Planning, Programming, Budgeting, and Execution (PPBE) and Congress

Similar presentations


Presentation on theme: "Planning, Programming, Budgeting, and Execution (PPBE) and Congress"— Presentation transcript:

1 Planning, Programming, Budgeting, and Execution (PPBE) and Congress
LOA University: Planning, Programming, Budgeting, and Execution (PPBE) and Congress I’m __________ and I’ll be discussing PPBE with you today. First, a little about my background……. PPBE is one of the three major decision support systems in the weapon system acquisition business. The other two, JCIDS and the acquisition management system, have already been discussed. Roberta Tomasini Professor of Financial Management Defense Acquisition University

2 PPBE and Congress Outline
PPBE Phases PPBE Process and Schedule Congressional Enactment This is the outline for the PPBE session. There are couple of overview charts… There are a few charts on the PPBE building blocks…..namely, FYDP (the Future Years Defense Program, MFP (Major Force Programs), and program elements. This will be followed by the timing, key players, and key documents in the PPBE process. Lastly, there are charts of the schedule for this PPBE cycle, which is FY10-15.

3 PB 17 vs Current Caps and Prior Budgets
(Dollars in Billions) $610 $590 $570 $550 $530 $510 Original BCA Caps $490 $470 FY10 FY11 FY12 FY13 FY Actuals FY 2015 PB Current Caps FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY 2013 PB/DSG FY 2017 PB FY 2016 PB Original BCA Caps

4 How we hit the lower FY 2017 topline
(Dollars in Billions) $10 $+5.0B $5 OCO Relief $-21.8B $-16.8B $0 Fuel Savings, $-2.8B Net Cut to Base Budget FY 2017 -$5 Inflation Savings, $-2.4B New Efficiencies, $-0.4B Gross BBA cut -$10 Net Program changes, $-11.2B -$15 -$20 -$25 Comparison to FY 2016 PB Plan for FY 2017

5 Cuts to hit the lower FY 2017 Topline
We will procure fewer weapons systems than planned: 9 AH-64 Apache helicopters (Army) 24 UH-60 Blackhawk helicopters (Army) 5 F-35 A Joint Strike Fighters 2 V-22 aircraft (Navy) 3 C-130J aircraft (Air Force) 4 LCAC Service Life Extension Programs (Navy) 77 Joint Light Tactical Vehicles (Marine Corps) Aircraft procurement accounts reduced $4.4 billion Shipbuilding reduced $1.75 billion Other procurement accounts reduced $2.6 billion Reduce plans for new military construction projects by $1.1 billion Comparison to FY 2016 PB Plan for FY 2017

6 Military Construction and Family Housing,
FY 2017 Base Funding By Appropriation Title By Military Department Military Construction and Family Housing, $7.4 Military Personnel, $135.2 Defense Wide $94.5 RDT&E, $71.4 Army $122.9 Procurement, $102.5 Air Force $151.1 Navy $155.4 O&M, $205.8 FY 2017 Request: $523.9 billion

7 Military Construction and Family Housing,
FY 2017 OCO Funding By Appropriation Title By Military Department Military Construction and Family Housing, $7.4 Military Personnel, $3.5 RDT&E, $.3 Procurement, $9.5 Defense Wide $8.5 Army $25.0 Air Force 15.8 O&M, $45.0 Navy $9.5 FY 2017 Request: $58.8 billion

8 FY 2017 Total Base and OCO Funding
By Appropriation Title By Military Department Military Construction and Family Housing, $7.6 Defense Wide $102.9 RDT&E, $71.7 Military Personnel, $138.5 Army $148.0 Procurement, $112.0 Air Force $166.9 Navy $164.8 O&M, $250.9 FY 2017 Request: $582.7 billion

9 Secretary Carter, February 2, 2016
Secretary Carter’s Priorities for This Budget Given the current level of budget resources ($800B in Budget Control Act cuts), we can’t reduce all risk. Instead, the Department must: Prioritize conventional deterrence against our most advanced adversaries Focus more on the shape than the size of the force Seek the best balance between force structure (size), modernization (capability) and readiness Emphasize lethality and capability of the force rather than size Emphasize posture rather than presence Emphasize innovation Attracting, retaining, and managing talent (Force of the Future) Update war plans and operational concepts Pursue “offset” technologies Institutional efficiency and reform “Today’s security environment is dramatically different … and it requires new ways of thinking and new ways of acting” Secretary Carter, February 2, 2016

10 FY 2017 Force Structure Force structure assessed sufficient to execute the strategy Major elements include: 14 SSBNs, 450 ICBMs 96 Operational Bombers (154 total) 287-ship Navy with 11 Carriers in FY 2017 (Building to a 308-ship Navy) 54+1 Tactical fighter squadrons 990k Army Total End Strength (460k Active) (30 Active BCTs in FY 2017) 221k Marine Corps Total End Strength (182k Active) FY 2017 Force Structure Sufficient to Execute Strategy

11 PPBE Phases Planning (OSD Policy) Programming (OSD CAPE)
Assess capabilities / review threat Develop guidance Programming (OSD CAPE) Turn guidance into achievable, affordable packages Five-year program (Future Years Defense Program) Budgeting (OSD Comptroller) Test for efficient funds execution Scrub budget year Prepare defensible budget Execution Review (concurrent with program/budget review) Develop performance metrics Assess actual output against planned performance Adjust resources to achieve desired performance goals Brief Overview of PPBE phases: There are three phases: planning, programming and budgeting. The major difference is that we now have a review of program execution/program performance concurrent with the program and budget review (NOT Army’s PPBES) Planning: QDR 2001 shifted the basis of defense planning from a "threat-based" model that dominated thinking in the past to a "capabilities-based" model Capabilities-based model: – Focuses on how an adversary might fight rather than specifically who the adversary might be or where a war might occur. – Recognizes that it is not enough to plan for large conventional wars in distant theaters. Instead, the United States must identify the capabilities required to deter and defeat adversaries who will rely on surprise, deception, and asymmetric warfare to achieve their objectives. Strategic Planning Guidance (SPG)/Guidance for the Development of the Forces (GDF) and Joint Programming Guidance (JPG): Marching Orders for next phase Programming: Components develop Program submissions based on guidance developed in the Planning phase OSD, OMB & Joint Staff review for priority, affordability Info captured in the FYDP Budgeting: Components develop budget submissions OSD(C) reviews budget inputs, with emphasis on funds execution Ultimate aim, to submit a defensible President’s Budget thru OMB to Congress Execution Review Overlays both Program Review and Budget Review processes In past emphasis on input, “how much to spend on each program”; now emphasis is on output, “what are we getting for our money?” Using performance metrics to examine program execution Let’s look at the years reviewed in the PPBE process…

12 Future Years Defense Program (FYDP)
Computer Database Maintained by OSD CAPE Contains Approved Force Structure and Resources for all Defense Programs Updated 3 Times this PPBE Cycle: Program Objectives Memorandum (POM) – Jun Budget Estimate Submission (BES) Dec President’s Budget (PB) - TBD Reflects PY, CY, BY, + 4 Out-Years 3 additional years for force structure only Component PPBE databases Navy: PBIS Air Force : ABIDES Army: PROBE Computer database maintained by Dir (PA&E) Summarizes forces, equipment, and resources Comprises one prior year (PY), the current year (CY), the “biennial” budget years (BY1 and BY2), four additional years for resources (POM) and three additional years for force structure only It is a “living” record reflecting the decisions made in the various phases of PPBE Updated two times per year to reflect the POM/BES (Aug/Sep), and President’s Budget (Jan/Feb) submissions Why two budget years? The process was intended to produce a two year budget. However, Congress appropriates one year at a time. So, we have “off-years/odd-years”. Originally, OSD and the Components were expected to “tweak” the 2nd year of the President’s Budget/POM as part of an off year effort APOM by the Air Force Mini-POM by the Army Program Review by the Navy However, there have been changes in this off-year/odd-year process, starting in calendar year 2003. TRANSITION: Let’s take a look at how the FYDP is structured 16 17 18 19

13 PPBE Process – Planning Phase Lead by USD (P)
YEAR 1 YEAR 2 Elapsed Time: Months FEB/MAR APR/MAY President National Security Council CIA/DIA/JCS/OSD CIA – Central Intelligence Agency COCOM – Combatant Commander CPR – Chairman’s Program Recommendation DIA – Defense Intelligence Agency DPG – Defense Planning Guidance JCS – Joint Chiefs of Staff NDS – National Defense Strategy NMS – National Military Strategy NSS – National Security Strategy OSD – Office of the Secretary of Defense QDR – Quadrennial Defense Review SCMR – Strategic Choices and Management Review USD(P) – Undersecretary of Defense (Policy) Planning Phase focus: Threat vs. Capabilities Update strategy Guidance for programming & budgeting NSS Every 4 Years Guidance for POM/BES submission and OSD Integrated Program/Budget Review OSD NDS QDR DPG New slide - Removed reference to SPRs Level With one exception, this slide depicts the “new” annual Planning phase that is to be used for the PPBE cycle starting in Calendar Year 2010 and which will, ultimately produce the Defense portion of the President’s Budget for FY2012. The one exception to the annual process is the QDR which is conducted in the 1st year of an administration and submitted to Congress in the 2nd year. The DPPG replaces the GDF (Guidance for Development of the Force) and the JPG (Joint Programming Guidance) and is signed by the SECDEF. The FEAs are intended to address major issues for the SECDEF early in the POM/BES review process. For the Calendar Year 2010 process the SECDEF has selected eight major issues. The Director, CAPE is the Executive Secretary for the FEAs and tri-chairs the process with the VCJCS and the USD(P). Issues nominated but not selected for the FEA review process will be addressed by the DEPSECDEF through the Deputy’s Advisory Working Group (DAWG). JCS NMS Level CPR (JCS, COCOMs, SERVICES)

14 FY 18–22 Program/Budget Review Schedule
Feb Fiscal Guidance 27-30 Jun Component POM Briefs to 3-Stars 30 Jun Component POM Submissions Due (Line item/PE level of detail) 29 Jul Issue Nominations Due 15 Aug Issue Nomination Disposition 15 Aug–10 Nov 16 Program Review 10 Nov PDMs 1 Dec BES due to OSD 1 Dec Budget Justification Material due to OSD Dec 16 – Jan Budget Review TBD PBDs TBD Budget Lock TBD President’s Budget Released Source: Joint CAPE & USD(C) memo dated 26 Feb 2016

15 Notional Enactment Process and Timeline
President’s Budget to Congress Notional Enactment Process and Timeline Feb Mar Apr May Jun Jul Aug Sep Oct HBC HEARINGS FLOOR BUDGET RESOLUTION MARKUPS CONCURRENT RESOLUTION CONF HEARINGS SBC MARKUPS FLOOR HASC HEARINGS MARKUPS FLOOR FLOOR Authorizations Act AUTHORIZATION CONF FLOOR SASC HEARINGS MARKUPS FLOOR HAC HEARINGS MARKUPS FLOOR FLOOR Appropriations Act APPROPRIATION CONF HEARINGS MARKUPS FLOOR FLOOR SAC Version 3.4,

16 Backups

17 Key PPBE Action Officers
AIR FORCE: Program Element Monitor ( PEM ) Works for Air Force SAE (SAF/AQ) Each Air Force program element is assigned a PEM Interfaces with Using Commands, Material Command, Air Staff, Air Secretariat, OSD, and sometimes Congress A PEM may be responsible for more than one program element ARMY: Department of Army Systems Coordinator (DASC) Works for Army SAE (ASA/ALT) Interfaces with Using Commands, Developing Commands, Army Staff, Army Secretariat, OSD, and Congress NAVY: Requirements Officer ( RO ) Works for resource sponsor on OPNAV staff (e.g., Navy Aviation resource sponsor is N98) Interfaces with Using Commands, Systems/Developing Commands, OPNAV Staff, Navy Secretariat, and OSD Importance of Headquarters Action Officers in the PPBS process Each service does it somewhat differently with different players. AF = PEMs, Navy = ROs, Army = DASCs Important point about AOs is that it is absolutely essential the PMO stay connected to, and maintain open lines of communication with the PPBS AOs . This is especially true during POM build when Services are RESOURCING and prioritizing programs. Though it is important that PMO’s know what AOs are up to, it is equally important that PMO’s ensure that AOs know what is going on in their programs and keep them up to date and informed. PPBS Action Officers field questions about programs from Congress, OSD, Users, etc. on a regular basis--and they don’t always have time to confer with the PMO.

18 FY 2017 budget – Some Significant Items
USD (Comptroller) DAU – EPMC 15-05 FY 2017 budget – Some Significant Items $12.5 billion (2.4% of TOA) • 63 F-35 - $10.5 billion: F-35A (43); F-35B (16); F-35C (4) (FYDP: $59B) 10 new warships - $20.2 billion (2 SSN; 2 DDG; 2 LCS; 1 LHD; 3 others) Cyber capabilities - $6.8 billion (up from $5.5B) Rotary Lift aircraft - $6.7 billion Unmanned Systems - $3.2 billion Long Range Strike Bomber - $1.4 billion ($12.1 billion in the FYDP) Space Programs - $7.0 billion (zero satellites) Ground Vehicles - $4.1 billion Ammunition - $5.0 billion (up from $3.9 billion) Precision Guided Missiles - $2.3 billion Ballistic Missile Defense - $9.1 billion $7.5 billion) Ohio Replacement Program - $1.9 billion ($13.2 billion in the FYDP) Nuclear Enterprise - $6.1 billion (of which $1.6 billion went to NNSA)

19 PB 2017 Focus on Technology Innovation
Funds science and technology to further innovation (FY 2017, $12.5 billion; FYDP, $65.0 billion) Creates new connections with commercial sector Establishing experimental defense innovation units IN-Q-TEL Funds innovative “offset technologies” to bolster conventional deterrence (FYDP, $18B). Examples: Assured positioning, navigation and timing Large displacement unmanned undersea vehicles High speed strike weapons Arsenal plane Hypersonics Low-cost unmanned systems High-Velocity Projectiles from “powder guns” DoD needs to accelerate delivering new capabilities

20 Major Investments in the FY 2017 Budget
(Quantities/Dollars in Billions) Aircraft FY 2017 FYDP F-35 Joint Strike Fighter (USAF, USMC, USN) 63/$10.1 404/$56.3 F/A-18 (Navy) 2/$0.4 16/$2.2 KC-46 Tanker Replacement (Air Force) 15/$3.1 75/$15.7 AH-64E Apache helicopters (Army) 52/$1.1 275/$5.6 MQ-9 Reaper 24/$1.1 24/$3.9 Shipbuilding Virginia Class submarines (Navy) 2/$5.2 9/$29.4 DDG-51 AEGIS Destroyers (Navy) 2/$3.4 10/$18.3 Littoral Combat ships (Navy) 2/$1.3 7/$5.6 Space Evolved Expendable Launch Vehicle (Air Force) 5/$1.8 23/$9.4 Global Positioning System (Air Force) --/$0.8 10/$5.6 Requires Funding in 5-Year Plan + FY 2017 OCO *Includes Base + OCO Procurement and RDT&E Funding

21 Resource Allocation Process Overlap
CY14 CY15 CY16 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D FY14 Cycle Execution 2nd Yr 3rd Yr FY 14 and prior FY15 Cycle Enactment Execution 2nd Yr 3rd Yr FY 15 FY 15 and prior PB FY16 Cycle Planning Program/Budgeting Enactment Execution 2nd FY 16-20 DPG FY POM FY 16 BES FY 16 FY 16 and prior PB FY17 Cycle Planning Program/Budgeting Enactment Exec FY DPG FY POM FY 17 BES FY 17 FY17 & prior PB FY18 Cycle Planning Program/Budgeting FY DPG FY POM FY 18 BES DPG – Defense Planning Guidance PB – President’s Budget POM – Program Objectives Memorandum BES – Budget Estimate Submission

22 Bipartisan Budget Act of 2015
FY 16 (Base) Revised Security Revised Non-Security Current Law (BCA 2011) $523B $493B Revised Cap (BBA 2015) $548B $518B Delta $25B +$25B FY 17 (Base) Current Law (BCA 2011) $536B $504B Revised Cap (BBA 2015) $551B $519B Delta $15B +$15B Total Federal Govt Discretionary Base increase $80B (FY 16 $50B; FY 17 $30B) Defense FY 16 Base -$12B (PB 16 $534B - $522B BBA 2015) FY 16 OCO +$7B (PB 16 $52B - $59B BBA 2015) FY 16 Net $5B FY 17 Base -$21B (PB 16 $547B - $526B BBA 2015) FY 17 OCO +$2B (PB 16 $57B - $59B BBA 2015) FY 17 Net -$19B

23 Bipartisan Budget Act of 2015 Cont.
Debt ceiling suspended until March 2017 Revenue sources: Tightening tax rules for business relationships Selling off crude oil reserve Auctioning off government controlled wireless spectrums Spending adjustments Make changes to Medicare and Social Security

24 OSD/OMB Budget Hearings
PPBE – Program/Budget Submission/Review Yr 2 JUL SEP OCT NOV DEC Year 3 JAN/FEB DoD “Large Group” BES – Budget Estimate Submission CAPE – Cost Assessment & Prgm Evaluation COCOM – Combatant Commander CPA – Chairman’s Program Assessment DMAG – Deputy’s Management Action Group FYDP – Future Years Defense Program MBI – Major Budget Issues OMB – Office of Management and Budget PB – President’s Budget POM – Program Objectives Memorandum RMD – Resource Management Decision SLRG – Senior Leader Review Group 3-Star Group OSD/ CAPE Issue Resolution POM Issue Teams SECDEF/DEPSECDEF SLRG & DMAG CPA JCS Components/ Defense Agencies Program Review focus: Compliance with DPG RMDs BES USD(C) & OMB Adv Questions/ OSD/OMB Budget Hearings MBI This slide shows the FEAs, initiated in the previous chart (Planning Phase) continuing to be conducted into the Integrated Program/Budget Review time period. The issues included in the FEAs are to be resolved through the Large Group (similar in make-up to the Defense Senior Leadership Conference, as listed in DoD D , DoD Senior Governance Councils). The output of the Large Group, as well as that of the DAWG-addressed issues that were not selected by the SECDEF for FEAs, is provided to the SECDEF/DEPSECDEF. All other POM issues are addressed under the existing process led by the CAPE. Asterisks (TBD) indicate that the organizations may be re-named or realigned, or that activities (MBI and reclama process) may or may not be conducted. Asterisks were placed based on feedback from OSD POCs. The results of the review process for both the BES and the POM will be documented, as appropriate in RMDs. It is expected that an RMD will have two annexes – one for program-related decisions and the other for budget-related decisions. DoDD specifically addresses the membership of the Defense Senior Leadership Conference, the Senior Leader Review Group, and the Deputy’s Advisory Working Group. The membership of the “Small Group”, the “Large Group”, and the “Large Group Plus” has been referred to in the media but not codified as of May 2010. PB FYDP Update FYDP Update FYDP Update Services / PEO / PM Answer / Reclama Budget Review focus: - Pricing Phasing - Funding policies - Budget execution

25 FY 2017 Budget Supports Planned force structure levels
Service readiness recovery plans A safe, secure and reliable nuclear force at New START levels Force of the Future initiatives Modernization: DDG modernization and SSN upgrades Surface ship advanced munitions and sensor technologies Investment in space capabilities Hypersonic research and development Cyber tools for Combatant Commanders Army aviation modernization plan Marine Corps vehicle modernization plan Key reform proposals (e.g., TRICARE)

26 PPBE Overview (3/3):“Will Cost” vs “Should Cost” USD (AT&L) and USD(C) 22 Apr 11 Memo
Used for programming and budgeting Used for acquisition program baselines (APBs) Used for all reporting requirements external to DoD Should Cost Scrutinize every element of government and contractor costs 3 ways to develop should cost estimates: Bottoms –Up estimate Determine specific discrete and measurable items Use competitive contracting and contract negotiations to identify should cost savings (old FAR definition)

27 PPBE Building Blocks (3/3) Program Elements
A - ARMY N - NAVY M - MARINE F - AF D - OSD C - MDA E - DARPA J - JCS S - DLA BB - SOCOM DBD - DFAS PROGRAM ELEMENT (PE): Smallest aggregation of resources normally controlled by OSD - PE NUMBER: Used to track and identify resources; seven digit number followed by an alphabetic suffix PROGRAM 2 ( GENERAL PURPOSE FORCES ) A - Aircraft Engine CIP N - F/A-18 Squadrons F - AMRAAM PROGRAM 3 ( C3, INTEL & Space) A - Joint Command and Control Program (JC2) N - Aerial Common Sensor (ACS) F - NAVSTAR GPS (User Equipment) Program Elements are the lowest level of detail in the FYDP database. Program Elements are a tool OSD uses to track resources by program, system, or function so they can see how much is being spent on them. PEs can be very broad, containing several programs. They also can be very specific, covering a single component of a weapon system. It all depends on the visibility OSD wants to maintain. These are some examples of Program Elements (PEs), use F-22. Seven digit code followed by a letter suffix designating the applicable component or agency. The first two digits indicate the MFP to which the PE belongs. Although a PE is limited to a specific MFP, it is not in most cases, limited to a single Appropriation. All programs and all resources have PEs. The entire FYDP database can be listed by PE. There are a few thousands of them. Most acquisition programs have two program elements: one that begins with “06” for the development effort and one that begins with something other than “06” for the production and O&S effort. Ref: DoD H

28 PPBE Building Blocks (2/3) Future Years Defense Program (FYDP)
DOD APPROPRIATIONS Military Construction Military Personnel RDT&E Procurement Ops & Maintenance Other D E F O A Strategic Forces (1) T I A General Purpose Forces (2) R G H E E Command, Control, Comm, Intell & Space (3) N F N R MAJOR FORCE PROGRAMS A A Mobility Forces (4) O C R V I Guard & Reserve Forces (5) R M Y C E Teaching Points: Data is divided into 11 “Major Force Programs” (MFP) for DoD internal management uses during the planning and programming phases of PPBE. Data is also divided into five Appropriation categories (plus one catch-all “other” category, which simply represents the various other appropriations that exist -- although we in the acquisition community are not normally very interested in their details) for use by Congress when reviewing budget requests and enacting budget authority. Data is also divided into service or component categories. Important to note here that the data in any single category (for example: RDT&E, Army or Strategic Forces) from any one of the three major divisions (i.e., Appropriation, Component or MFP) can contain data from any or all of the remaining two major divisions (for example: Strategic Forces could contain data from all five appropriations and all four Components). The lowest level of detail in the FYDP database is the program element, which is explained on the next chart….. Research and Development (6) Y E S Central Supply & Maintenance (7) Training, Medical, & Other Personnel Activities (8) Administration and Associated Activities (9) DOD COMPONENTS Support of Other Nations (10) Special Operations Forces (11)

29 PPBE Overview (1/8) Three Major DoD Management Systems
Planning, Programming, Budgeting and Execution QDR Joint Capabilities Integration and Development System (JCIDS) Defense Acquisition System -DoD has three Decision-making Support Systems -1. AMS (Acquisition Management System) -- how we acquire weapon systems -- primary document is DoDI -- also referred to as little “a” acquisition -- event driven process 2. JCIDS --determines what is needed -- primary document is CJCSI 3170, which is capabilities-based with more emphasis on jointness -3. PPBE -- resource allocation in DoD – providing warfighter with best mix of forces, equipment and support attainable under fiscal constraints -- increased emphasis on using performance metrics to focus on output, return on investment -- Calendar driven -QDR: the major statement of defense strategy and business policy --MID 913 states that QDR is the single hierarchical link integrating all internal decision processes -JCIDS and AMS are event-driven; PPBE is calendar-driven, backing off from the PB -All three circles form “Big “A” Acquisition

30 Senior Leader Review Group
AKA “The Large Group” Secretary of Defense Deputy Secretary of Defense Secretary or Under Secretary of the Army Secretary or Under Secretary of the Navy Secretary or Under Secretary of Air Force Chairman Joint Chiefs of Staff Vice Chairman Joint Chiefs of Staff Under Secretary of Defense (AT&L)* Under Secretary of Defense (Policy)* Under Secretary of Defense (Comptroller) /Chief Financial Officer* Under Secretary of Defense (Intelligence)* Under Secretary of Defense (P&R)* Commandant or Assistant Commandant of the Marine Corps Director of Administration and Management Chief or Vice Chief of Staff of the Army Chief or Vice Chief of Naval Operations Chief of Staff or Vice Chief of the Air Force General Counsel ASD (Legislative Affairs) ASD (Networks & Information Integration/Chief Information Officer ASD for Public Affairs Director, Cost Assessment and Program Evaluation Director, Joint Staff Deputy Chief Management Officer Chief, National Guard Bureau This is the membership of the Senior Leader Review Group, chaired by SecDef. * Or Principal Deputy

31 OSD Budget Review - Micro Level
Phasing Development to Production (Concurrency) Schedules: Acq Milestones, Testing, Contract Award First/Fourth Quarter new starts are at risk Pricing Basis of Estimates for programs and Cost Exhibits Contract data Inflation, Learning curves, Production rates, Unit costs Policy - Annual, Incremental and Full funding Execution - likelihood budget request can be executed Historical (3-5 years) track record Obligation Rates, Expenditure Rates Availability of prior year funds for budget year efforts

32 Defense Appropriations “Colors of Money”
Military Personnel (MILPERS) Active & Reserve Forces Operation & Maintenance (O&M) (civilian Salaries, supplies, spares, fuels, travel, etc…) Environmental Restoration Former Soviet Union Threat Reduction Overseas Humanitarian, Disaster, & Civic Aid Procurement Aircraft Missiles Weapons Weapons & Tracked Combat Vehicles Ammunition Other Procurement Shipbuilding & Conversion Marine Corps Defense wide procurement National Guard & Reserves Research, Development, Test & Evaluation (RDT&E) Basic Research Applied Research Advanced Technology Development Advanced Component Development & Prototypes System Development & Demonstration RDT&E Management Support Operational Systems Development Military Construction (MILCON) Facilities Family Housing Base Realignment & Closure (BRAC) Other Defense Health Program Chemical Agents & Munitions Destruction Drug Interdiction & Counter-Drug Activities Joint Improvised Explosive Device Defeat Fund Rapid Acquisition Fund Office of the Inspector General RDT&E PROC MILPERS O&M MILCON Teaching Point: In the unlikely case the term “colors of money” is not familiar. This also shows a break out of the major appropriations. The different RDT&E budget categories are also referred to as different colors of money by some.

33 DoD Budget Overview (1/4) FM Scope: From Requirement to Capability
Planning, Programming, Budgeting and Execution Life Cycle Cost Annual Funding Cost Analysis Estimate ICE Funding Policies Full Funding (Exceptions) FYDP DPG POM RMD MFP PE BES CAIV CCA Fiscal Environment Incremental Funding POE AoA Congressional Enactment HAC HASC HBC SAC SASC SBC President’s Budget Budget Resolution Authorization & Appropriation Laws This chart is intended to show how we get from “Requirement” to “Capability” from a Financial Management perspective….. Starting with the lower left cloud, “Operational Concept”, as this is where it all starts for any discipline in acquisition. Operational Concept is the same as JCIDS plus. It includes the capability documents generated through the JCIDS process as well as a capabilities- based analysis and all acquisition programs have an acquisition program baseline (APB), which is a signed document between the program manager and the milestone decision authority in the acquisition chain of command. The agreement is on cost, schedule and performance parameters for a specific program. Operational concept leads to the first major area of Financial Management (FM), “Cost Analysis”. This includes doing a cost estimate, which is the foundation for the rest of the FM process. The second major area of FM is “Funding Policies”. This involves taking the cost estimate and turning it into a budget. Understanding funding policies is an important part of developing the budget. The third major area of FM is “PPBE”. This is the DoD process for allocating resources. We take a budget and submit it up the chain to get buy-in from our service/agency and OSD. This session will focus on this area. The end of the PPBE process is the president’s budget submission to Congress. This leads to the fourth area of FM, “Congressional Enactment”. The end of “Congressional Enactment” is the Authorization and Appropriation laws, which leads to the fifth and final area of FM, “Budget Execution”. Budget execution relates to actual appropriated funds. Now let’s focus on PPBE. Acquisition Program Baseline Operational Concept Force Structure Modernization Operational Capability Readiness Sustainability Feedback Commitment Reprogramming Capabilities-Based Assessment Capability Docs Budget Authority Obligation Expenditure Outlay Budget Execution


Download ppt "Planning, Programming, Budgeting, and Execution (PPBE) and Congress"