High Level Process Mapping

Slides:



Advertisements
Similar presentations
You are about to be presented with 10 questions Each question has 4 answers You have the time it takes for the running man to cross the screen to decide.
Advertisements

Quality Planning Tools PMI Westchester Quality SIG Pawan Kumar, Quality SIG Member, PMP November 2007.
Types of Data This module was developed by Business Process Improvement. For more modules, please contact us at or visit our website
Software Failure: Reasons Incorrect, missing, impossible requirements * Requirement validation. Incorrect specification * Specification verification. Faulty.
HACCP Manager Software™
3/5/2009Computer systems1 Analyzing System Using Data Dictionaries Computer System: 1. Data Dictionary 2. Data Dictionary Categories 3. Creating Data Dictionary.
Presented By The University of Texas-School of Public Health
Six Sigma Foundations Continuous Improvement Training
The Production Process
Pg 1 Why Learn About SIPOC And Process Maps? Document actual high level process Clarify customers, suppliers, inputs, and outputs Communicate information.
Does Anyone Remember Lawn Darts?. Yet Another Picture of Lawn Darts.
CSUN Engineering Management Six Sigma Quality Engineering Week 4 Measure Phase.
CS107 Introduction to Computer Science Lecture 5, 6 An Introduction to Algorithms: List variables.
The Quality Improvement Model
Six Sigma Quality Engineering
3-1 Select Measures Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process Capable ? Improve Process Capability.
SOFTWARE PROJECT MANAGEMENT Project Quality Management Dr. Ahmet TÜMAY, PMP.
Digital Data Management For Coating Inspection Tasks On Steel Structures Presented by: Joe Walker, Elcometer.
DMAIC DefineMeasureAnalyzeImproveControl D Define M Measure A Analyze I Improve C Control Implementing Six Sigma Quality at Better Body Manufacturing.
The Quality Improvement Model
Detailed Process Analysis Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training Six Sigma Simplicity.
Process Mapping.
DATE: 28/11/2012 INSTRUCTOR: HANIF ULLAH Tutorial 7.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Sw development1 Software Development 1.Define the problem (Analysis) 2.Plan the solution 3.Code 4.Test and debug 5.Maintain and Document.
Workers Comp Help Desk. The Workers Comp Help Desk is designed to provide the highest level of convenience and support for Industrial Carrier Professionals.
1 AATC, Inc W. Catalina Dr. Phoenix, AZ USA AATC PRESENTATION – INVESTMENT CASTING PROCESS (2 OF 3 – PRESENTATIONS – REVISION.
1 Operations Management Lesson 6 Material Requirements Planning and Enterprise Resource Planning.
What is Software Engineering? the application of a systematic, disciplined, quantifiable approach to the development, operation, and maintenance of software”
Deployment & Available-to-promise (ATP) in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Independent Demand Inventory Management
WASTE Process Improvement Consulting.
Value Stream Mapping Quick Start. 2Employ Improvement Initiatives A series of steps that must be performed in the proper sequence to create value for.
Capability Assessment Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training Six Sigma Simplicity.
Process Walk & SIPOC Define Kaizen Facilitation. Objectives Understand the process as a “system” Describe the concept of an entity and how it relates.
This material is approved for public release. Distribution is limited by the Software Engineering Institute to attendees. Sponsored by the U.S. Department.
Developing an Algorithm
1 The Importance of Cost Control OH 1-1.
PSPC/Coating Technical File (CTF)
Project Storyboard (Page 1 of 2)
2-1 Define Process The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process.
What is a DOE? Design of Experiment Adapted from experiments.cfm#preparation.
Joan Burtner Department of Mechanical and Industrial Engineering
Software Engineering1  Verification: The software should conform to its specification  Validation: The software should do what the user really requires.
Software Quality Assurance SOFTWARE DEFECT. Defect Repair Defect Repair is a process of repairing the defective part or replacing it, as needed. For example,
Automotive Heating and Air Conditioning CHAPTER Automotive Heating and Air Conditioning, 7e James D. Halderman | Tom Birch SEVENTH EDITION Copyright ©
Software Quality assurance SQA – SWE 333
CSC 480 Software Engineering PSP Project 1 August 20, 2004.
Supplier Up to Schedule Plan  Supplier receives releases from Lear on a weekly basis via EDI or Fax.  If the supplier does not receive a release on a.
To Be Binomial or NOT to be BINOMIAL? AP Statistics Mr. Towns Fenger High School.
METODOLOGI SIX SIGMA PERTEMUAN 11 ANALYZE PHASE OLEH: EMELIA SARI.
8.1 Plan Quality Management
Coating Defects and Failures
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
How to Implement an IG Manufacturing Quality Procedure System
Stream Agent Training March 2014.
Calibration Web Innovations 2017.
Sprayers Ride-On-Sprayers Tank Sprayers
OPS/571 Operations Management
Introduction to Materials Management
Framework for Success: DMAIC
Application of Failure Mode and Effect Analysis to the Powder Coat Process Dr. Joan Burtner Chair, Department of Industrial Engineering and Industrial.
Schedule an Inspection
Steps for product/material nonconformance:
Implementing Six Sigma Quality
Software metrics.
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Company X Process Mapping Training
Standard Operating Procedure
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Presentation transcript:

High Level Process Mapping Measure I/O Map © 2014 Ports America. All rights reserved.

Objectives Describe major process steps of a project Develop a comprehensive list of inputs and outputs required for each step Classify input variables as S, C, or N in the determination of controllable or noise factors © 2014 Ports America. All rights reserved.

Remember SIPOC? I/O Mapping takes a deeper dive in the middle section of the SIPOC The I/O Map helps team analyze and classify process inputs and outputs Inputs (X’s) and Outputs (Y’s) are the main emphasis

Definitions I = Input P = Process Materials, resources and data required to execute your process P = Process Series of steps or activities that uses one or more kinds of inputs and changes them into an output that is of value to the customer O = Output Tangible products or services that result from the process and the metrics

Steps for Performing I/O Mapping Identify all steps in the process List key output variables at each step List key input variables and classify process inputs as controllable or uncontrollable

1. Identify the Process Steps Start with the process steps that defines the start of your process and end of your process Include all value-added and non value-added steps Keep it simple: 4-6 step is ideal, 8-12 maximum Process steps are actions, use verbs!

2. Determine the Outputs For Each Step Identify what the process step “produces” Two types of outputs: Process Deliverables: the actual output of the process Business Measures: consequence of running the process; i.e., quality, delivery, or cost/productivity related Outputs should be: Measurable: use “bolt length”, not “correct bolts” or “bolt length on target” Specific, not general: use “operator experience” or “analyst typing speed”, not just “operator” or “analyst”

3. Determine the Inputs For Each Step Identify what is put into the process step Inputs should be specific, like outputs Inputs generally fall into the ‘6 M’ categories (Man, Machine, Materials, Mother Nature, Measurement, and Methods) Outputs from one step may become an Input to another Classify the Inputs as (S), (C) or (N) (S) Standard Operating Procedure (C) Controllable (N) Noise or Uncontrolled

Classification Types Defined (S) Standardized inputs: Input variables under operating Procedure/ Policy or a detailed work instruction for running that process step (C) Controllable inputs: Key X’s that are actively controlled and that can be changed to see the effect on the output (Y) (N) Noise inputs: Input variables (X’s) that impact the output variables (Y’s) but are difficult, impossible or we choose not to control. i.e. – Environmental variables such as humidity or temperature

Discussion “Baking a Cake”: Identify inputs; classify as S, C, or N I ____________________________________ Prepare __________________ ____________________________________ Cook __________________ ____________________________________ Serve __________________

Operations Example Surface Prep Prime Paint Dry Outputs Clean surface Make minor repairs Sand surface Clean Surface Inspect Prime Adjust air pressure Load primer Record primer lot Prime surface Paint Check nozzle type Inspect surface Record paint lot Paint surface Dry Set oven profile Rework Outputs Clean surface Surface finish Prep time Defect / repair count Air pressure Complete coverage Prime time Primer lot Primer thickness Paint time Paint lot Paint thickness Dry paint Dry time Paint hardness Inputs Type Surface contamination Surface roughness Chassis type Sanding grit Filler lot Sander RPM Nozzle type Primer age Ambient temp Relative humidity N C Paint age Paint viscosity Oven profile Thermocouple calibration

Non-Ops Example Cross reference for P/N’s Order information Plant loading information Order worksheet form Pricing algorithm Information from customer Greeting script Answering procedure Telephone system Type Outputs Answer Phone Greet customer Determine P/N Identify need date Identify ship to address Identify ship method Enter Order Information Input information Print order confirmation Determine ship date Review order Confirm Order FAX confirmation to customer Verify manufacturing receipt of order Inputs Order worksheet Computer entry screens Lead time information from mfg Shipment method Printed confirmation sheet Production schedule Customer contact info Production contact info Confirmation procedure N C Prompt answer Live body Part number Availability Need date Get Internal Information Get internal P/N Determine terms Identify lead time Complete order worksheet S Customer number Pricing Order in computer Correct info Promise date Order number Printed confirmation Time to Enter Order confirmation to customer Order to production

Exercise: I/O Process Mapping Consider the process of making a great cup of ‘Cappuccino’ … With your team, create an I/O Process Map Identify all steps in the process List key output variables at each step List key input variables Classify process inputs as controllable or uncontrollable

Review Describe major process steps of a project Develop a comprehensive list of inputs and outputs required for each step Classify input variables as S, C, or N in the determination of controllable or noise factors