AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.

Slides:



Advertisements
Similar presentations
Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.
Advertisements

Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
1 NIU Integrated Readout Layer Kurt Francis NICADD Northern Illinois University March 19, 2014.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL “HBU” scintillator/PCB.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
AHCAL electronics. Status Module Production an Power Pulsing Mathias Reinecke AHCAL main meeting DESY, Dec. 10th, 2013.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
Mathias Reinecke CALICE week Manchester DIF development – Status and Common Approach Mathias Reinecke for the CALICE DAQ and Front-End developers.
Visit to CALICE ECAL testbeam (by Shinshu) at DESY, 16 th – 19 th October 2012 Samir Arfaoui & Erik van der Kraaij 30 th October 2012.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Mathias Reinecke EUDET Annual Meeting 2008 – NIKHEF AHCAL Power Aspects P. Göttlicher, M. Reinecke, H.-J. Wentzlaff for the AHCAL developers.
G. Eigen, Paris, Introduction The SiPM response is non-linear and depends on operating voltage (V-V bd ) and temperature  SiPMs need monitoring.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
14 jan 2010 CALICE/EUDET FEE status C. de LA TAILLE.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
CALICE/EUDET FEE status C. de LA TAILLE. 31 aug 2009 EUDET SC meeting Status of JRA3 Front End Electronics 2 ILC front-end ASICs : the ROC chips SPIROC.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
HCAL Modules -First Ideas Mathias ReineckeHCAL – MPI meetingJan Motivation 2.Mechanical Constraints 3.HCAL Base Unit (HBU) 4.Light Calibration.
11 may 2010 Performance of 2 nd generation ASICs for CALICE/EUDET C. de LA TAILLE OMEGA-LAL Orsay.
SuperB workshop SLAC, October 6, Outline Present Design Some thoughts about tile production Updated cost estimate Light yield studies of 3 mm thick.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
LED notched fibre system short HBU0 party with QMB6
Status of HBU, EBU and SM_HBU
CALICE meeting 2007 – Prague
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
HCAL task status report
Testbeam Timing Issues.
HCAL Modules -First Ideas
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
Testbeam analysis on module #1
Scintillator HCal Prototype
Presentation transcript:

AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010

Peter Göttlicher | CALICE meeting Arlington | March 12th, 2010 | Page 2 Outline > System Commissioning  Setup  First SPIROC2/system results > DESY testbeam – first step > The next generation – DESY

Peter Göttlicher | CALICE meeting Arlington | March 12th, 2010 | Page 3 HCAL Base Unit (HBU) and system setup 2 setups in operation

Peter Göttlicher | CALICE meeting Arlington | March 12th, 2010 | Page 4 Tile Assembly – HBU-II SPIROC2 area Alignment ‘Reflector Foil – HBU’ Some positions cannot be assembled (tiles do not fit in) “mechanics tiles” (cassette construction) Reflector foil: without cover (blank) still with cover Both HBUs are assembled with tiles (SPIROC2 regions)

Peter Göttlicher | CALICE meeting Arlington | March 12th, 2010 | Page 5 Single-Photon Peaks (taken with Labview DAQ) 100fF PA feedback, 50ns shaping, no ‘hold’ sent, ext. trig., SiPM at nom. bias, ~9000 entries per curve, one SPIROC2 memory cell used. VCALIB ~ LED light ampl. LED trigger rate ~32kHz.

Peter Göttlicher | CALICE meeting Arlington | March 12th, 2010 | Page 6 HBU hold scan (preliminary) 25ns shaping 50ns shaping > External Hold implemented, LED system as signal source. > SPIROC2 preampl: 100fF feedback. All channel triggers enabled. > amplitude-dependent maximum? Has to be checked with more channels. 160ns is large … Parameters of this measurement: ? Result fits quite well to a measurement in SPIROC2 manual

Peter Göttlicher | CALICE meeting Arlington | March 12th, 2010 | Page 7 HBU - Single Pixel distances for 51 channels > Large spread in gain, but spread also in ITEP SiPM information. HBU measurement ITEP SiPM information blue dots: used for this HBU-II (SiPMs of similar Bias-V grouped together)

Peter Göttlicher | CALICE meeting Arlington | March 12th, 2010 | Page 8 DESY testbeam (HBUII) > First module has arrived at DESY testbeam. Operation still with Labview-USB DAQ. > Still a few Control-Software functions needed (e.g. automatic HOLD Scan) DIF with CALIB and POWER HBU-II in Cassette

Peter Göttlicher | CALICE meeting Arlington | March 12th, 2010 | Page 9 The Next Generation - Reminder Mechanical concept: K. Gadow Not in scale!

Peter Göttlicher | CALICE meeting Arlington | March 12th, 2010 | Page 10 The Next Generation - Reminder Sector Connecting Plate Cassette (=slab) HBU SPIROC Central Interface Board with DIF, CALIB and POWER Not in scale!!

Peter Göttlicher | CALICE meeting Arlington | March 12th, 2010 | Page 11 AHCAL Cross Section - Update Endface electronics fulfils W-HCAL height requirements!

Peter Göttlicher | CALICE meeting Arlington | March 12th, 2010 | Page 12 AHCAL Endface – Detailed View > Board Dimensions fixed. > Redesigns about to start.

Peter Göttlicher | CALICE meeting Arlington | March 12th, 2010 | Page 13 Redesign Status: Block Diagram Level (here: CALIB2) Design: M. Zeribi

Peter Göttlicher | CALICE meeting Arlington | March 12th, 2010 | Page 14 EUDET Tiles – Dimensions for HBU Redesign Measurements of many tiles should give dimensions used in HBU design. Measurements underway, results eagerly awaited for redesign of HBU! Thanks to ITEP for all the electrical SiPM parameter information!!

Peter Göttlicher | CALICE meeting Arlington | March 12th, 2010 | Page 15 Redesigns (A lot of work ahead…) > HBU1 (HCAL Base Unit) – Detector Module  Contains 4 ASICs of new SPIROC2a/b (just ordered by LAL) generation. > CALIB2 – Light Calibration System  based on ARM7/9 microcontroller > POWER2 – Front-end detector power supply module  Enables ILC power-pulsing > AHCAL DIF  Replacement of commercial FPGA board > CIB (Central Interface Board)  Motherboard for CALIB2, POWER2 and AHCAL DIF > SIB (Side Interface Board  To be done later (not needed for slab/tower setup) > Other calorimeter types  Scintillator strip ECAL, direct coupling of scintillator to SiPM

Peter Göttlicher | CALICE meeting Arlington | March 12th, 2010 | Page 16 Conclusions and Outlook > AHCAL prototype in full operation! 2 setups realized for different tests. > USB/Labview DAQ used so far. CALICE DAQ integration, when..? > First module now in DESY electron-testbeam. > LED system works in principle. Compensate LED spread by calibration runs at 5 different VCALIBs. Analyze pedestal shift (20 ADC counts for 5V change on VCALIB) > Redesigns of boards and new SPIROC2a/b generation ahead. > Power cycling: to be tested (urgently, before redesigns). > Suitability of HBU concept for ScECAL under investigation.  open points: mechanical interface to DAQ, cassette construction > A lot of system’s and SPIROC analogue and digital tests ahead.