 Name  Work experience  Background in continuous improvement activities  Expectations 1.

Slides:



Advertisements
Similar presentations
CI Basics Super Sponsor DMAIC The Value Stream 6σ6σ.
Advertisements

ISHIKAWA DIAGRAM – Tool for quality management Marit Laos IS Project Management
Six Sigma Green Belt: Overview Robert Setaputra. What is Six Sigma? Six Sigma is the relentless and rigorous pursuit of the reduction of variation in.
QBASE Engineering © QBASE Engineering Sdn Bhd SIXSIGMA AWARENESS Overview Six Sigma is a management philosophy that is sweeping the world by storm and.
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
Control Charts for Attributes
Principles of Six Sigma
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Six Sigma TOTAL QUALITY MANAGEMENT 6 
Lean Six Sigma Knowledge of Lean 6σ Tools can help you in your daily work.
Six Sigma Dr. Ron Tibben-Lembke SCM 462 Dr. Ron Tibben-Lembke SCM 462.
Principles of Six Sigma
Lean Six Sigma: A Vision
1. 2 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
Lean Six Sigma A Methodology for Cultural Change and Continuous Process Improvement (CPI)
Development of Six Sigma
Managing Project Quality
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 10 Principles of Six Sigma.
1 Industrial Design of Experiments STAT 321 Winona State University.
Six Sigma. What is Six Sigma??  A statistical concept that represents amount of variation in a process relative to a specification  % defect.
1 IES 331 Quality Control TQM / Quality Systems and Standards Week 15 September 13-15, 2005.
Manufacturing Processes Copyright © Texas Education Agency, All rights reserved.
“Safety is a Measure of Success”
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
Cost of Quality - COQ MGMT-5060 Operations Management.
Simple Process Mapping Techniques
1-1 1 Quality Management Chapter Total Quality Management (TQM) Total quality management is defined as managing the entire organization so that.
Welcome to Lean Six Sigma Green Belt Training
By: Nick Blank March 1, Six Sigma Definitions Goals History Methods Roles Benefits Criticism Software Development.
Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10th Edition. By Jay Heizer & Barry Render.
STEP 1: DEFINE THE PROBLEM Problem Statement: What is the problem? A problem is a discrepancy between a standard and the current situation. The ‘standard’
© 2001 Six Sigma Academy © 2003 Six Sigma Academy1 Champion Workshop Key Concepts.
PRIMO Limited & 6 Sigma By HKU SPACE 6 Sigma Consultant Firm 30-May-2006.
1.  Name  Work experience  Background in continuous improvement activities  Expectations 2.
The Value Driven Approach
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
Customer Expectations Standards Certifications Inspections Packaging Others.
1 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
ABSOLUTES OF QUALITY Definition Conformance to Requirements
1 Prof. Indrajit Mukherjee, School of Management, IIT Bombay Bill Smith’s findings…. Bill Smith’s paper concluded that if product was found defective and.
Frameworks for Organizational Quality 1 Chee-Cheng Chen Dec.,
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Analyze Wrap Up and Action Items
IENG 451 / 452 Exam Review: Six Sigma Philosophy Lectures 01 – 12
CPI Event / Project Tollgate Template
Practical Assessment Project Template
Lean Six Sigma Road Map Improvement Process Road Map
Six Sigma.
Six-Sigma : DMAIC Cycle & Application
Control Charts for Attributes
Lean Six Sigma DMAIC Improvement Story
Six Sigma.
Quality Certification
Lean Six Sigma DMAIC Improvement Story
Presented By: <Names> <Team Name> <Date>
Lean Six Sigma DMAIC Improvement Story
Quality Management Six Sigma
Six Sigma. Six Sigma What is Six Sigma? Philosophy: We should work smarter, not harder. Business strategy: We gain a competitive edges in Quality,
QUALITY IMPROVEMENT BASICS
Improve Phase Wrap Up and Action Items
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
DMAIC STANDARD WORK TEMPLATE
DMAIC STANDARD WORK TEMPLATE
Measure Phase Wrap Up and Action Items
CPI Event / Project Tollgate Template
Lean-Green belt six sigma program
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

 Name  Work experience  Background in continuous improvement activities  Expectations 1

Quality = Performance Expectation Quality = Performance Expectation Fitness for use Conformance to specifications Producing the best results Total customer satisfaction Exceeding customer expectations Excellent products or services 2

The Kano model relates three factors to their degree of implementation or level of implementation, as shown in the diagram. 1) Basic ("must be") factors 2) Performance ("more is better") factors 3) Delighter ("excitement") factors. The degree of customer satisfaction ranges from disgust, through neutrality, to delight. The Kano model relates three factors to their degree of implementation or level of implementation, as shown in the diagram. 1) Basic ("must be") factors 2) Performance ("more is better") factors 3) Delighter ("excitement") factors. The degree of customer satisfaction ranges from disgust, through neutrality, to delight. 3 Performance Delight Neutral Dissatisfied Kano Model Presence of Characteristics Degree of Customer Satisfaction AbsentFulfilled "Basic" "Delighter" See V-14

 Quality  Delivery  Responsiveness  Cost  Safety “QDRCS” 4

 To repeatedly apply the DMAIC strategy to produce success stories and improve the corporate scorecard  To understand the Six Sigma culture and to be able to contribute to its development  To realize the importance of the need and use of statistics in process improvement  To know what Six Sigma is, the relationship between variation and Cost of Poor Quality (COPQ) and to be able to apply basic Six Sigma concepts for the purpose of improving the bottom line  To continually challenge the employees to reduce waste 5

 Able to ◦ manage a project ◦ define a process ◦ define metrics ◦ gather and analyze data ◦ show process control ◦ determine process capability  Able to use statistics and communicate expectations for process control data to untrained people  Understand that simple tools can produce dramatic results  Behavior is to: “Learn - Do - Communicate” 6

Every employee is actively involved in process improvements using DMAIC tools, resulting in measurable improvements. 100% All employees % Green Belts 1 - 2% BBs Champions 7

Measure process flow, IPO, C&E, metrics, etc. Statistical tools Analyze & Improve Cpk, control charts, DOE Control SOP, control charts No Defects Statistical tools We have a toolbox of techniques to help us reduce defects: PF / CE / CNX / SOP / ……….DOE / etc. 8

GREEN BELT TRAINING PROJECT SELECTION GUIDLINES Your Green Belt training project should be carefully selected so you get the most from the training. These guidelines were put together to assist you in your project selection process. It is impossible to find a “perfect” training project. However, by choosing a project that meets a majority of the following criteria, you will be most likely to apply the tools you’ll be taught. These criteria are broken down into five major categories and are shown below. These criteria alone should not be used for project selection. It is highly advised that you consult with your instructor, or mentor, and work closely with the process owner during the selection process. THE PROBLEM: You should have a general understanding of the problem The team should understand and be excited about why they’re working on this problem Scoped to make good progress which will help keep the team involved Don’t get too caught up in Return On Investment (R.O.I.) Good “leverage” potential is always a plus (i.e. – your lessons learned can be applied on many other parts/processes) As a training project, it should have a good chance of success THE DATA: Good data exists, or can be collected in a timely manner While working on the project, you will need to have a good “stream” of incoming data (i.e. – avoid jobs/processes that only occur once) You can develop a good “performance” measure Variable data is preferred THE SCOPE: Narrow scope/likely to be solved in a 90 day time frame Use your mentor or any other Black Belt to help with “scoping” HOW TO IDENTIFY: Create a Pareto of defects for an area, department, product line, etc. Talk to process owners Talk to your customers Develop a “potential” project list Use your mentor or any other Black Belt to help with the scope of your project WHEN DOES YOUR PROJECT NEED TO BE IDENTIFIED? The earlier the better… yesterday would have been good Consider going into week 1 training with more than 1 potential training project to choose from Final decisions should be made right after week 1 of training. 9

I P O Inputs Process Output (Sources of Variability) (Measures of Performance) Process (Activity) A blending of inputs to achieve the desired outputs Perform a service Produce a product Complete a task Material Machine Measurement Methods Mother Nature Manpower Any sequence of events that can be described with a SIPOC can be improved with DMAIC Supplier Customer 10

Microsoft Word template available on website 11 See V-2 to 7

January 15, 1987  Motorola officially launched the concept of Six Sigma on this date and set the Six Sigma goal of achieving less than 3.4 defects per million opportunities throughout an organization 12