EMISSION PROBE PARTS TUBE: 3/8” OD x 0.049 wall Stainless Steel Length determined by pipe diameter and placement of connecting end to allow easy connection.

Slides:



Advertisements
Similar presentations
Automobile Engine NO.4. NO.1 Mercedes-Benz E-class.
Advertisements

ADX 150 – Engine Repair ADX 170 – Climate Controls
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
 Established in 1995  Located in Wilmington, NC with a 40,000 Sqft facility.  Specializes in the design and manufacturing of connection solutions. 
Connecting to industry. Fittings for Steam Hose Remember Steam is……… minimum 212 F.
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
1 FUEL SYSTEM SERVICE ENGINE CLEAN FUEL TOOL MODEL RX 777.
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
Welcome to Malaga WeBex Common Rail Fuel System
© Blue Graphics Concept Sauer-Danfoss START-UP PROCEDURE PROPEL PUMP Instruction Sauer-Danfoss Belgium – T. Van Mossevelde.
© 2012 Delmar, Cengage Learning Automotive Hoses Chapter 23.
1 DIESEL FUEL TOOL ON VEHICLE DIESEL FUEL SYSTEM SERVICE MODEL Rx HD 888 INSIDE FILTER.
Fresh water system. Matter to be decided: Potable water Wash water Pressure in the system: usually 10 to 40 psi 69 to 275 kPa 0.69 to 2.75 bar.
Hydraulics.
Outcome 2 Materials used to install domestic central heating pipework Unit 208: Central heating systems.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
JET PROPULSION Part 6 Jet Engine Operation Fuel Systems.
CMS Pixel Technical Board Meeting – Dec. 16, Forward Pixel Cooling System Information Joe Howell.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Hydronic Mechanical Controls
Mechanical for Oil Heat
Hydraulics For The Long Term
Lease Automatic Custody Transfer
The Cooling System.
Pump is Blue part (right) - timer is black (left side) New Electrical Outlet This Photo shows where the Re-Cir pump is installed on the Output line on.
CHAPTER 6 Moving Heat: Heating and Air Conditioning Principles
Plan 2 – Dead-end Seal Chamber Optional Jacket
Heat Transfer Equations For “thin walled” tubes, A i = A o.
Heating Systems.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Nuclear Thermal Hydraulic System Experiment
Cooling System. 1. List the basic parts of a cooling system: -Thermostat -Fan -Water pump -Radiator -Ethelyne glycole -Shroud.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only.
TRENTON Casing Filler Presentation
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
Section 3 Using Heat.
1 HVACR316 - Piping Copper Tubing and Fittings. 2 2 Safety Refrigerant cylinders should be stored and transported in the upright position to keep the.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
PVWC Hydrostatic Pumps. PVWC Hydrostatic Pump Features Control Selection –Mechanical Pintle w/o neutral by-pass (M-N)
PVWC Hydrostatic Pumps. PVWC Hydrostatic Pump Features Control Selection –Mechanical Pintle w/o neutral by-pass (M-N)
The Cooling System (Reasons for)
Chapter 39 Cooling System Fundamentals.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Diesel Engine Management Systems
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
AfterSalesTraining Welcome to AfterSalesTraining.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
ARÇELİK TİCARİ KLİMA EĞİTİM DÖKÜMANI APPENDIX.
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
Diesel Engine Management Systems Steve Baker. Diesel Engine Management Systems Steve Baker.
3. Climate Control Systems Service Automotive – Heating & Air Conditioning Topics covered in this presentation: Gauge set and refrigerant Service ports.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
Pipe specials.
Temperature Test Allows monitoring of temperature changes.
ACTIVE SOLAR DESIGN ALTERNATIVE ENEGRY SOURCES.
Automotive Engines Theory and Servicing
Design, Evaluation and Application of a Fuel Cell Vehicle
Engine Lubrication Systems
Climate Control Systems Service
Engine Lubrication Systems
Pixel CO2 Cooling Status
SB Packing Automatic Downpuller Power Unit
Fuel Supply System Service
By: JAGDEEP SANGWAN Refrigeration Basics 101.
OEM installation check with REV_03 CAD models for ISL CC option for coolant lines for D phase release Date- 26th Aug 2016.
OEM installation check with CAD models for ISL/QSL CC option for coolant lines for D phase release – CC9323 Date- 13th Feb 2017.
OEM installation check for ISL/QSL CC9293 for coolant lines reroute with quick disconnect Date- 16th Feb 2017.
 R2 Four Basic Components of a Refrigeration System #4 Metering Devices.
Presentation transcript:

EMISSION PROBE PARTS TUBE: 3/8” OD x wall Stainless Steel Length determined by pipe diameter and placement of connecting end to allow easy connection of the heated sample line. Long tubes may be bent to place connection end in desirable location. 3/8 Nut-Ferrule sets (Swagelok SS-600-NFSET) Probe Adapter: Swagelok fitting SS BT (3/8 NPT to 3/8 Tube, Bored Through) Cap Tube with Swagelok Cap SS-600-C (if keeping probe installed) Or Plug Adapter with Swagelok Plug SS-600-P (if probe is removed) 45 o Mitered End

EMISSION PROBE INSTALLATION Scribe Line to Identify 45 o Mitered Face Weld/braze adapter fitting to exhaust pipe (Do NOT use epoxy as shown in this mock-up) Mitered face in center of pipe and facing upstream Check the rules regarding probe locations. The probe can NOT be located near the end of the pipe as shown in this mock-up

COUPLER ORIENTATION For all Quick Disconnect couplers (fuel, coolant, supply, return); Flow is out of the male coupler and into the female coupler. NOTE: Contact to request couplers (provided free of charge to registered FLOW

COOLANT COUPLERS The black, Coolant Couplers shown above have been discontinued. New couplers, white, slightly smaller, and also with a ¾” hose barb, MUST BE USED. The new couplers will not mate with the old style couplers. For information on the new HFC couplers:

Hot Coolant from Engine into Heat Exchanger Cooled Coolant into Engine Inlet line and Outlet line are each 80” long Closed Loop Engine Cooling System Utilizing a brazed plate Heat Exchanger (Closed Loop = Pressure can build up to radiator cap’s relief pressure) Cold Side of Heat Exchanger Temperature Regulating Valve opens based on the temperature of the coolant returning to the engine

Engine Colder Male Quick Disconnect OPTIONAL Colder Female Quick Disconnect Participant’s Responsibility Test Facility Responsibility FUEL SYSTEM for EMISSION TESTING The sled’s fuel tank must be disconnected so that the test facility’s fuel measuring system supplies all the fuel. The test facility will supply a low pressure fuel. Teams need to supply their own external fuel pump and regulator to ensure that the engine receives fuel at the correct pressure. Teams must have the Colder Quick Disconnects installed for both emission events. For the in-service emission event, take into consideration accessibility of the QD’s and routing of the external fuel line(s). The QD’s are not required during the other events in the competition. Questions regarding the emission fuel system requirements should be directed to Fuel Tank Fuel Return Line Colder Female Quick Disconnect OPTIONAL Colder Male Quick Disconnect (if have a return line) Mass Flow Meter Fuel Supply Fuel Cooler Fuel Supply Regulator Low Pressure 1-5 psi Low Pressure Fuel Feed to Engine Fuel Supplied at Low Pressure High Pressure PUMP Filter Transfer Pump

Fuel Return line (if required) High Pressure Fuel to Regulator/engine Facility FUEL System Must measure all fuel consumed during the emission events External Fuel Pump Must be supplied by teams needing Fuel Pressure greater than 3-5 psi Facility Fuel Return line Facility Fuel Supply line 3 -5 psi During the In-Service Emission Event The facility's fuel lines must run from the engine to the emission test sleigh Fuel Couplers should be located to provide easy access and allow the cowling to be closed during the In-Service emission test.