008 GEOSS Interoperability Steven F. Browdy (ISWG, SIF, SCC)
GEOSS Task AR-09-01b Architecture Implementation Pilot AIP Phase 4, (AIP-4) Ingo Simonis Open Geospatial Consortium (OGC) ADC 17, Salzburg September 2011.
GEOSS Architecture Implementation Pilot, Phase 2 (AIP-2) George Percivall, Open Geospatial Consortium GEO Task AR-09-01b Task POC 2 February 2009.
Observation Integration across Disciplines in the GEOSS Architecture Implementation Pilot George Percivall and Bart de Lathouwer The Open Geospatial Consortium.
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 AR Interface implementations for GEOSS George Percivall
Helen M. Wood Co-chair / U.S.A. On behalf of the Data Sharing Task Force 22nd Meeting of the GEO Executive Committee Geneva, Switzerland July 2011.
OGC’s role in GEO: Results from the Architectural Implementation Pilot (AIP) George Percivall Open Geospatial Consortium GEO Task IN-05 Coordinator
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot GEO Task AR Team Representatives: - Doug Nebert, USA/FGDC - Larry.
ESA-FAO GEOPortal STATUS & PLANS
GEO Task AR Team Representatives: Doug Nebert, USA/FGDC
AIP-5 Kick-off Workshop Summary 3-4 May 2012, UNEP, Geneva
Steve Peedell Joint Research Centre
GEO Task IN-05 Architecture Implementation Pilot, Phase 5 AIP-5 Kickoff Workshop UNEP Geneva 3-4 May 2012.
AR Doug Nebert, POC-elect GEO ADC Co-Chairs Meeting,
GEOSS Architecture Implementation Pilot, Phase 2 (AIP-2)
George Percivall September 2008
AIP-5 Kick-off Workshop Summary 3-4 May 2012, UNEP, Geneva
Closing Plenary.
GEOSS Future Products Workshop March 26-28, 2013 NOAA
Air Quality Data Systems and the GEOSS Architecture
Presentation transcript:

GEOSS Task AR-09-01b Architecture Implementation Pilot Phase 6 (AIP-6) Bart De Lathouwer Open Geospatial Consortium (OGC) GEO-X Plenary, Geneva, Switzerland January 2014

Outline What are the Architecture Implementation Pilots (AIP)? What are the major outcomes of the Pilots to-date? What are the highlights of the current AIP-6 Pilot?

What are the Architecture Implementation Pilots (AIP)? GEO Task AR-09-01b Support SBAs by developing new process and infrastructure components for GCI and the broader GEOSS architecture Demonstrate and document results to inform GEOSS Development Baseline progress “fostering interoperability arrangements and common practices for GEOSS”

Information Viewpoint Computational Viewpoint Engineering Viewpoint Optimized Design/Development Technology Viewpoint Enterprise Viewpoint Community Objectives GEOSS Vision and Targets Societal Benefit Areas System of Systems/ Interoperability Abstract/Best Practices GEOSS AIP Architecture RM-ODP Viewpoints Earth Observations Geographic Features Spatial Referencing Metadata and Quality GEOSS Data-CORE Catalog/Registry Access and Order Processing Services Sensor Web User Identity Component Types Information Framework Use Cases Services Tutorials

Operational Capability Operational Capability User Needs, Scenarios User Needs, Scenarios Design, Develop, Deploy Design, Develop, Deploy ADC activities including: Architecture Implementation Pilot (AIP) Task AR-09-01b GEOSS Common Infrastructure (GCI) Task AR-09-01a support persistent implementation requirements SBA Tasks, UIC, CBC, STC A process, elaboration of GEOSS Architecture URR, Data Sharing Task Force GCI-Coordination Team Transfer to operations SIF outreach

AIP Agile Development Phases AIP-1 Kickoff: Jun 2007; Alpha operations Nov 2007; Arch Workshop Feb 2008AIP-1 –"Core" Architecture defined initial version of GCI AIP-2 Kickoff Sep 2008; demo ISRSE May 2009; Beta operations Sep 2009AIP-2 –SBA implementations of common cross-cutting architecture; Refined GCI concept supporting transition to operations AIP-3 Kickoff Mar 2010; results to Beijing Plenary; Complete Feb 2011AIP-3 –Network building in GEOSS SBA communities; Piloted Broker and Processing capabilities AIP-4 Kickoff May 2011; results to Istanbul Plenary; Complete Dec 2011AIP-4 –Increased access to priority earth observation data; via server software, tutorials and application clients AIP-5 Kickoff May 2012; results to Brazil Plenary; Complete Dec 2012AIP-5 –SBA application scenarios; Research prototypes AIP-6 “Fostering interoperability arrangements and common practices for GEOSS”

AIP-6 Master Schedule

Highlights of Activity 1 – Technical Topics

Highlights of Activity 2 – SBA

Thank you to all participants of AIP-6! AIP-7 is in the pipeline. (Come and talk to us at the AIP booth)

Un tout grand merci à:

References GEO –earthobservations.orgearthobservations.org GEO Architecture Implementation Pilot – GEOSS registries and SIF –geossregistries.infogeossregistries.info –