Planning, Programming, Budgeting, and Execution (PPBE) Process
Advertisements

Planning, Programming, Budgeting, and Execution (PPBE)
ACQUISITION PLANNING.
UN UNCLASSIFIED 1 DOD Participation Challenges in the National Exercise Program Issue : DOD Participation Challenges in the National Exercise Program.
THE NSF BUDGET Overview of Agency Funding Processes Presented by Beth Blue National Science Foundation Office of Budget, Finance, and Award Management.
TARGET AFFORDABILITY AND CONTROL COST GROWTH David G. Ahern Portfolio Systems Acquisition Office of the Assistant Secretary of Defense (Acquisition) April.
Introduction to PPBE.
Planning, Programming, Budgeting, and Execution (PPBE)
Continuous Process Improvement (CPI) Program Update Colonel Ric Sherman, United States Army Office of the Assistant Deputy Under Secretary of Defense for.
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Air Force Cost Analysis in 2011 Mr. Rich Hartley Deputy Assistant.
1 How the AT&L Direct Budget System aka budgeOmatic and the Executive Information System aka zoomOrama fit into OSD management Presentation outline: Scope.
Program Update ASMC Meeting May BMMP Mission “Transform business operations to achieve improved warfighter support while enabling financial accountability.
1 Contractors on the Battlefield Mr. Gary Motsek Assistant Deputy Secretary of Defense (Program Support) November 12, 2009.
OFFICE OF THE UNDER SECRETARY OF DEFENSE FOR INTELLIGENCE CI & SECURITY DIRECTORATE, DDI(I&S) Valerie Heil March 20, 2015 UNCLASSIFIED Industrial Security.
Mr. Frank J. Anderson, Jr. President, Defense Acquisition University Acquisition Education Challenges and the Human Capital Strategic Plan.
Why is BCL Needed? BCL addresses long-standing challenges that have impacted the delivery of business capabilities The DepSecDef directed increasing the.
Your Financial Work Defense Finance and Accounting Service DFAS Transformation Update March 2003.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Implementing Will-Cost & Should-Cost Management Presented by Rebecca.
THE AFMC MOASP Air Force Materiel Command D. Brian Morris HQ AFMC/PKV (937) I n t e g r i t y - S e r v i c e - E x.
The Planning, Programming, Budgeting and Execution (PPBE) Process John Roth Department of Defense Deputy Comptroller (Program/Budget)
The Planning, Programming, Budgeting and Execution (PPBE) Process John Roth Deputy Comptroller (Program/Budget)
June 2003 Defense Acquisition University Planning, Programming, Budgeting and Execution (PPBE) Business, Cost Estimating, & Financial Management Capital.
1 Institutional Adaptation Panel Association of the United States Army Mr. Dean G. Popps Acting Assistant Secretary of the Army (Acquisition, Logistics.
Department of Defense Priorities and Challenges John P. Roth Deputy Comptroller (Program/Budget) 7 March 2005.
1 13 Feb 2004 Army Performance Management and Integration Programs & Strategy Directorate (SAFM-CE) New Horizons in Costing and Performance.
CoCom Involvement in the Joint Capabilities Process November 4, 2003.
PPBES Planning, Programming, Budgeting, and Execution System.
1 Clinger Cohen Act (CCA) (Title 40): An Emerging New Approach to Oversight – Overview and Program Pilot June 27, 2006 Mr. Edward Wingfield Commercial.
Planning, Programming, Budgeting and Execution (PPBE)
D Appendix D.11. Toward Net-Centric Acquisition Oversight A Proposal for an Acquisition Community of Interest (COI) MID 905 Streamlined Acquisition.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force As of: 02 Mar 051 Partnering with Industry on System Safety & MIL-STD-882D.
APEX 39 CAPE Priorities & Opportunities
Independent Expert Program Review (IEPR) February 2006.
The Planning, Programming, Budgeting and Execution (PPBE) Process
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
DAU MDAP Assist Capabilities Status Jess Stewart 16 November 2009.
BEA Orientation November 13, 2007
Life Cycle Cost Composition
Materiel Development Decision (MDD) Information Requirements
Power to the Edge A Net-Centric DoD NII/DoD CIO IT Acquisition Management Transformation Rapid Improvement Team (RIT) Principals Meeting November 18, 2003.
Hot Topics 18 March 2016 DoD Instruction : Defense Acquisition of Services 1.
Defense Systems Management College Defense Acquisition University Fort Belvoir, Virginia 16 Mar 2016 Requirements Executive Overview Workshop Planning,
Life Cycle Cost Composition MILCON Facilities Disposal O&M (or others as appropriate ) RDT & E Development Costs of PME & Support Items Systems Engineering.
Post-MDD: Analysis of Alternatives (AoA)
Planning, Programming, Budgeting, and Execution (PPBE) Process
Senior Steering Committee (SSC) Briefing
Defense Acquisition University
Planning, Programming, Budgeting and Execution (PPBE)
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
DoDAF 2 Was Designed to Support DoD’s 6 Core Processes
Life Cycle Cost Composition
Implementing Will-Cost & Should-Cost Management
Requirements Executive Overview Workshop Planning, Programming, Budgeting and Execution (PPBE) Process Roberta Tomasini
ISA 201 Intermediate Information Systems Acquisition
Defense Systems Management College Defense Acquisition University
Defense Acquisition System
Planning, Programming, Budgeting, and Execution (PPBE) and Congress
Performance Planning & The Budget
Architecture Tool Vendor’s Day
Workshop for ACT – IAC, EA-SIG Mr. David McDaniel (ctr) 20 July 2012
Improving Mission Effectiveness By Exploiting the Command’s Implementation Of the DoD Enterprise Services Management Framework - DESMF in the [name the.
Requirements Executive Overview Workshop Planning, Programming, Budgeting and Execution (PPBE) Process Roberta Tomasini
Materiel Development Decision (MDD) to Milestone A (MS A)
Religious Support for Generating & Operating Forces
PPBE JEOPARDY!.
IT Modernization & EIS Transformation
CARD: Basically must be prepared any time an independent estimate (ICE or CCA) is to be done
CARD: Basically must be prepared any time an independent estimate (ICE or CCA) is to be done
Joint Program Executive Office for Chemical and Biological Defense
Presentation transcript:

ASMC – Middle Georgia Chapter 9 Feb 2012 Luncheon Planning, Programming, Budgeting, and Execution (PPBE) Update Julian “Rob” Roberts Professor of Financial Management Defense Acquisition University – South Region Huntsville, AL

Outline PPBE Process and Schedule –Changes and updated terms “Will Cost” vs “Should Cost” 2

Resource Management System PPBE is the Primary Resource Management System for DoD: Articulates strategy Identifies size, structure and equipment for military forces Sets programming priorities Allocates resources Evaluates actual output against planned performance and adjusts resources as appropriate 3

PPBE Phases Planning (OSD Policy) –Assess capabilities / review threat –Develop guidance Programming (OSD CAPE) –Turn guidance into achievable, affordable packages –Five-year program (Future Years Defense Program) Budgeting (OSD Comptroller) –Test for efficient funds execution –Scrub budget year –Prepare defensible budget Execution Review (concurrent with program/budget review) –Develop performance metrics –Assess actual output against planned performance –Adjust resources to achieve desired performance goals 4

4 Major Changes in the FY PPBE Cycle DepSecDef memo, dated 9 Apr 10 DPPG (was GDF and JPG; now DPG for FY 13-17) One budget year (was two on the “on years”) –Makes this an annual budget cycle vs a biennial budget Focus on a 5-year period –Changed FY12-17 period to FY DOD conducting Front End Assessments –Eight issues with SecDef oversight via the “Large Group” –All other issues led by DepSecDef via the DAWG (now DMAG) NOTE: FY PPBE Cycle has six issues 5

Front End Assessments SecDef memo, dated 31 Mar 11 Security Force Assistance Institutionalize UAVs Family Programs and Mental Healthcare Anti-Access / Area Denial Research and Development Cyber Capabilities 6

CIA – Central Intelligence Agency COCOM – Combatant Commander CPR – Chairman’s Program Recommendation D, CAPE – Director, Cost Assessment & Program Eval DIA – Defense Intelligence Agency DPPG – Defense Planning & Programming Guidance FEAs – Front End Assessments JCS – Joint Chiefs of Staff NDS – National Defense Strategy NMS – National Military Strategy NSS – National Security Strategy OSD – Office of the Secretary of Defense QDR – Quadrennial Defense Review USD(P) – Undersecretary of Defense (Policy) VCJCS – Vice Chairman, Joint Chiefs of Staff APR/SEP PPBE – Planning Phase President National Security Council CIA/DIA/JCS/OSD (JCS, COCOMs, SERVICES) NMS DPPG NSS Planning Phase focus: Threat vs. Capabilities Update strategy Guidance for programming & budgeting NDS OSD Level JCS Level QDR FEB/MAR To DoD “Large Group”/Integrated Program/Budget Submission & Review FEAs D, CAPE/VCJCS/ USD(P) CPR Every 4 Years DPG for FY13-17 cycle

PPBE Integrated Program/Budget Review Components/ Defense Agencies BES PB MBI Adv Questions/ OSD/OMB Budget Hearings JUL JAN/FEB OCT Issue Resolution SECDEF/DEPSECDEF SLRG & DMAG POM OSD/ CAPE CPA DEC NOV JCS USD(C)/ OMB BES – Budget Estimate Submission CAPE – Cost Assessment & Prgm Evaluation COCOM – Combatant Commander CPA – Chairman’s Program Assessment CPM – Capability Portfolio Manager DMAG – Deputy’s Management Action Group FYDP – Future Years Defense Program MBI – Major Budget Issues OMB – Office of Management and Budget PB – President’s Budget POM – Program Objectives Memorandum RMD – Resource Management Decision SLRG – Senior Leader Review Group FYDP Update FYDP Update 3-Star Group Program Review focus: Compliance with DPPG CPMs Budget Review focus: - Pricing - Phasing - Funding policies - Budget execution RMDs Services / PEO / PM Answer / Reclama DoD “Large Group” FEAs

“Will Cost” vs “Should Cost” USD (AT&L) and USD(C) 22 Apr 11 Memo Will Cost Used for programming and budgeting Used for acquisition program baselines (APBs) Used for all reporting requirements external to DoD Should Cost Scrutinize every element of govt and contractor costs 3 ways to develop should cost estimates: Bottoms –Up estimate Determine specific discrete and measurable items Use competitive contracting and contract negotiations to identify should cost savings (old FAR definition) Model Programs Air Force : JSF, Global Hawk, SBIRS, EELV, AEHF Army: Joint Air Ground Missile, UH-60M, GCV, Paladin Product Improvement (PIP), NETT Warrior Navy: JSF, E-2D, Presidential Helo, LCS, Ohio Replacement Program 9

Air Force Implementation of Will-Cost & Should-Cost Mgt SAF/FM and SAF/AQ - 15 Jun 11 Memo Applies to ALL ACATs (ACAT I, II and III); required at all milestone decisions and annually “Non-advocate Will Cost-Estimates” –Previously, specific requirements for these estimates for ACAT I programs only –Now, same requirements (“same level of rigor”) will also apply to ACAT II and III –Aims to provide sufficient resources to execute the program under normal conditions, encountering average levels of technical, schedule, and programmatic risk (usually no less than the mean confidence level, typically between 55-65%) –“Used as basis for all budgeting and programming decisions” –“Basis for all metrics and reporting external to the department” –Shall be approved by office/entity outside of program office chain-of-command (AKA “ICE”) 10

Air Force Implementation of Will-Cost & Should-Cost Mgt SAF/FM and SAF/AQ - 15 Jun 11 Memo “PMs must begin to drive leanness into their programs by establishing Should-Cost estimates at major milestones” –Designed to drive productivity improvements –Used as an internal management tool to incentivize performance to targets –Based on realistic technical and schedule baselines and assumes success- oriented outcomes from implementation of efficiencies, lessons learned, and best practices –At a minimum, PMs are expected to identify specific discrete measurable items or initiatives that achieve savings against the Will-Cost estimate –ACAT I, II & III programs on the Acquisition Master List will present Should-Cost estimates at their next major milestone Difference between Will Cost (budget) and Should Cost will be held at Service level (initially for the five pilot programs only) –PMs to brief execution with respect to Should Cost at Spring Program Review (SPR) and Investment Budget Review (IBR) –PM requests release of “difference” at these reviews –Funds released via joint decision by SAF/AQ and SAF/FM (SAF/AQX and SAF/FMB for ACAT II and III) 11