David Cussans/Scott Mandry, NIKHEF, October 2008 TLU v0.2.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
Developing the Timepix Telescope Planning a Future Timepix Telescope Richard Plackett – VELO Testbeam Meeting CERN, 7th October 09.
Uli Schäfer 1 JEM PRR Design changes Post-FDR tests FDR issues.
Slide 1 FEC Software 21 April 2004 R.Stone Rutgers University Pixel FEC Workshop.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
Status of the Optical Multiplexer Board 9U Prototype This poster presents the architecture and the status of the Optical Multiplexer Board (OMB) 9U for.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
16/27/2015 3:38 AM6/27/2015 3:38 AM6/27/2015 3:38 AMTesting and Debugging Testing The process of verifying the software performs to the specifications.
LKr readout: present and future R. Fantechi 30/8/2012.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
PP2 Status F. Bellina. Problem solved.. Problem with inhibit and reading temperature and many crazy behavior Solved with a new FPGA firmware: the hardware.
Emlyn Corrin, DPNC, University of Geneva EUDAQ Status of the EUDET JRA1 DAQ software Emlyn Corrin, University of Geneva 1.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
(More) Interfacing concepts. Introduction Overview of I/O operations Programmed I/O – Standard I/O – Memory Mapped I/O Device synchronization Readings:
Station Board EVLA F2F Meeting: December Dave FortEVLA F2F Meeting: 11/12 December Outline Station Board Review Station Board Status Delay.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
11 October 2002Matthew Warren - Trigger Board CDR1 Trigger Board CDR Matthew Warren University College London 11 October 2002.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
UCLA Group Meeting May 01, 2014 Andrew Peck Shayan Rastegari 1 Updates from Lab Andrew Peck & Shayan Rastegari May 01, 2014.
C. Combaret DIF_GDIF_MDIF_D ASU 6x 24 HR2 ASU USB Hub RPi USB2 DCC SDCC RPi USB 1 hub+Rpi for 4 cassettes 1 DCC for 8 cassettes (1 spare) Trigger.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
PROJECT - ZYNQ Yakir Peretz Idan Homri Semester - winter 2014 Duration - one semester.
ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013David Cussans, AIDA WP9.3, DESY1.
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
Samuel Silverstein Stockholm University CMM++ firmware development Backplane formats (update) CMM++ firmware.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 - Data Acquisition Status Report Daniel Haas DPNC Genève Extended SC Meeting 1 Sep 2008.
ZPD Project Overview B A B AR L1 DCT Upgrade FDR Masahiro Morii Harvard University Design Overview Progress and Changes since CDR Current Status Plans.
Monday December DESY1 GDCC news Franck GASTALDI.
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
Nov 1, 2002D0 DB Taking Stock1 Trigger Database Status and Plans Elizabeth Gallas – FNAL CD (with recent help from Jeremy Simmons, John Weigand, and Adam.
David Cussans, 18 th October 2006 JRA1 Beam Telescope DAQ and Trigger.
JRA-1 Meeting, Jan 25th 2007 A. Cotta Ramusino, INFN Ferrara 1 EUDRB: A VME-64x based DAQ card for MAPS sensors. STATUS REPORT.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
Talk board status R. Fantechi, D. Gigi, G.Lamanna TDAQ meeting, Mainz
Commands 3/1/ Boot PROM Fundamentals All Sun systems have resident boot PROM firmware Provides basic hardware testing and initialization prior.
ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013 David Cussans, AIDA WP9.3, DESY 1.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Olivier Duarte December th 2009 LHCb upgrade meeting Tests Front-end Status  Necessity.
David Cussans, 18 th October 2006 Status of the JRA1 Trigger Logic Unit (TLU)
17 October 2002Electronics DivisionViraj Perera RAL TCM, GIO, CAN & TTCRx Adam Davis.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
MobiDick4 progress report Carlos Solans. Introduction MobiDICK is a complete test bench for super-drawers Will be used during the maintenance in the long.
AIDA (mini) Trigger/Timing Logic Unit (mini TLU) Introduction Status Plans Summary 21/11/2013David Cussans, AIDA WP9.3, DESY1.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
E. Hazen1 New DCC Status and Plans Jim Rohlf, Eric Hazen, Arno Heister, Phil Lawson, Jason St John, Shouxiang Wu Boston University.
The Jülich Digital Readout System for PANDA Developments
ATLAS Pre-Production ROD Status SCT Version
Microcontrollers, Basics Tips and Tricks with PIC MCUs
Test Boards Design for LTDB
AHCAL Beam Interface (BIF)
Firmware Structure Alireza Kokabi Mohsen Khakzad Friday 9 October 2015
Plans for TLU v0.2.
SEABAS/EUTelescope Integration Idea
AIDA (mini) Trigger/Timing Logic Unit (mini TLU)
Clock & Control Card Status 29 July Martin Postranecky/Matt Warren
Master I/O Connectors PL12 PL14 PL21 PL20 PL17.
Clock & Control Card Status 29 July Martin Postranecky/Matt Warren
University of California Los Angeles
Tests Front-end card Status
Trigger issues for the CALICE beam test
Presentation transcript:

David Cussans/Scott Mandry, NIKHEF, October 2008 TLU v0.2

David Cussans/Scott Mandry, NIKHEF, October 2008 Outline Test-beam experience of TLU v0.1 TLU v0.2 hardware Hardware status Plans. Conclusions.

David Cussans/Scott Mandry, NIKHEF, October 2008 Test-beam Experience TLU used at JRA1 beam-test at CERN Concept “works” Bugs to fix in firmware Trigger number readout broken in fixed- latency version. Enhancements Pre-veto trigger counters (Bonn “fix” ported back to repository

David Cussans/Scott Mandry, NIKHEF, October 2008 TLU v0.2 Hardware Four sets of “Lemo” I/O connectors for DUT ( increased from two )‏ Two sets NIM level I/O Two sets TTL I/O BUSY inputs can be switched between Lemo and RJ45 under s/ware control (was solder- bridge)‏ All outputs can be turned on/off under s/ware control

David Cussans/Scott Mandry, NIKHEF, October 2008 TLU v0.2 Hardware Connector added for future daughterboard to provide clock and control signals to Calice clock-and-control module I2C buses added for slow I/O – easily expandable. More LEDs for diagnostics Connectors added for switches and LCD display Stand-alone operation would need modifications to FPGA board. Would need substantially more firmware.

David Cussans/Scott Mandry, NIKHEF, October 2008 Hardware Status Three modules manufactured. Minor bugs: Correctable by-hand but time-consuming Bug fixed version going for manufacture soon ( O(days) )‏ Switchable termination and thresholds on Lemo I/O removed to reduce cost. Firmware ready... but has same bugs as v0.1 Software modifications needed for I2C

David Cussans/Scott Mandry, NIKHEF, October 2008 Future Hardware Updates Interface to Calice clock and control (C&C) unit Implemented as daughter-board. Could be added to existing TLU v0.2 ( needs new front-panel)‏ Work won't start until requested by other groups.

David Cussans/Scott Mandry, NIKHEF, October 2008 Future Hardware Updates Possible replacement of existing 15V supply for photo-multiplers. Include adjustable control voltage and ADC monitor Interface by I2C. Easy to upgrade existing TLU v0.2

David Cussans/Scott Mandry, NIKHEF, October 2008 Future Hardware Updates Make RJ45 Lemo interface boxes Similar units – Lemo as well as TTL Could then use all six DUT interfaces with Lemo. Will also include DUT_CLK line.

David Cussans/Scott Mandry, NIKHEF, October 2008 Firmware Updates Option for DUT to initiate “busy” by raising DUT_CLK line ( outside a trigger/busy handshake sequence ). “compile-time option” Removes race condition where DUT raising BUSY and then thinks it has suspended triggers and simultaneously TLU sends trigger and thinks that BUSY is raised in response.

David Cussans/Scott Mandry, NIKHEF, October 2008 Firmware Updates Option to switch DUT from “trigger/busy handshake” mode to “receive triggers only” mode. Useful for debugging. Not yet implemented, but minor change. Improve documentation.

David Cussans/Scott Mandry, NIKHEF, October 2008 Future Firmware Updates Code needs a substantial tidy up Code for interface hardware (EZ-USB chip) completely mixed with TLU specific code. Factorize to make it easier to add new modules. Make it easier to run simulations of TLU specific code – fewer bugs before release ( probably! )‏

David Cussans/Scott Mandry, NIKHEF, October 2008 Conclusion TLU is still being developed. Has potential to interface to Calorimeter. daughterboard to support this would be low cost/effort. Need to check if any combination of Calorimeter and beam-telescope / TPC / actually want to run jointly..... First priority is to manufacture more TLU v0.2 and fix firmware bugs.