How is Utah’s Operations Management System (OMS) really working? 2010 WASHTO COMMITTEE ON MAINTENANCE.

Slides:



Advertisements
Similar presentations
1 AASHTO - FHWA Peer Exchange on Asset Management and Performance Management July 26-27, 2010.
Advertisements

FacilityMAX General Services Department A Joint Project of the Building Services and Property Control Divisions Presented to: DoIT Project Oversight Committee.
Winter Operations Overview Maryland Transportation Commission January 7, 2015 Russ Yurek, Director Office of Maintenance (410)
Chapter 15: Packaged Software and Enterprise Resource Planning
Kronos Overview Go-Live Date June 17, Why are we implementing Kronos? Current Process: – Sign in / out on paper – Fill out AU-15 turn into supervisor.
May 2014 Operations Planning Construction Design VISION Process 1.Receive design files from Projectwise -Create Maps to determine ownership and maintenance.
New York State Department of Labor Consolidated Funding Application Worker Skills Upgrading Request for Proposals 1.
LMS RFP (LEARNING MANAGEMENT SYSTEM) The LMS Research Team Center for Instructional Technology December, 2011.
MDOT’ Maintenance Management System Southeast Regional Maintenance Conference Biloxi MS Ken Hauser - MDOT.
Managing Non-Traditional Asset Classes Managing Non-Traditional Asset Classes SHA’s Perspective Maryland Department of Transportation State Highway Administration.
Online Reading Lists at Loughborough University Gary Brewerton, Library Systems Manager.
Panorama Consulting Group LLC ERP Assessment, Selection, and Planning SAMPLE APPROACH.
Ed Gray, PE Public Service Electric and Gas
Costs P6. Costs An important part of an e-commerce strategy is identifying the costs. Whether they are specific prices or just isolating where the business.
Workforce Management System presented by Crystal Woods, Human Resources Division Head Arkansas State Highway and Transportation Department.
© Copyright High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection July 14, 2014 prepared by: Brian Savoie Vice President HIGH.
GSA Office of Motor Vehicle Management Overview
1 U.S. Coast Guard Headquarters Office of Contract Support FULL SPEED AHEAD TO PERFORMANCE BASED SERVICES ACQUISITIONS (PBSA) Dani Wildason (202)
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
The Audio system will call you if you enter your phone number upon login. If that doesn't work call: Toll access number (Toll): Toll free.
Chapter 8 Support Functions
Iowa’s Teacher Quality Program. Intent of the General Assembly To create a student achievement and teacher quality program that acknowledges that outstanding.
ITS Software A TxDOT Statewide Perspective Charlie Farnham ITS Configuration Manager ITS America June 6, 2007.
Understanding Information Systems. Information System (IS) An IS is a combination of people, hardware, software, computer networks, and data that organizations.
CORE Executive Board March 31, 2010 Next CEB April 28, 2010.
North Carolina’s New Statewide Road Centerline Data Sarah Wray, GISP, CGCIOTim Sheldon, GISP Spatial Data ManagerBusiness Analyst Engineering Transportation.
Technology Planning. Primary Elements Stakeholders Leadership team Needs assessment Technology components Work plan Budget Policies Evaluation.
1 Energy Efficiency & Utilities Sector March 2014 CALIFORNIA COMMUNITY COLLEGES CHANCELLOR’S OFFICE.
1 Outsourcing and OffShoring January 2004 Sandy Senti.
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
MKS at ITT: Managing ATM Projects A Presentation for WDCA CMWG Phyllis High Jones ADS-B Configuration Manager October 11, 2011 Surveillance and Broadcast.
Craig J. Nichols, Secretary Purchasing Directors’ Meeting November 21, 2013.
Integrating Asset Registers Richard Bramham Asset Co-ordinator Manningham City Council 2010 National Local Government Asset Management and Public Works.
Presentation to the Information Services Board March 6, 2008 Bill Kehoe, Chief Information Officer Bill Kehoe, Chief Information Officer.
Evolving Interdependency Between Acquisition and Finance Association of Government Accountants May 2008.
CMSC 128 – AB-1L PREPARED BY: MARIA KRISTINA DIÑA HAZEL ESMEDILLA RAMON JESUS BURGOS JANINE VILLATE Group 4 (Fantastic Four) USER STORIES.
SCLS Background:  May 1993 Dynix installed  1994 GoLive at 19 libraries  LINK expansion: 50 libraries and most of the Dynix modules  December.
Implementing SiteManager in a non-P/L/C State Dawn E. Scheel, P.E. TxDOT.
Implementing TraCS In Georgia 29 th Int’l Traffic Records Forum July 16, 2003 Presented by Bill Youngblood State Traffic Records Coordinator.
BUDGET MESSAGE 2009 Salem-Keizer Public Schools. Our Values  Minimize the impact on students.  Provide security for our employees by saving jobs as.
Pro-West & Associates Utilities On The Move Kendis Scharenbroich GIS Consultant Pro-West & Associates.
This material was developed by Oregon Health & Science University, funded by the Department of Health and Human Services, Office of the National Coordinator.
How AEP is Approaching the Information Management Crisis by Leveraging OSIsoft’s Suite of Tools Bill Sigmon Sr. Vice President Fossil and Hydro Generation.
Launch meeting < Customer name >
Healing Hospital North Shore, IL Vendor Selection for an Adverse Events Information System Imran Khan Project Manager Steven Stanford Chief Information.
FOCUS GROUP INTERVIEW GUIDE LEARNING & DEVELOPMENT STRATEGIC PLAN Group: Interviewer: Date: PHASE 2: Data Collection 1 ©2012 RAY SVENSON CONSULTING, INC.
University of Wyoming Financial Reporting Initiative Update April 2016.
FI$Cal Change Discussion Guide Appendix C – FI$Cal Project Overview April 2016.
Automating Work Order Processes for Advanced Metering Infrastructure (AMI) Devices with Collector for ArcGIS and Portal for ArcGIS Subrahmanyam Pendyala.
© CGI Group Inc. “Modernizing your ERP – Getting there and continual improvement” State panelist: Doug Cotnoir, Maine, Controller Tom White, Alabama, Comptroller.
Town of Watertown Staffing and Operational Assessment of the Public Works Department September 10, 2013 EDWARD J. COLLINS CENTER FOR PUBLIC MANAGEMENT.
1 -A BLUEPRINT- VDOT Response to a Declining Economy David S. Ekern, P.E. Commissioner Virginia Department of Transportation October 15, 2008.
Systems Development Process Developing our own software The Business Perspective Copyright © 2016 Curt Hill.
Oswald Chong, Ph.D. University of Kansas, Civil, Environmental and Architectural Engineering.
Create a system that reflects higher education best practices
Implementation of Computer Maintenance Management system - CMMS
Facility Insight Commencing July , /10/2018
Recommending a Strategy
WSIPC History Founded in 1967 by Snohomish County school districts to share costs for software development, hardware, and centralized technology support.
Shared Services Open Forum
New Mexico Department of Health Immunization Program
New Mexico Law Enforcement telecommunications System (NMLETS) Upgrade
Construction and Materials Management System
Are we ready to move to the Operation Phase?
Department of Licensing HP 3000 Replatforming Project Closeout Report
Using Technology to Drive Change: WVU’s Journey to Transform Expense Management Rachel Hays & Caitlin Mutkus, West Virginia University.
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
Brian Robinson, Deputy HR Director
Financial Reporting System
LIMS (Land Information Management System)
Presentation transcript:

How is Utah’s Operations Management System (OMS) really working? 2010 WASHTO COMMITTEE ON MAINTENANCE

UDOT Organization 1,750 employees 5,887 miles of road 16,520 lane miles 24,700 surface areas Central Office 4 Regions, each split into 2 Districts $1.5 billion in construction this year

Maintenance Organization 580 employees 85 maintenance stations statewide Central Maintenance –Maintenance Engineer and 14 core staff Trans-Tech (construction/maintenance) Approx $97 million in maintenance budget (fy10) –$21 million in snow removal –$17 million in hard surface Zero Based Budget process to develop budgets

Maintenance System Upgrade Replace existing MMS system –Originally launched in 1993 –Mainframe/Desktop application

Maintenance System Upgrade Key Business system –21 interfaces

OMS RFP Development Began preparing RFP in 2004 Advertised in companies responded, two start from scratch, and two with COTS software. Refined questions and sent out a second RFP. Again same four vendors. Contract awarded to AgileAssets in 2006

Implementation Project Kicked off November 2006 Exercised contract options –User Familiarization Area –On-site project manager –Train-the-Trainer approach to training Visited Wyoming July 2007 to get their input on what worked and what didn’t. “Go Live” November 2008

Rolling our System Training “Train-the-Trainer” approach –Adult teaching skills Three weeks of system training –Week 1: System Basics Practice after training –Week 2: Advanced features Practice after training –Week 3: Review 28 trainers in two groups

Go-Live “Flip the Switch” –November 15, 2008 –End of Pay Period

One Year Later 2010 WASHTO COMMITTEE ON MAINTENANCE Feature Inventory –Still an Achilles Heel for complete system integration. MMQA –Realizing our need to tie condition assessment to feature inventory –Re-evaluate what we measure Understanding the implications of Owning vs. Renting the code Pavement Management Module implemented

How are we going forward? (1 of 2) Most employees accept the system, but don’t use it to its full potential Better integration with other business data. (State Financials, GIS) Field Data Collection Pilot project –LiDar vs. handheld GPS equipped mobile workforce –True cost reporting and performance measurement Reporting to Legislature/Taxpayer 2010 WASHTO COMMITTEE ON MAINTENANCE

Hired a retired maintenance analyst –Focus on getting system operating to its full potential. –Help with training. –Lucky to have been able to hire the best of the best. Develop our Zero Based Budget Process –Improve MMQA reporting –Complete Feature Inventory –Develop local Activity Standards –Work with Construction to update changes. Better GIS/GPS tools –Some in OMS, some in-house developed. How are we going forward? (2 of 2)

Feature Inventory –Finding the right methodology, and getting resources for it –Link to MMQA, and to work order creation –Using feature inventory in budgeting process MMQA –Making it useful for station supervisors –Making snow log reporting easy and useful System enhancements –Weaning ourselves from AgileAssets –Creating our own reports Cost of support and maintenance Outstanding Issues

Questions? Lloyd Neeley, P.E. Deputy Maintenance Engineer