1.Pareto Analysis 2.Fish Diagram 3.Gantt Chart 4.PERT Diagram 5.Job/Worksite Analysis Guide.

Slides:



Advertisements
Similar presentations
WBS: Lowest level OBS: Lowest level
Advertisements

Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
Project Management and scheduling Objectives of project scheduling Network analysis Scheduling techniques.
Operations Management Session 27: Project Management.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Project Scheduling Basic Approach. projectA project is a collection of tasks that must be completed in minimum time or at minimal cost. activitiesIt is.
Project Scheduling Tools As part of CSA3040 © 2003, 2004 – Dr. Ernest Cachia.
Network Analysis and Duration Estimating Kathy S. Schwaig.
Tutorial 2 Project Management Activity Charts (PERT Charts)
Creating the Project Plan
CS3500 Software Engineering Project Management (1) In 1986 one well-known software engineer (Tom DeMarco) made the simple but important observation: “You.
Manjari Akella Pranava Nagpal B-Tech(CSE) 4 th Year.
1 PERT Chart for Nekretnine Macronet [2012.] T E = 5 T E = 11 T E = 12 T E = 14 T E = 20 T E = 19 T E = 22 T E = 23.
MGMT 483 Week 8 Scheduling.
Project Management: A Managerial Approach
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Management. Maintenance and Reliability 14 Aug 2001.
Importance of Project Schedules
Problem Solving Tools INSY 3021 Auburn University Spring 2008.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
Chapter 5 Planning. 222 Learning Objectives  Clearly define the project objective  Develop a work breakdown structure  Develop a network diagram 
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
HIT241 - TIME MANAGEMENT Introduction
Lecture Note 4 Managing Analysis and Design Activities
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
SUBJECT  Industrial facility design. GROUP MEMBERS H.Hammad Ali 11-IE-32 S.Hammad shah 11-IE-21 Hammad Hassan 11-IE-41.
Project Planning Class 7. SDLC Project Identification & Selection Project Initiation & Planning *** Analysis Logical Design Physical Design Implementation.
Project Management: A Managerial Approach
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Chapter 17 Project Tracking. Objectives Identify, develop, and use project management tools to track project progress: Schedules Gantt Charts Toll Gate.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
PERT and CPM.
PROJECT MANAGEMENT Approaches
PROJECT MANAGEMENT Approaches By- Rahul Jain. Plan your work first…..then work your plan.
PERT/CPM Chart David Nandigam 1. 2 PERT/CPM Chart Task. A project has been defined to contain the following list of activities along with their required.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Welcome to MM305 Unit 7 Seminar Dr. Bob Project Management.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
Chapter 3 Managing the Information Systems Project
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Project Scheduling Class 7.
Operations Management
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
TI 2111 Work System Design and Ergonomics 2. Problem Solving Tools.
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
Unit 2 Time Management Prepared by: Prof. Seemaah Keddar.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES SEMINAR December 2003.
CRITICAL PATH METHOD - PRECEDENCE DIAGRAMS - SANDEEP DIGAVALLI.
Managing the Information Systems Project Cont’d
Project Management.
Project Management Project Controlling
PROJECT MANAGEMENT.
Business System Development
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Work Charting Methods Topics: Pareto Chart – part 1
Project Management and scheduling
Problem Solving Tools ILGIN ACAR
PLANNING ENGINEERING AND PROJECT MANAGEMENT
PERT - The Program Evaluation and Review Technique
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Summer Training Industrial Engineering Department
Presentation transcript:

1.Pareto Analysis 2.Fish Diagram 3.Gantt Chart 4.PERT Diagram 5.Job/Worksite Analysis Guide

Pareto Diagram When is it used and what results will be obtained? Please refer to the table on next slide for the usage and benefits of a Pareto diagram. It is mainly used to prioritize matters, and because of its easiness of use, the diagram is used in a wide variety of fields.

Used to prioritize actions.(Used during phases to monitor the situation, analyze causes, and review effectiveness of an action.)  Used to identify and prioritize a problem.  Used to review the effects of an action taken.  Allows clarification of important tasks.  Allows identification of a starting point (which task to start with).  Allows projection of the effects of a measure to be taken Method UsageResult Pareto Diagram

Cause & Effect Diagram 1. What is Cause & effect Diagram ? A cause and effect diagram is “a fish-bone diagram that presents a systematic representation of the relationship between the effect (result) and affecting factors (causes).” Solving a problem in a scientific manner requires clarification of a cause and effect relationship, where the effect (e.g., the result of work) varies according to factors (e.g., facilities and machines used, method of work, workers, and materials and parts used). To obtain a good work result, we must identify the effects of various factors and develop measures to improve the result accordingly.

Cause & Effect Diagram When is it used and what results will be obtained? A cause and effect diagram is mainly used to study the cause of a certain matter. As mentioned above, the use of a cause and effect diagram allows clarification of causal relation for efficient problem solving. It is also effective in assessing measures developed and can be applied to other fields according to your needs.

 Can obtain a clear overall picture of causal relation. (A change in the cause triggers a variation in the result.) ○ Can clarify the cause and effect relationship.  Can list up all causes to identify important causes.  Can determine the direction of action (countermeasure). Method UsageResult Cause & Effect Diagram  Used when clarifying a cause and effect relationship.[Used during a phase to analyze causes.]  Used to develop countermeasures. [Used during a phase to plan countermeasures.]

8 Cause & Effect Diagram

 Gantt Charts › Useful for depicting simple projects or parts of large projects › Show start and completion dates for individual tasks  PERT Charts › PERT = Program Evaluation Review Technique › Show order of activities or dependencies between activities

T E = 5 T E = 11 T E = 12 T E = 14 T E = 20 T E = 19 T E = 22 T E = 23

12 Task. A project has been defined to contain the following list of activities along with their required times for completion: Activity No ActivityExpected completion time Dependency 1.Requirements collection5- 2.Screen design61 3.Report design71 4.Database design22,3 5.User documentation64 6.Programming54 7.Testing36 8.Installation15,7 a. Draw a PERT chart for the activities. b. Calculate the earliest expected completion time. c. Show the critical path.

a.Draw a PERT chart for the activities. Using information from the table, show the sequence of activities

b. Calculate the earliest expected completion time. 1. Using information from the table, indicate expected completion time for each activity Calculate earliest expected completion time for each activity (T E ) and the entire project. Hint: the earliest expected completion time for a given activity is determined by summing the expected completion time of this activity and the earliest expected completion time of the immediate predecessor. Rule: if two or more activities precede an activity, the one with the largest T E is used in calculation (e.g., for activity 4, we will use T E of activity 3 but not 2 since 12 > 11). T E = 5 T E = 11 T E = 12 T E = 14 T E = 20 T E = 19 T E = 22 T E = 23

T E = 5 T E = 11 T E = 12 T E = 14 T E = 20 T E = 19 T E = 22 T E = 23 c. Show the critical path. The critical path represents the shortest time, in which a project can be completed. Any activity on the critical path that is delayed in completion, delays the entire project. Activities not on the critical path contain slack time and allow the project manager some flexibility in scheduling.

1.Operation Process Chart (OPC) 2.Flow Process Chart 3.Flow Diagram

Operations Process Chart By superimposing the route sheets and the assembly chart, a chart results that gives an overview of the flow within the facility. This chart is operations process chart.

Flow Process Chart This chart uses circles for operations, arrows for transports, squares for inspections, triangles for storage, and the letter D for delays. Vertical lines connect these symbols in the sequence they are performed.

Flow Diagram It depicts the probable movement of materials in the floor plant. The movement is represented by a line in the plant drawing.