EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.

Slides:



Advertisements
Similar presentations
MEDICIS : status, plans, interlocks and coactivity with ISOLDE ISOLDE ISCC 13 February 2015 Stefano Marzari EN-STI-RBS.
Advertisements

Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Beta Beams Safety issues and WBS E. Benedetto and E. Wildner EUROnu Safety Workshop 9-10 June 2011, CERN Outline Introduction: the Beta Beams Tentative.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Richard Catherall EN-STI 2 nd February 2011 ISCC Technical Report & Report from the Standing Group for the Upgrade of ISOLDE.
24 January 2001J. Lettry1 ISOLDE Introduction –PSB-beam, Targets –Ion-sources Facility performance –Front-ends and robots –Target production –Safety.
ISOLDE Technical Report & Long Shutdown Works ISCC Meeting 28 th January 2013 Richard Catherall EN-STI.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Update on the Laser Beam Line
Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Mu2e Mu2e Remote Handling Review Comparisons: Costs, Risks & Maintainability Ryan Schultz Deputy L3 Manager Target Station 3/3/2015.
An Integrated Remote Target Handling System for CERN’s MEDICIS Radioactive Isotope Production Facility Keith Kershaw, Stefano Marzari, Jean-Louis Grenard.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
HIE-ISOLDE Workshop: The Technical Aspects Target Area Infrastructure Ventilation 29 November 2013 Andrea Polato* - CERN EN-CV-PJ * The research project.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
A technical proposal for the consolidation of the LHCA cryogenic elec/control system for the HL-LHC era. 07/10/2017 Simon MARTIN Marco PEZZETTI Simon MARTIN.
Linac4-PSB 160 MeV connection readiness review
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
CBETA Technical Review
Richard Catherall EN-STI 2nd February 2011
AD consolidation activities in LS2
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
XFEL Vacuum System Commissioning
ISOLDE Front-End design review – Details of previous faults
YETS Dec 2017 – March 2018 LS Experiments requirements / Services (un)availability F.Butin / EN-EA EACM meetings outcome, thanks to all participants.
Alexander Herlert, CERN (PH-SME-IS)
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
HIE-ISOLDE Project: Planning & Resources
Report on HIE-ISOLDE Status
Experimental Areas – LS2 planning
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Polarized 3He target installation
Presentation transcript:

EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI

Outline  Introduction  Presentation of the interventions  Calendar of the LS1 at ISOLDE  Conclusion

Introduction  The long shutdown 1 (LS1) at ISOLDE will enable us to carry out various interventions in the facility  Routine interventions  Repairs  Maintenance  Upgrade of the facility  In the target area, labs, class A lab, experimental hall, …  ISOLDE  EN, PH, BE, TE  LS1 prepared in collaboration with several departments

Presentation of the interventions  Target area (building 838):  Handling and transfer of the targets from the target area to ISR 3  Replacement of the robots  Relocation of the services (ventilation, ducts, cooling system, electrical cables)  Repairs of the extraction electrode mecanism  Maintenance of the Front-Ends  Connection of the High Voltage and radiofrequency supply  BTY pick ups  Replacement of the shielded shelves  Installation of the RCS (Rail Conveyor System)  Proton beam alignment with the SEMGRID target

Presentation of the interventions  Building 179:  Post mortem analysis of the target NaF #478  Smear tests on the target BeO #396  Maintenance of the pumpstands  PAD/MAD installation  Hot cell and RABIT dismantling  Civil engineering of the new MEDICIS lab  Experimental hall (building 170):  Exchange of the laser windows  Work on the lasers  RFQ cooler realignment  Consolidation of ISOLDE slits  HIE ISOLDE works  Laboratories and other activities

Handling and transfer of the targets  Transfer from the target area to the ISR 3  Lowered type A container and remote controlled pedestrian stacker  Done on weekend to limit risks  Positioning of the box containing the targets in the ISR 3  First intervention to reduce the dose rate in the target area

Replacement of the robots  Installation of the shieldings and the cover plates  Decrease the dose rate before interventions > January Dismantling of the old robots, rails, cables, robot control room … Installation of the new rails, robots, … on the ceiling Installation of a cabling interface box In collaboration with EN-HE and EN-STI-TCD

Relocation of the services Assumed by EN-CV et EN-EL  Ventilation ducts, cooling system and cables are in the way of the new rails (GPS side)  Need to modify their layout in order for the new rails to have enough space to be installed

Repairs of the extraction electrode mecanism  Due to a problem on the electrode in 2012 (GPS Front- End)  Possibility to do the same repairs on HRS Front-End as a preventive maintenance

Maintenance of the Front-Ends  Annual preventive maintenance  Electrode removal  Lubrication  Cleaning  Visual inspection

Connection of the High Voltage and radiofrequency supply GPS Front-End  Installation of 2 new cables  1 for high voltage  Connect it on an existing connector  1 for radiofrequency  Install a new connector before connection  In order for the “RF source” targets to be compatible with both GPS and HRS Front-Ends Intervention made depending on the collective and individual dose

BTY pick ups  Dismantling of the 2 pick-ups  Dismantling of one pick-up’s transition chamber  Modification of the electronics, reassembly  Vacuum test  Reassembly on the BTY line then put under vacuum In Building179 Assumed by BE/BI

Replacement of the shielding shelves  Design, build and test a new shelf system dedicated to target storage inside the target area  Micro-switches indicating (in the robot control room) the occupation of each individual shelf space  Modification of the door controls (electrical control, electrovannes put outside to facilitate interventions in case of failure) In collaboration with BE/OP

Installation of the RCS (Rail Conveyor System)  Preparation of the Faraday Cage HRS  Installation of the rails to the dump RCS can be used for new cameras

Proton beam alignement with the SEMGRID target  Check of the proton beam position on the target once the PS Booster is restarted (16 th June 2014)  Corrections of the position if needed

Layout  Building 179:  Post mortem analysis of the target NaF #478  Smear tests on the target BeO #396  Maintenance of the pumpstands  PAD/MAD installation  Hot cell and RABIT dismantling  Civil engineering of the new MEDICIS lab  Experimental hall (building 170):  Exchange of the laser windows  Work on the lasers  RFQ cooler realignment  Consolidation of ISOLDE slits  HIE ISOLDE works  Laboratories and other activities

Post mortem analysis and smear on targets  Post mortem analysis on a target following a short cut  Improvement of the next set of targets of the same type  Post mortem analysis under a fume cupboard in the class A lab  Smear on a target  Is there any accumulation or a diffusion of isotopes on the surface ?  Know the composition  Smear under a fume cupboard in the class A lab

Maintenance of the pumpstands Performance of the oil pumps decreases throughout the year  Changing the oil of the 2 pumps  Contaminated oil but no dose rate  Put a special protection cover in order to protect the connections

PAD/MAD installation In charge: GS-ASE-SSE CHECK POINT RP PAD KEYS MMAD MAD

Hot cell and RABIT dismantling  Current RABIT will be replaced by a new one, dedicated to CERN-MEDICIS  Current hot cell will be replaced by a new one enabling the dismantling of actinide targets

Civil engineering of the new MEDICIS lab Buffer area RCS Mass separator New target storage New hot cell Recuperation of dumped protons for the production of medical isotopes

Layout  Building 179:  Post mortem analysis of the target NaF #478  Smear on the target BeO #396  Maintenance of the pumpstands  PAD/MAD installation  Hot cell and RABIT dismantling  Civil engineering of the new MEDICIS lab  Experimental hall (building 170):  Exchange of the laser windows  Work on the lasers  RFQ cooler realignment  Consolidation of ISOLDE slits  HIE ISOLDE works  Laboratories and other activities

Exchange of the laser windows  Laser ionisation is used for a lot of experiments at Isolde  laser passes through a window made of quartz in the separator magnets. Windows become opaque both because of the laser beam and the lost secondary beam  To ensure an efficient laser ionisation  windows are replaced each year  In the separator areas (GPS and HRS)  Protection of orings from laser light needs to be integrated

Work on the lasers  Extension of RILIS cabin  Modification of the HRS laser window holder  Make an extension tube for mounting the window outside magnet  To replace the removal tool  Easy to inspect, easy to replace  RILIS machine protection system  GPS laser beam launch  New laser for non-resonant ionization  New and improved RILIS schemes for the Dual RILIS system In charge: BE-OP and EN/STI/LPC

RFQ cooler realignement  RFQ cooler’s internal components are not aligned  Affects the beam transport  Correction of the alignement of the RFQ cooler’s internal components  Checking of the internal electrodes  Calibration of helium buffer gas valve

Consolidation of ISOLDE slits  Electronics of the controller, motors and resolver doesn’t work  Fabrication  Removal of the pieces of equipment  Replacement In collaboration with: EN/STI/ECE

HIE ISOLDE works  Upgrade of the demineralized water system  Cabling  Safety system installation  Arcon  RAMSES  Fire detection  Start of the cryogenic system installation  Services, magnets and beam diagnostic installation  Linac tunnel installation We are involved in :

Layout  Building 179:  Post mortem analysis of the target NaF #478  Smear on the target BeO #396  Maintenance of the pumpstands  PAD/MAD installation  Hot cell and RABIT dismantling  Civil engineering of the new MEDICIS lab  Experimental hall (building 170):  Exchange of the laser windows  Work on the lasers  RFQ cooler realignment  Consolidation of ISOLDE slits  HIE ISOLDE works  Laboratories and other activities

Laboratories and other activities  Dismantling of the 26/R-042 (old class C lab) and installation of a new fume cupboard  Marie Curie activities  FE assembly, RFQ, off line assembly  2 new tape stations  Pump stand x 2 (building 3)  Off line maintenance  Pill press  Target development  Lead Bismuth loop  Uranium carbide  New materials  Nano lab

LS1 calendar at ISOLDE 2013 March April May Post mortem analysis and smear on targets Handling and transfer of the targets from the target area to ISR 3 Shieldings, Cover trenches Hot cell dismantling Start of the civil engineering of the new MEDICIS lab June BTY pick ups August Robot dismantling Relocation of the services September October New robots installation Replacement of the shielding shelves November Maintenance of the pumpstands December PAD/MAD installation

LS1 calendar at ISOLDE 2014 January Dismantling of the robot control room Installation of the new RABIT FebruaryNew hot cell installation March RFQ cooler realignement Repairs of the extraction electrode mecanism Maintenance of the Front-Ends Adding of the RF on the HRS Front-End (?) Exchange of the laser windows April May Cold check out JuneBeam test alignement with the SEMGRID target

Conclusion  LS1 will enable us to upgrade a large part of the facility  Several sections of the EN/STI group and several other departments will work in collaboration in order to manage all the interventions  Collective and individual doses will be reduced as much as possible and estimated thanks to the establishment of WDP  15 WDP under preparation  Safety during operations will be optimized and people will be informed