AASHTOWare BRIDGEWare Satisfaction Survey Results FY 2010 Wendy L. Gagnier, P.E. BRIDGEWare Project Manager.

Slides:



Advertisements
Similar presentations
MAIN COMMITTEE OFFICERS DUTIES AND RESPONSIBILITIES.
Advertisements

Structural Design Program Review Massachusetts Department of Transportation September 20-23, 2011.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
AASHTO’s Cooperative Software Development Program Trnsport User Group Meeting October 22 – 26, 2006 Portland, Maine Trnsport User Group Trnsport Task Force.
Virtis/Opis 1. Financial & Administrative Overview 2. Customer Satisfaction Survey Virtis/Opis User Group Helena, Montana August 2 – 3, 2011 Virtis/Opis.
AASHTOWare  - Transportation Software Solutions Contents Participants Follow-up Purpose Introduction Results Trnsport 2004 Customer Satisfaction Survey.
Virtis-Opis Update Virtis-Opis User Group Training Meeting Helena – August 2011.
AASHTOWare Program Benefits Standing Committee on Highways October 18, 2013 Tom Cole, Idaho DOT AASHTO Special Committee on Joint Development.
Usability Process for eBP at Intel Eric Townsend, Intel.
AASHTO’s Cooperative Software Development Program Trnsport User Group Meeting October 6 – 10, 2007 St. Louis, Missouri Trnsport User Group Trnsport Task.
Bridge Design-Rating 2013 Administrative Overview Bridge Design-Rating User Group Meeting Virginia Beach, VA.
Bridge Design-Rating 2014 Administrative Overview RADBUG Meeting Traverse City, MI Judy B. Skeen, P.E.
TUG, AASHTO, TTF Primer Class Tim Lindberg (TTF Member from South Carolina) October 6, 2007.
TUG, AASHTO, TTF Primer Class Tim Lindberg (TTF Member from South Carolina) November 6, 2005.
Working with Info Tech, Inc. Teresa Franklin Trnsport Product Manager November 6, 2005 A Primer for Trnsport Users.
1 Public Outreach October 2008 By Adelina Murtezaj – Public Relation Officer For Inaugural Partnership Activity between ICC and ERO.
Value Engineering at FHWA
AASHTO’s Cooperative Software Development Program AASHTOWare ® Transportation Software Solutions Trnsport User Group Meeting October 2004 Mobile, Alabama.
GTRInewFormat.ppt-1 Electronic Systems Laboratory TMC Operator Requirements and Position Descriptions, Phase 2, Kickoff Meeting Presented by Dennis J.
User Group Priorities for Development. Assumptions ER system still remains in place –Capture individual user input –Repository of good ideas that will.
Firstname Lastname, Job Title CGE SURVEY RESULTS ON DIFFICULTIES, CHALLENGES AND PROBLEMS ENCOUNTERED BY NON-ANNEX I PARTIES IN USING THE GUIDELINES IN.
NASA Earth Observing System Data and Information Systems
United Nations Counter-Terrorism Committee Executive Directorate (CTED) Revised documents and procedures for assessing Member States’ implementation efforts.
ACSP Report – Review of Open Suggestions Nate Davis.
Comprehensive Review of the Public Safety Communications Center Phase 2 Report County of Dane, WI February 12, 2009.
AASHTO and the Highway Safety Manual (HSM) A Strategic Approach to Implementation Priscilla Tobias, PE State Safety Engineer Illinois Department of Transportation.
A Few Quick Items from AASHTO June 2006 Jim McDonnell, PE Associate Program Director, Engineering.
MyFloridaMarketPlace Roundtable January 21, :00 a.m. – 12:00 p.m. MyFloridaMarketPlace.
AASHTOWare Program Overview to the Safety Data Systems Task Group of the Safety Management Subcommittee Presented by Tony Bianchi, Project Manager AASHTO.
August 7, Market Participant Survey Action Plan Dale Goodman Director, Market Services.
National Information Exchange Model Update for the Global Advisory Committee Spring 2008 Meeting April 10, 2008 NIEM Technical Architecture Committee (NTAC)
TUG Chair Report Report for the Fiscal Year of 1999.
Implementation Overview SHRP 2 Oversight Committee June 18, 2012.
First 5 LA Phase III Website Strategic Plan Presentation to Public Affairs Committee July 13, 2006.
A SSET M ANAGEMENT Northeast Bridge Management Peer Exchange (BMPE) April 26, 2011 Manchester, NH Bridge Management Questionnaire Report Wade F. Casey,
MPARWG Business & Disposition of Action Items from MPARWG October 2009 H. K. (Rama) Ramapriyan NASA/GSFC Metrics Planning and Reporting (MPAR) WG 9 th.
Bridge Design Implementation Jeff Olsen, PE – MT DOT AASHTOWare Bridge Task Force
Role of Account Management at ERCOT 2005 Meeting Management Support Survey Review For 2006 Subcommittees.
Using Client Satisfaction Surveys as a Quality Improvement Tool.
Beckie Curtis, Michigan DOT Virtis/Opis Issue Process.
Inspection and Review The main objective of an Inspection or a Review is to Detect Defects. (Today -there may be some other goals or broader definition.
User Interface Improvements AASHTOWare Bridge Design/Rating User Group Training Meeting Virginia Beach – August 2013.
VIVO is funded by member institutions. Visit our web site to find out more about becoming a member. vivoweb.org “ VIVO Roadmap Jim Blake, Mike Conlon,
Elections Task Force As requested by the Board of Supervisors, staff has conducted an evaluation of the election process with specific focus on identifying.
DEWG Meeting Summary Report to COPS 08/14/2007 Jim Galvin- Luminant Energy.
OMB Circular A-16 Supplemental Guidance (Endorsed) Ivan DeLoatch, Staff Director Lew Sanford Jr. & Wendy Blake-Coleman NGAC Meeting, February 4, 2009.
NSF’s Higher Education R&D Survey Update Ronda Britt 2012 NCURA Annual Meeting November 6, 2012 National Science Foundation National Center for Science.
Copyright 2010, The World Bank Group. All Rights Reserved. Planning a Statistical Project Section B 1.
Unit 8: Implementation, Part II Seminar Wednesday pm ET.
National Cooperative Highway Research Program Andrew C. Lemer, SPO 1 NCHRP Project 20-68A/B/C U.S. Domestic Scan Program AASHTO Research Advisory Committee.
VIVA 19 TH ANNUAL USERS GROUP MEETING: OER/LICENSED RESOURCES TASK FORCE HIGHLIGHTS October 22, 2015 Virginia Library Association Richmond, VA.
Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design June 5, 2013.
GOT 2003 Customer Satisfaction Survey: Results Summary Office of Policy & Customer Relations September 4, 2003.
Dennis M. O’Shea Delaware DOT Pontis Users Group Meeting September 5, 2007 Portland, Maine Task Force Update.
AASHTO’s Cooperative Software Development Program AASHTOWare ® Transportation Software Solutions Trnsport User Group Meeting November 6 – 9, 2005 Daytona.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Tools Report Engineering Node August 2007
SAFETYANALYST Integrates and automates the transportation safety planning and management Software analysis tools to assist highway agencies to implement.
First 5 LA Phase III Website Strategic Plan
Commercial Operations Sub-Committee Update to TAC
NCWG Terms of Reference NCWG April 2016, IHB, Monaco
NASPCC 2017/2018 WorkPlan Status Report
Implementing the Transportation/Land Use Connection Program
TPF-5(181) Research Management Database Business Analysis
WELCOME TO THE WEBINAR This Webinar is being presented from a computer with a resolution of 1280 X Using a similar setting on your machine may improve.
Inspection and Review The main objective of an Inspection or a Review is to detect defects. (Not for Giving Alternative Solutions) This activity and procedure.
Independent Expert Program Review (IEPR)
Supporting SEACs across the Province:
Update on AASHTO’s Comments Jim McDonnell, P.E. AASHTO
AASHTOWare Bridge Task Force
Presentation transcript:

AASHTOWare BRIDGEWare Satisfaction Survey Results FY 2010 Wendy L. Gagnier, P.E. BRIDGEWare Project Manager

BRIDGEWare Task Force Members Virtis/Opis Tim Armbrecht – IL DOT & BW Chair Dean Teal – KS DOT Rebecca Curtis – MI DOT Bryan Silvis – VA DOT Vacancy - Tom Saad – FHWA & Virtis/Opis Liaison Pontis Mike Johnson – Caltrans & Vice-Chair Paul Jensen – MT DOT Francois Ghanem – NYS DOT Scot Becker – WI DOS Wade Casey – FHWA & Pontis Liaison Wendy Gagnier, P.E. - AASHTO BRIDGEWare Project Manager

Background The AASHTOWare Annual Strategic Plan Requires Each Product to Conduct a User/Customer Satisfaction Survey – To Promote and Improve Customer Satisfaction – To Establish Issues of Importance to Product Users, and – To Establish How to Measure Issues for Prioritization and Incorporation

Background Two Surveys Were Issued in FY 2010 for BRIDGEWare Products – One to Member Agencies – One to Consultants and Non-Member Agencies Difference in Content of Survey Topics – Survey for Consultants and Non-Member Agencies Did Not Include Questions on Interaction With BRIDGEWare Task Force

Background The FY2010 Survey Was Issued on January 08, 2010 All Results Were Received by January 25, 2010 – Member Agencies = 52 Respondents – Consultants and Non-Member Agencies = 31 Respondents

Survey’s Formats Questions Were Asked in the Following Areas: – Satisfaction With the Products – Satisfaction With the Contractor – Satisfaction With the Product Documentation – Satisfaction With the BRIDGEWare Task Force

Survey Results The Surveys Were Reviewed and Analyzed Pivotal Questions Were Extracted and Used in the Executive Summaries to Provide an Overall Look at the Response to the Main Topics

Survey Results Overall Satisfaction With the BW Products – Member Agencies Response – Consultants/Non-Member Agencies Response

Survey Results Ranking of Contractor Support for Products – Member Agencies Response – Consultants/Non-Member Agencies Response

Survey Results Would the Users Confidently Recommend BW Products to Others – Member Agencies Response – Consultants/Non-Member Agencies Response

Survey Results Does the Task Force Understand the Service Needs of the Agency/Organization – Member Agencies Response – Consultants/Non-Member Agencies Response  NA

Additional Comments Some of the Questions Provided an Opportunity for the Respondent to Offer Additional Comments The Task Force Has Reviewed These Comments In an Effort to Effectively Provide Reponses, They Have Grouped the Comments Based on a Topic Area

Additional Comments Virtis/Opis Help Manual, Tutorial or Documentation and General Program Usability: “The Task Force is to include a dedicated user manual as an option for user prioritization during extensive enhancement voting. Additionally, the Task Force will compile the existing tutorials and highlight what is currently available at the upcoming User Group Meeting.”

Additional Comments Task Force Not Responsive to V/O User Group Requests: “The Task Force recently distributed a detailed explanation of the user requested enhancements that have been added to the current work plan. A long term plan identifying a schedule for significant program enhancements will be presented at the User Group Meeting. Additionally, the Task Force will allow for the users to vote on extensive enhancements (part of strategy for a long term plan) separately from minor enhancements (added to each release).”

Additional Comments Task Force Communication Issues : “The V/O Task Force takes user communication issues seriously, and has recently increased its efforts in this area. Specifically, meeting minutes for all Task Force meetings are sent to the User Group officers for distribution to the user groups. The Task Force also recently distributed a detailed explanation of the user requested enhancements that have been added to the current work plan. Additionally, a long term plan identifying a schedule for significant program enhancements will be presented at the User Group Meeting.”

Additional Comments Structural Accuracy and Bugs With the Virtis/Opis Products: “The Task Force has set aside a funding source in the work plan in order to get the AASHTO Design Specifications and MBE updates into the program during the same year. The Task Force has also undertaken the task to clarify the bug policy that will clarify which issues are bugs, which are maintenance items and which are enhancements. This bug policy will require additional communication between the contractor and the users regarding any bugs found in current versions of the software. Finally, bug resolution has been included in the performance goals for the products set by the Task Force and enforced by SCOJD.”

Additional Comments Products’ Output and Reporting: “A tutorial will be developed for locating and interpreting output.”

Additional Comments Product Enhancements: “The Task Force has developed a long term plan to incorporate the extensive user requested enhancements. This plan will be presented to the users at the User Group Meeting.”

Additional Comments Opis as a Design Tool: “Improving Opis as a design tool has been added to the long term plan.”

Questions?