DAQ Status Report GlueX Collaboration – Jan. 29-31, 2009 – Jefferson Lab David Abbott (In lieu of Graham) GlueX Collaboration Meeting - Jan 2009 - Jefferson.

Slides:



Advertisements
Similar presentations
Trigger & DAQ Ole Hansen SBS Collaboration Meeting 19 March 2010.
Advertisements

GlueX Collaboration Meeting June 3-5, GeV Trigger Electronics R. Chris Cuevas 1.Hardware Status  Production Updates 2.DAq and Trigger Testing 
GlueX Collaboration Meeting October 2-4, 2014 Trigger System Update R. Chris Cuevas Trigger Hardware/Firmware Status  Hardware Status  Performance Test.
GlueX Collaboration Meeting May 12-14, GeV Trigger Electronics R. Chris Cuevas Trigger Hardware/Firmware Status  Global Trigger  Installation.
12 GeV Trigger Workshop Session II - DAQ System July 8th, 2009 – Christopher Newport Univ. David Abbott.
Timm M. Steinbeck - Kirchhoff Institute of Physics - University Heidelberg - DPG 2005 – HK New Test Results for the ALICE High Level Trigger.
Data Acquisition Graham Heyes May 20th Outline Online organization - who is responsible for what. Resources - staffing, support group budget and.
Plans for EPICS in Hall D at Jefferson Lab Elliott Wolin EPICS Collaboration Meeting Vancouver, BC 30-Apr-2009.
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
Feb. 19, 2015 David Lawrence JLab Counting House Operations.
May. 11, 2015 David Lawrence JLab Counting House Operations.
Emlyn Corrin, DPNC, University of Geneva EUDAQ Status of the EUDET JRA1 DAQ software Emlyn Corrin, University of Geneva 1.
Hall D Trigger and Data Rates Elliott Wolin Hall D Electronics Review Jefferson Lab 23-Jul-2003.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
Online Data Challenges David Lawrence, JLab Feb. 20, /20/14Online Data Challenges.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
Artdaq Introduction artdaq is a toolkit for creating the event building and filtering portions of a DAQ. A set of ready-to-use components along with hooks.
GlueX Collaboration Meeting February , GeV Trigger Electronics R. Chris Cuevas Hardware Status ( A top down view,, )  Global Trigger Processing.
Boosting Event Building Performance Using Infiniband FDR for CMS Upgrade Andrew Forrest – CERN (PH/CMD) Technology and Instrumentation in Particle Physics.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
DAQ Status Graham. EMU / EB status EMU framework prototype is complete. Prototype read, process and send modules are complete. XML configuration mechanism.
LECC2003 AmsterdamMatthias Müller A RobIn Prototype for a PCI-Bus based Atlas Readout-System B. Gorini, M. Joos, J. Petersen (CERN, Geneva) A. Kugel, R.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
CODA Users Workshop (Data Acquisition at Jefferson Lab) By David Abbott.
David Abbott CODA3 - DAQ and Electronics Development for the 12 GeV Upgrade.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
DAQ Issues for the 12 GeV Upgrade CODA 3. A Modest Proposal…  Replace aging technologies  Run Control  Tcl-Based DAQ components  mSQL  Hall D Requirements.
Data Acquisition for the 12 GeV Upgrade CODA 3. The good news…  There is a group dedicated to development and support of data acquisition at Jefferson.
Solid SIDIS DAQ Solid collaboration meeting June 2 nd /3 rd 2011 Alexandre Camsonne.
L3 DAQ the past, the present, and your future Doug Chapin for the L3DAQ group DAQ Shifters Meeting 26 Mar 2002.
David Abbott - JLAB DAQ group Embedded-Linux Readout Controllers (Hardware Evaluation)
1 Trigger and DAQ for SoLID SIDIS Programs Yi Qiang Jefferson Lab for SoLID-SIDIS Collaboration Meeting 3/25/2011.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Update on the CDC GlueX Collaboration Meeting October 2006.
7. CBM collaboration meetingXDAQ evaluation - J.Adamczewski1.
Data Acquisition Backbone Core J. Adamczewski-Musch, N. Kurz, S. Linev GSI, Experiment Electronics, Data processing group.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
Online monitoring and filtering Graham July 2009 Graham July 2009.
David Abbott - Jefferson Lab DAQ group Data Acquisition Development at JLAB.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
Hall-D/GlueX Software Status 12 GeV Software Review III February 11[?], 2015 Mark Ito.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
News on GEM Readout with the SRS, DATE & AMORE
2003 Conference for Computing in High Energy and Nuclear Physics La Jolla, California Giovanna Lehmann - CERN EP/ATD The DataFlow of the ATLAS Trigger.
TeV BLM Review 4/19/041 Tevatron BLM Review - Schedule BLM Replacement Prototype schedule: Provide prototype digitizer cards, crate, readout path by ~
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
CODA Graham Heyes Computer Center Director Data Acquisition Support group leader.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Hall–D Level-1 Trigger Commissioning Part II A.Somov, H.Dong Jefferson Lab 12 GeV Trigger Workshop, July 8, 2010  Play Back Test Vector in Hall-D commissioning.
Event Management. EMU Graham Heyes April Overview Background Requirements Solution Status.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
LECC2004 BostonMatthias Müller The final design of the ATLAS Trigger/DAQ Readout-Buffer Input (ROBIN) Device B. Gorini, M. Joos, J. Petersen, S. Stancu,
COMPASS DAQ Upgrade I.Konorov, A.Mann, S.Paul TU Munich M.Finger, V.Jary, T.Liska Technical University Prague April PANDA DAQ/FEE WS Игорь.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
David Lawrence JLab May 11, /11/101Reconstruction Framework -- GlueX Collab. meeting -- D. Lawrence.
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. Off-the-Shelf Hardware and Software DAQ Performance.
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
Example of DAQ Trigger issues for the SoLID experiment
Hall D Trigger and Data Rates
Tracker Software Status
The only thing worse than an experiment you can’t control is an experiment you can. May 6, 2019 V. Gyurjyan CHEP2007.
Presentation transcript:

DAQ Status Report GlueX Collaboration – Jan , 2009 – Jefferson Lab David Abbott (In lieu of Graham) GlueX Collaboration Meeting - Jan Jefferson Lab

Introduction Projects Hardware/Electronics Front end Back end - Event builder, EMU, etc… Experiment Control and messaging Administrative news etc… GlueX Collaboration Meeting - Jan Jefferson Lab

Hardware/Electronics Reported on elsewhere Highlights: TI Prototype testing – proof of trigger/clock distribution design principle Final TI (v3 this year) will be used with existing experimental program (2.6) as well as support 3.0 DAQ readout. Trigger supervisor has preliminary design but main work not started yet (Note: 128 crate limit) PCI Based TI board - Available with software library support FADC tirgger/readout at 160 KHz. Both FADC, F1TDC revision 2 designs are underway. GlueX Collaboration Meeting - Jan Jefferson Lab

Front end Becoming clear that Intel/Linux is viable for CODA front end. Main effort is rewriting the PPC/VxWorks drivers to for Intel/linux. Currently have a CODA 2.6 ROC running on Linux with VME TI and PCI TI based readout. Can use 6 GeV program and development setups for a “testbed”. Beginning on framework of the CODA 3 ROC and how it communicates with Run Control and Back end (EMU). Increased data rate requirement (3 GB/s) should not be a showstopper. GlueX Collaboration Meeting - Jan Jefferson Lab

Front End System FADCF1TDC CPU - GE 7865 Intel Core 2 Duo (2.1GHz) Dual GigE TI (ver 3) CODA 2 & 3 support SD Clock/Trigger Distribution CTP L1 Trigger (optional) VXS Crate 110 MB/s off the CPU on a single GigE link uses only 6% of a single CPU and minimal jitter on front-end response. Linux on the Front End

Back End Prototype parallel EB using EMU framework. Prototype parallel Event Recorder using EMU. EMU control and monitoring now uses cMsg. interface to Run Control (AFECS) started. Start to convert prototypes into something that can be used in a real experiment. Event format decoding/encoding (EVIO). True event building. Look at viable DAQ architectures for staged/parallel event building and future L3 farm. GlueX Collaboration Meeting - Jan Jefferson Lab

Event Format Event recorder (EMU) Has to decode event blocks from EB. has to write data files in EVIO format. Event Builder (EMU) must be able to decode events coming from ROCS or other stages of EB. Must be able to encode headers for full/partial events. GlueX Collaboration Meeting - Jan Jefferson Lab

DATA BLOCK GlueX Collaboration Meeting - Jan Jefferson Lab CODA Event I/O ROC RAW DATA

GLUEX DAQ ACHITECTURE OPTIONS GlueX Collaboration Meeting - Jan Jefferson Lab

Experiment Control AFECS - Java based framework for designing and implementing hierarchical, distributed control systems with intelligent agents. Replaces classic Run Control in CODA 2.6 AFECS now uses cMsg for all internal communication (No JADE left). New “plug-in” support for agent component communication (including EPICS-CA and SNMP). Standardizing component data format for monitoring/display GlueX Collaboration Meeting - Jan Jefferson Lab

AFECS Run Control

Wiener Crate Control/Monitoring DAQ component cMsg browser GlueX Collaboration Meeting - Jan Jefferson Lab

Messaging cMsg now mature and being actively used (AFECS, CODA 2.6, Codalite). Version 3.0 released. Internal changes - Bugs being found and fixed More robust handling of lost connections New “payload” support EMU using cMsg for control, monitoring and message logging. GlueX Collaboration Meeting - Jan Jefferson Lab

The good and the bad CODA version 3 is now a BIA Activity: CODA now “critical” to lab operations. More work than people. Downside - Much more paperwork. Upside - Some of the paperwork is actually useful! Have a budget that includes funding to increase DAQ staff – by two scientists. We finally got approval to hire one!! GlueX Collaboration Meeting - Jan Jefferson Lab

The ugly Despite BIA status and full funding lab level management is not approving posting of new positions (“replacements” only). Without extra help projects are slipping relative to the current baseline. Should be further along on several projects, but dealing with 6 GeV operation issues and increasing administrative responsibilities have slowed progress. GlueX Collaboration Meeting - Jan Jefferson Lab

Summary DAQ group is hiring!! BIA funding is a good thing. More formal project management is good. All projects ARE progressing… Those that do not depend on new hires progressing well. Not yet exhausted the “wiggle room” in the schedule Interest outside the lab in CODA related projects could provide additional support/development. E906 experiment at Fermilab plan to use CODA PANDA, NuSTAR, CBM interest in AFECS as control system GlueX Collaboration Meeting - Jan Jefferson Lab