Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.

Slides:



Advertisements
Similar presentations
Central Vermont Public Service SOUTHERN LOOP COOLIDGE CONNECTOR Coolidge Connector Community Working Group April 30, 2007.
Advertisements

NTTG Report to TEPPC BiennialTransmission Plan.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Distributed Generation (DG)
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Lisa Grow Vice President, Delivery Engineering & Operations Our Energy Future.
GPA Renewable Energy Resource for Guam Power Authority
Public Service Company of New Mexico
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
NWPP MC Initiative WECC Update March 25th, 2015 Kathy Anderson
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
Conservation & Demand Management July 2004 – September 2007 Joyce McLean Director, Strategic Issues Toronto Hydro
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
Transmission Incentives P. Kumar Agarwal Acting Director, Division of Reliability & Engineering Services Federal Energy Regulatory Commission U.S. DOE,
Montana Ambassadors Helena, Montana February 25, 2011.
Energy Gateway Gateway West Project Gateway South Project
Rocky Mountain Power Load Growth and Network Planning April 27, 2007 Mark Adams.
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
Turkish Power System Overview March 2012
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
1/20 ea technology MicroCHeaP: Month 24 meeting Athens Work Package 4 presentation 21 September 2006 Presented by Yvonne Dickson Partners in power asset.
Joint Outreach Team Implementation Plan July 12, :30-11:30 a.m.
Transmission for a 33% RPS Keith E. Casey Vice President Market and Infrastructure Development California ISO The Independent Energy Producers Association.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
APS Overview Richard Nicosia. APS Snapshot Largest and longest serving electric utility Operations dating back to th largest employer headquartered.
California Independent System Operator Joint Agency Energy Action Plan Meeting Generation Interconnection Queuing & Streamlining Dennis Peters, Lead Interconnection.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
Montana Energy Summit April 22, 2008 Ancillary Service – Regulating Reserves.
SPP.org 1. Southeastern Inter-Regional Planning Update (SIRPP) Entergy Transmission Summit August 11, 2009 Astor Crown Plaza New Orleans, Louisiana.
October 6, 2006 Public Stakeholder Review Portland, Oregon Conditional Firm.
PJM © 2006 The Institute for Regulatory Policy Studies Illinois State University Conference May 12, 2006 Jeff Bladen PJM Interconnection.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Congestion Hedging Process Transmission Planning Summit September 21-22, 2011.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
AB 32 Update December 6, Outline Cap and Trade Program 2013 Update to Scoping Plan Looking ahead to
Planning Commission Study Session: Preferred Plan July 23, 2015.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
LS Power LS Power is a power generation and transmission group
Creating a Sustainable Energy Future Alex Glenn State President Progress Energy Florida, a subsidiary of Duke Energy.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Study Plan Development & Approach May 5, 2010 Conference Call & Webinar “To ensure efficient, effective, coordinated use & expansion of the members’
“Other” Cost Estimates
Transmission Planning Attachment K Public Input Meeting
2017 Integrated Resource Plan
SunZia Project Description
Rates & Regulatory Updates
BHP 2015 Formula Rate True-Up Meeting
BHP 2017 Formula Rate True-Up Meeting
Idaho Power Transmission System
PacifiCorp Overview Choose from three different title slide designs by selecting “New Slide.” These slides are suitable for business and community presentations.
Presentation transcript:

Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning

© 2000 PACIFICORP | PAGE 2 PacifiCorp Energy Gateway Program Update –PacifiCorp Overview –Energy Gateway Foot Print –Energy Gateway Program Overview and Update –Energy Gateway Base Case Analyses –Key Issues and Next Steps

© 2000 PACIFICORP | PAGE 3 PacifiCorp Overview –Customers (million) 1.7 –Annual Call Volume (millions) 5.7 –Number of Meters (millions)1.8 –Retail Energy Sales (TWh) 53 –Generating Capacity (MW) 9,286 –Line Miles 77,000 –Substations 900 –Number of Employees 6,500

© 2000 PACIFICORP | PAGE 4 System Load and Resource Balance* * December 18, 2008 public IRP presentation

© 2000 PACIFICORP | PAGE 5 Energy Gateway Program Overview –1900+ miles of high voltage transmission –~$6.0B invested over 10 years –Key segments in service by 2014 –Design “hub and spoke” concept –Options to transport Generation  Wind  Thermal  New and Existing –Planned to support up to 3000 MWs capacity –PacifiCorp’s network allocation targeted at 1500MWs

© 2000 PACIFICORP | PAGE 6 Interdependency of 500 kV facilities –Current system 230 and 345 kV –No 500 kV in footprint –Need “n-1” backup –(1) Energy Gateway West  Aeolus to Populus –(2) Energy Gateway South  Aeolus to Mona 1 2

© 2000 PACIFICORP | PAGE 7 Energy Gateway Progress Update –Technical  Issued Phase 1 rating report for key Energy Gateway segments – 11/21/08  Obtained Phase 2 rating approval for Populus-Terminal Line (Segment B) –Commercial  Completed revised permitting agreement with Idaho Power  Completed equity offering and open access service offering –Siting and permitting  Community and landowner events  Mona – Oquirrh draft EIS – April 09  Energy Gateway West draft EIS – Dec. 09 –Regulatory  FERC incentive rate declaratory order – 10/21/08

© 2000 PACIFICORP | PAGE 8 Energy Gateway Base Case Analysis Gateway West Gateway South Gateway Central

© 2000 PACIFICORP | PAGE 9 Base Case Generation Assumptions – Phase I –WECC Phase I Comprehensive Progress Reports for Gateway West and Gateway South completed - November 21, 2008 –3 base case scenarios were included in the analysis:  Scenario 1a / 1b - Evaluated the system under a wide range of thermal vs. wind resource conditions based on the following assumptions: oWyoming high thermal and moderate wind resources based on the 2007 PacifiCorp Integrated Resource Plan. oHigh wind and moderate thermal resources modeled in (1b) base case based on OASIS queue requests and projections  Scenario 1c: Developed to evaluate the southern Utah transmission system (TOT 2C/2B) and Mona South path under simultaneous S to N flow conditions. –Gateway West (West of Bridger) utilized the Case 1a base case –Gateway West (East of Bridger) and Gateway South utilized all three base cases. –Ultimately, specific economic and technology evaluations and siting/permitting processes will need to run their course before specific resources that will be served by the Gateway Project are determined.

© 2000 PACIFICORP | PAGE 10 Wyoming Base Cases 1a vs. 1 b Comparison

© 2000 PACIFICORP | PAGE 11 WY 2015 Case 1a – High Thermal / Moderate Wind

© 2000 PACIFICORP | PAGE 12 WY 2015 Case 1b – High Wind / Moderate Thermal

© 2000 PACIFICORP | PAGE 13 WY 2015 Case 1c – High Southern UT S-N Path Flows

© 2000 PACIFICORP | PAGE 14 Key Issues and Next Steps Key Issues: System is planned at 3000MWs; scalable Decision to deliver 1500MWs needed shortly to maintain engineering and permitting schedules Rigid delivery structure is necessary to maintain schedule Customers and equity partners have declined participation opportunities US Government participation a possibility Resource support (capacity and energy via ancillary services) will be necessary Next Steps: Mona – Oquirrh draft EIS – April 2009 CPCNs – July 2009 Gateway West draft EIS – December 2009 Mona – Oquirrh final EIS – December 2009

© 2000 PACIFICORP | PAGE 15 Questions? Energy Gateway website