New Nuclear Plants in the United States

Slides:



Advertisements
Similar presentations
1 Proprietary and Confidential New Jersey Clean Air Council Public Hearing April 1, 2009 Jeff Halfinger Babcock & Wilcox.
Advertisements

New Reactors: NRC Plans, Process, and Progress David B. Matthews Director Division of New Reactor Licensing February 28, 2008.
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
Region II WIN Feb © 2011 Babcock & Wilcox Nuclear Energy, Inc. All rights reserved. A practical, scalable, modular ALWR.
ITER Tokamak Cooling Water System Fusion Power Symposium Washington, DC Tom Coleman AREVA Federal Services December 15, 2011.
Structuring Nuclear Projects for Success An Analytic Framework Presented by: Didier Beutier, Vice President for Economic and Prospective Studies, Areva.
Nuclear Power: Opportunities, Challenges and Solutions Black Sea Energy Conference - April 2006 Ron Cullen General Manager and Project Director Romania.
Federal Energy and Environmental Regulation Agencies and Laws
Supporting Tennessee’s Future Energy Needs… Nuclear Generation Development & Construction Dan Pratt Manager, Pre-Construction Planning March 10, 2009.
1 The Challenges Facing New Generation Capacity An overview and discussion Paolo Gaio Westinghouse International NPP.
UK Nuclear Policy Andrew Beirne
The Case and Requirements for Expansion of Nuclear Energy U.S. Climate Partnership Association Presentation November 18, 2009 Derrick Freeman, NEI Senior.
Licensing Options for the First US Demonstration Fusion Power Plant S. Abdel-Khalik ARIES Meeting, San Diego (February 3, 2008) G. W. Woodruff School of.
NUCLEAR ENERGY What is it? David J. Diamond Energy Sciences & Technology Department February 2009.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative Larry Burkhart, Chief, AP1000 Projects Branch (LB4) Division of New Reactor Licensing NRC’s.
Can Egypt share the Construction of Power Reactors as Korea ?
Mary Alice Hayward Vice President, Strategy, Government and International Affairs AREVA, Inc. Williams Mullen Alternative Energy Forum May 26, 2011 Nuclear.
track # U.S.-Saudi Business Opportunities Forum Jeffrey S. Merrifield Senior Vice President, Shaw’s Power Group.
Westinghouse Non-Proprietary Class 3© 2013 Westinghouse Electric Company LLC. All Rights Reserved. 1 October 2013 Westinghouse Overview and AP1000 ® Plant.
Nuclear Energy in 2013: Status and Outlook Briefing for Czech Technical University Scott Peterson, Senior Vice President Nuclear Energy Institute March.
New Nuclear Power Plants Need and Status ASQ-EED 31 st Energy & Environmental Division Conference September 12, 2004 Adrian Heymer, NEI
Rated # 1 “BEST PLACES TO WORK IN THE FEDERAL GOVERNMENT” Dale A. Powers US Nuclear Regulatory Commission.
WALL STREET UTILITY GROUP The Energy Policy Act of 2005: The Implications for Nuclear Energy 22 September 2005.
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Non-Proprietary Class 3 Kate Jackson Senior Vice President, Research & Technology.
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
Westinghouse Non-Proprietary Class 3© 2014 Westinghouse Electric Company LLC. All Rights Reserved. 1 Attie Ferreira & Prof. Itumeleng Mosala Westinghouse.
Westinghouse Operational Experience and Prospects for New Build
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
PBNC- 1 Overview of US Nuclear Energy Initiatives /06- 1 Harold McFarlane President American Nuclear Society.
Nuclear Power Plant New Build Activity: A Market Overview
A NUCLEAR RENAISSANCE Ping Wan The Tenth Nuclear Utility Meteorological Data Users Group Meeting June 2005.
Nuclear Power Development History and Self-Reliance Practice in China August, 2013 Rio, Brazil.
The Pleasures and Pains of Owning and Operating a Geothermal Plant Presented by Garth Larsen PacifiCorp -Plant Manager Blundell Geothermal Plant.
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
Atoms for Peace +50 Andy White – President & CEO, GE Nuclear Energy.
The Resurgence of the Nuclear Industry Angie Howard Nuclear Energy Institute April 23, 2009.
New Nuclear Generation Ellen Ruff President, Duke Energy Carolinas.
Nuclear Industry QA Initiatives and Opportunities ASQ Southern Jersey Section October 22, 2008 Dinner Meeting October 22, 2008 Dinner Meeting Tom Mudge.
New Reactor Construction Inspection
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
International Relations (9) Nuclear Power in ROK 김 병 구
New Reactor Licensing R. William Borchardt Director, Office of New Reactors US NRC February 19, 2008.
Vogtle Nuclear Plant Update Moderator: Honorable Greg White, Michigan Panelists: Honorable Lauren “Bubba” McDonald, Georgia Public Service Commission Buzz.
A Mid-Process Review Marilyn C. Kray Vice President, Exelon Generation President, NuStart Energy Development Regulatory Information Conference March 10,
Westinghouse Non-Proprietary Class 3© 2015 Westinghouse Electric Company LLC. All Rights Reserved. 1 Graham Cable Vice President, New Plant Development.
PP571.1 The Prospects for New Nuclear Construction Eugene S. Grecheck Vice President Nuclear Support Services ANS Virginia Section Meeting March 16, 2004.
Adding Nuclear Power to the Grid ASQ Energy and Environmental Conference August 28, 2006.
© 2008 Dominion Building New Nuclear Plants: Are Utilities Ready? Wisconsin Public Utility Institute Advances in Nuclear March 26, 2008 Eugene S. Grecheck.
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
Nuclear Energy 2016: Status and Outlook
1 Nuclear Power Technology Development Westinghouse View Kiev March 2012 Dr. Nick Shulyak AP1000® is a registered trademark in the United States of Westinghouse.
Nuclear Energy in 2013: Status and Outlook Paul Genoa Senior Director, Policy Development Nuclear Energy Institute Florida Senate Committee on Communications,
New Plant Regulatory Issues Kati Austgen Washington International Representatives Meeting July 12, 2012.
The Resurgence of the Nuclear Industry Angie Howard Nuclear Energy Institute April 23,
SNC/SCANA – New Build Configuration Management
CR3 and Crystal River Energy Complex
Thomas MAZOUR IAEA, Div of Nuclear Power/NPES
Nuclear Power Update for The Society of American Military Engineers
Plant Vogtle Units 3 and 4 Alex Thirkell.
NEI Perspectives on Small Modular Reactors
Dr. Nils J. Diaz 28th Annual Bonbright Center
Adding Nuclear Power to the Grid
Overview of Vogtle Nuclear Power Plant
Anna Bradford, Deputy Director Division of New Reactor Licensing
Panel Session 3 Small Modular Reactors Chairman: Prof Johan Slabber.
NuScale Micro-Reactor Technology
NUCLEAR ENERGY What is it?
Presentation transcript:

New Nuclear Plants in the United States AP1000 Standard Design: Ready for the Nuclear Renaissance The Current Status of New Nuclear Plants in the United States George Davis Westinghouse Electric Company

New Nuclear Plants Being Planned or Built to Help Improve the Environment Issues driving interest in nuclear energy: Avoiding emissions Providing reliable, economic base-load electricity generation Improving energy security Reducing energy imports Re-building U.S. manufacturing infrastructure Creating export opportunities Construction of new nuclear plants underway overseas Regulatory approval of new plants underway in the U.S.

New NRC Licensing Process Will Be Completed Before Construction Begins Early Site Permit (ESP) Combined Construction & Operating License (COL) Construction ITAAC met Operation Design Certification

Current and Planned License Applications for New Nuclear Plants Source: Nuclear Regulatory Commission

Source: Nuclear Regulatory Commission

Source: Nuclear Regulatory Commission

Westinghouse Has Orders for 8 AP1000 Units – So Far China Projects (w/ first unit operational in 2013): Sanmen (2 units) Haiyang (2 units) U.S. Projects (w/ first unit operational in 2016): Vogtle (2 units) Summer (2 units) Both U.S. projects pending state regulatory approvals Contracts for remainder of U.S. projects (10 units) in varying stages of negotiation

AP1000 Construction Underway at Sanmen Site in China Excavation commenced in February 2008 First concrete scheduled for March 2009 Commercial operation scheduled for November 2013

Machining of Heavy Component Forgings in Korea RV-Transition Ring SG-Lower Shell SG-Tubesheet Westinghouse has begun manufacturing at Doosan for China projects Westinghouse has the long-lead materials on order for China projects RV-Lower Shell

Containment Vessel Plate Fabrication in China Westinghouse has built a global supply chain for China projects This supply chain is localized in China Westinghouse partners are also transferring technology

Simplification of Design, Using Passive Features, Improves Safety Typical PWR AP1000 Passive Systems dramatically reduce the number and complexity of active systems. Containment Cooling is accomplished by air and water cooling of the freestanding steel containment vessel. Air cooling enters vents at the top of the shield building. It travels down to the bottom of the air baffle and then up between the baffle and the containment shell. The air exhausts at the center of the shield building roof. Air cooling is supplemented by water cooling from a large tank of water above the containment vessel. No operator action is required. 72 hours of containment water cooling is provided in the PCS tank. No safety-related AC power is required (Diesels) Actuation and monitoring functions are provided from safety-related batteries. The digital protection system activates a few safety related devices. Operator action is not required.

Simplification Reduces Costs to Build and Operate AP1000

Modularization Reduces Construction Schedule and Risks Pump/Valve Module Module Type Structural Piping Mechanical Equipment Electrical Equipment TOTAL Number 122 154 55 11 342 Structural Module Raceway Module Depressurization Module

Issues Important to Nuclear Energy Continued public and political support Stable regulatory environment Availability of financing Management of used fuel Expansion of manufacturing infrastructure Training of construction workforce State-level programs that support long-term, stable generating options Equal treatment with other non-emitting technologies