Reporting and Evaluating DSM Performance Staff Workshop – April 28, 2011.

Slides:



Advertisements
Similar presentations
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
Advertisements

SSC-NM0053 Determination of Greenhouse Gas Emissions Reductions Based on Whole- Building Simulation of Building Mitigation Efforts Using eQUEST/DOE-2.2.
GUIDELINES ON: (A) COMMON PRACTICE (B) ADDITIONALITY OF FIRST-OF-ITS KIND SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
© 3M All Rights Reserved. Innovations in Permitting and Flexible Air Permitting as Well as Methods to Improve the Permitting Process Mark Manninen,
Cleaner Air Set-Asides (CASA) February 14, 2006 DRAFT Illinois Environmental Protection Agency / Bureau of Air.
Insights on Economic Impacts of Utility Mercury and CO 2 Controls Anne Smith Charles River Associates North Carolina DENR/DAQ Workshop on Mercury and CO.
1 Board of Early Education and Care April 14, 2009 Child Care Development Fund – State Plan for Federal Fiscal Years 2010 and 2011.
1 Conservation Program Cost-Effectiveness Tests Presentation to the: Florida Public Service Commission Workshop on Energy Efficiency Initiatives November.
Overview of Floridas DSM Accomplishments and Goal Setting Process Presentation to the: Florida Public Service Commission Workshop on Energy Efficiency.
Special Registry/Industry Q&A Session ALLOWABLE COSTS SUBMISSIONS
Solar Water Heating as a Green House Gas Reduction and Energy Conservation Strategy Florida Solar Energy Industries Association and Florida Solar Energy.
Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
May 17, 2012 Lottery Marketing & Incentive Pay: Jackpot and Economy, Not Advertising or Beneficiary Change, Appeared to Impact Ticket Sales Peter Heineccius.
Item #16 California Measure SB375: Linking Greenhouse Gas Emissions Reductions to Metropolitan Transportation Planning Presentation to the National Capital.
Texas Energy Independence Week Renewables & Natural Gas: Confluence, Conflict, or Something In Between? February 23, 2011 Todd Foley Senior Vice President,
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
NARUC 2015 Winter Meeting February 16, 2015 Combined Heat and Power and the Clean Power Plan Bruce Hedman Institute for Industrial Productivity.
Performance Based Teacher Evaluation March 10, 2006.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Energy Efficiency and Arizona’s Energy Future Jeff Schlegel Southwest Energy Efficiency Project (SWEEP) April
California Energy Commission AB 1257 Report on the Role of Natural Gas in California Staff Workshop on California’s Natural Gas Infrastructure, Storage,
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
Combined Heat and Power in the Ethanol Industry Tom Kerr Energy Supply and Industry Branch U.S. Environmental Protection Agency Governors’ Ethanol Coalition.
DRA Advocacy Joe Como, Acting Director. 2 DRA Facts The Voice of Consumers, Making a Difference! 3  History: CPUC created DRA (formerly known as the.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Renewable Energy in New Jersey’s Clean Energy Program Scott Hunter Renewable Energy Program Administrator, Office of Clean Energy in the New Jersey Board.
Climate Change Actions taken by the California Public Utilities Commission.
Limited Proceedings Water & Wastewater Reference Manual1.
California’s Climate Initiative. 2 Executive Order Established Statewide GHG Targets By 2010, Reduce to 2000 Emission Levels* By 2020, Reduce to 1990.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Administrative Penalty Program SB Regulatory Item California Air Resources Board Enforcement Division Public Hearing December 12, 2002 Sacramento,
KEC Electricity Committee, March 12, 2008 Benefit Cost Study of the Governor’s 2015 Wind Challenge: 1,000 MW by 2015 Bob Glass KCC Utilities Division,
MarylandEnergyOutlook Advisory Committee Meeting December 1, 2009.
Why is WPL filing a rate case?  Last Base Case Rates were set January, 2007  Cost of our utility investments must be reflected in prices our customers.
PA Department of Environmental Protection Continuous Source Monitoring Manual (Manual, Revision 8)
Discussion And Request For Direction On Options For Expanding Board Awards Program Market Development and Sustainability Committee March 7, 2007.
Strategic Planning for DSM in a Community-owned Utility Presented by Shu-Sun Kwan & Ed Arguello Colorado Springs Utilities 2005 APPA Engineering & Operations.
New Jersey Community RE / Solar Programs* New Jersey Board of Public Utilities Net Metering & Interconnection Rules Stakeholder Meeting July 23, 2008 *FOR.
“Leveraging Utility Resources” April 1, | 2 Helping customers to manage energy use through:  Energy efficiency  Demand response  California Solar.
M ICHIGAN P UBLIC S ERVICE C OMMISSION Energy Optimization Plans 2011 Biennial Review Pre-Filing Update Rob Ozar, Manager Energy Optimization Section March.
Clean and Diversified Energy Initiative Rich Halvey Western Governors’ Association Legislative Forum Monterrey, N.L., Mexico.
The Facts About Schoolsite Councils The Roles and Responsibilities of a Schoolsite Council.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
California Solar Initiative Dian M. Grueneich, Commissioner California Public Utilities Commission March 30, 2006.
CALIFORNIA ENERGY COMMISSION Page 1 Energy Policy Report Proceeding Docket 02-IEP-01 Staff Workshop Paper Publication F Sylvia Bender Demand.
Staff Assistance In Alternate Rate Setting Water & Wastewater Reference Manual1.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
Cogeneration and EAP II Ensuring Reliability or Broken Promises Michael Alcantar on behalf of the Cogeneration Association of California April 24, 2006.
Florida Energy Efficiency and Conservation Act (FEECA) Presentation to: Florida Energy & Climate Commission Terry Deason July 22, 2009 Radey I Thomas I.
Overview of SB 350 California Public Utilities Commission Melicia Charles, Energy Division February 23,
Creating A Greener Energy Future For the Commonwealth Clean Heat & Power in Massachusetts John Ballam, P.E. Manager of Engineering & the CHP Program MA.
Water Efficiency Ordinance ZCA No. 750
Professor H. J Annegarn, Ms L Cape
Bypass Distributed Generation (DG) Forecast Methodology
COMPREHENSIVE PLAN 2017 AMENDMENT PROCESS and DOCKET
NJCEP Strategic Planning Stakeholder Focus Groups
NSPS Rulemakings for Greenhouse Gas Emissions
Affordable Energy Production from Renewable Fuel
Achievable Penetration Rates
Restructuring Roundtable April 11, 2008 Richard Cowart
NJCEP Strategic Planning Stakeholder Focus Groups
City Council April 30, 2018 Item 13
Solar Energy Commercialization Utility Scale Business:
Briefing: Delaware Offshore Wind Working Group January 26, 2018
Presentation transcript:

Reporting and Evaluating DSM Performance Staff Workshop – April 28, 2011

Purpose of Goals and Programs Economically defer power plant construction Conserve expensive resources (fuel savings) Encourage development of demand-side renewables (solar pv, solar thermal)

Potential Consequences of Not Meeting Goals (to Ratepayers) Increased costs – plant and fuel Increased environmental emissions Local economic impacts(jobs)

Historic Reporting Methods FEECA Statutes (Sections – 85 and Section , F.S.) PSC to provide report to Legislature and Governor by March 1 Rule (5), F.A.C. Utilities report DSM achievements for prior calendar year to PSC by March 1 Order PSC FOF-EG Separate Residential and C/I categories Annual Numeric Goals Solar Pilot Programs Required

Current Situation – 2010 Filings

Current Situation

2012 FEECA Report Draft to Internal Affairs early will include: 1)MW, MWh Savings compared to goals Residential, C/I, and combined Annual and Cumulative 2)Utility justification for goal variances 3)Solar Pilot Programs (MW, MWh, number of installations, etc.) 4)Ratepayer impact of utility performance (goal achievement or failure)

2012 FEECA Report Draft Report will also contain recommendations for next steps. Options include: Accept filings and justifications – no further action Program revisions or additions – docketed proceeding for affected utility Reward/penalty – docketed proceeding for affected utility Other?

Options Going Forward How should 2010 DSM achievements be reported and evaluated for purposes of the 2012 FEECA Report? 1. Is it more appropriate to measure 2010 DSM achievements against the goals established in 2004 or 2009? 2. What is the appropriate date range to use for judging utility performance: annual, or a band of 3 to 6 years? 3. How should achievements be measured: against annual goals, cumulative goals or both? 4. How should savings for Residential and C/I customer classes be evaluated: separately, combined, or both? 5. What type of information should be provided for solar pilot projects? (i.e., number of installations, savings per installation, amount of expenditures, problems encountered and lessons learned.) 6. What additional information should be provided to assist staff in evaluating utilities 2010 performance?

Next Steps Post Workshop Comments – within a week. Staff intends to issue data requests within the next few weeks.

Options Going Forward How should 2010 DSM achievements be reported and evaluated for purposes of the 2012 FEECA Report? 1.Is it more appropriate to measure 2010 DSM achievements against the goals established in 2004 or 2009?

Options Going Forward How should 2010 DSM achievements be reported and evaluated for purposes of the 2012 FEECA Report? 2. What is the appropriate date range to use for judging utility performance: annual, or a band of 3 to 6 years?

Options Going Forward How should 2010 DSM achievements be reported and evaluated for purposes of the 2012 FEECA Report? 3. How should achievements be measured: against annual goals, cumulative goals or both?

Options Going Forward How should 2010 DSM achievements be reported and evaluated for purposes of the 2012 FEECA Report? 4. How should savings for Residential and C/I customer classes be evaluated: separately, combined, or both?

Options Going Forward How should 2010 DSM achievements be reported and evaluated for purposes of the 2012 FEECA Report? 5. What type of information should be provided for solar pilot projects? (i.e., number of installations, savings per installation, amount of expenditures, problems encountered and lessons learned.)

Options Going Forward How should 2010 DSM achievements be reported and evaluated for purposes of the 2012 FEECA Report? 6. What additional information should be provided to assist staff in evaluating utilities 2010 performance?