March 10, 2015 Second Public Hearing 1.  Workshop proposed ULDC changes: 1/27/15  Request to Advertise: 1/27/15  First Public Hearing: 2/24/15  Second.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

Alachua County Plat Review Process July 10, 2012.
General Provisions Affordable Housing Signs Transfer of Development Rights 2009 ULDC Update September 8,
BOARD OF COUNTY COMMISSIONERS DECEMBER 11, 2012 CELEBRATION POINTE COMMUNITY DEVELOPMENT DISTRICTS.
CBJ Planning Commission Presentation November 9, 2010 Subdivision Ordinance Revision Update.
2007 Council Directive “Review and make decision on a proposed sign ordinance.” Use the 1990 draft sign ordinance as a starting point.
Zoning Ordinance Update Planning Commission February 25, 2015.
Proposed Modification of Policies for Rural Employment Centers Policy 6.3 of the Future Land Use Element of the Alachua County Comprehensive plan CPA
Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.
Fences, Walls and Drinking Establishments City Council Public Meeting July 7, 2015.
General Provisions Affordable Housing Signs Wildfire Mitigation Transfer of Development Rights 2009 ULDC Update.
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
Sector Planning Process Alachua County Commission July 8 th,
February 24, 2015 First Public Hearing 1.  Workshop proposed ULDC changes: 1/27/15  Request to Advertise: 1/27/15  First Public Hearing: 2/24/15 
B IG I DEAS part 2 May 19, 2014 City of Duluth Unified Development Code.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Public Workshop March 20,  EAR-based Comprehensive Plan update adopted April 5, 2011  Working with Revised Code since 2006 – clarifications.
Amendments to the Unified Land Development Code Final Adoption Hearing April 22, 2008.
Board of County Commissioners PUBLIC HEARING January 5, 2010.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Planning Area Standards May 18, Outline of today’s meeting Introductions Recap of previous community meetings Planning Area Standards Discussion.
ZOM Major Amendment to Arbor Greens PD. Overview Arbor Greens PD site +/- 152 ac Amendment request summary –Extension of buildout date from 2014.
Board of County Commissioners PUBLIC HEARING Lake Avalon Rural Settlement Commercial Design Overlay District March 10, 2009 Board of County Commissioners.
ZOM Newberry/122 nd St. PD. Applicant Request Applicant is requesting a rezoning from RE-1 (single-family residential) to PD (non-residential planned.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Wakulla County Board of County Commissioners August 18, 2008 Workshop Off-Premise Sign Existing Regulations & Proposed Changes Workshop Off-Premise Sign.
First Public Hearing February 10,  Board of County Commissioners direction of April 2008 to assess efficiency of development review process and.
Second and Final Public Hearing February 24,
Zoning and Subdivision Ordinance Update Board of Supervisors Work Session February 22,
Updates to Title 8. Anticipated Timeline… July - December 2013 Ideas Compiled Research and Drafting January 2014 Planning Commission Worksession Review.
Oakmont at Gainesville, LLP CPA Location Map.
Proposed Amendments to Chapter 32 Article V Solid Waste Management and Chapter 38 Zoning 2:00 P.M. Public Hearing Presented by the Orange County Environmental.
Large-Scale Comprehensive Plan Amendment Adoption Hearing October 23,
 This is a privately initiated request to amend Chapter of the ULDC. The primary request is to reduce required setbacks from the property line.
FEBRUARY 21, 2012 BCC PUBLIC HEARING ON BZA # SE , Nov. 03, 2011 APPELLANT/APPLICANT: CHANTEL PRESTON.
ADOPTION PUBLIC HEARING DONATION BIN ORDINANCE Zoning Division June 24, 2014.
Amendments to the Unified Land Development Code Section Multifamily Residential Requirements Section (d) – Planned Developments with Transfer.
ZOM A request for a minor amendment to the existing South Pointe PD (Planned Development) 110 acres West Newberry Road.
November 11, 2008 BCC PUBLIC HEARING ON BZA #SE , September 4, 2008 APPLICANT/APPELLANT: Christian Haitian Church, Inc.
June 9, 2015 Public Hearing 1.  NUE Urban Concepts, LLC on behalf of Celebration Pointe Holdings, LLC  Amendments to Chapter 404 Use Regulations Article.
FIRST PUBLIC HEARING DONATION BIN ORDINANCE Zoning Division June 3, 2014.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
February 12, 2013 Alachua County Board of County Commissioners.
April 14, 2015 Second Public Hearing 1.  Workshop proposed ULDC changes: 1/27/15  Request to Advertise: 1/27/15  First Public Hearing: 2/24/15  Second.
Floodplain Management Ordinance Public Hearing September 22, 2009 Floodplain Management Ordinance Public Hearing September 22, 2009.
Request to Advertise January 27,  Board of County Commissioners direction of April 2008 to assess efficiency of development review process and.
Request to Amend the Alachua County Unified Land Development Code Chapter
Community Development Department Special Exception Vehicle Rental and Leasing St. Joe Plaza.
Public Workshop May 14, 2013 Alachua County Board of County Commissioners.
Alachua County Plat Review Process September 9, 2008.
STAKEHOLDERS MEETING JKV- OAK PARK JANUARY 15, 2016 Orange City Sign Code Review 1.
Alachua County Plat Review Process January 26, 2010.
SITE. Preservation/’C-1’ Zoning Rural/Agricultural ‘A’ Zoning.
Public Hearing Seattle Ridge Preliminary Plat/ Planned Area Development PP December 18, 2013.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
LAND Subdivie a 4.27 acres into 18 lots 17 detached single family homes One duplex Base density allows for unit Affordable housing bonus.
Alachua County Plat Review – Greenbrier Subdivision February 24, 2009.
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
G & A Lloyd, LLC ZOM Location Map. G & A Lloyd, LLC ZOM Aerial.
Public Hearings D10, E11, F12 March 26, Today’s Public Hearings D C-TRAN-2 Comprehensive Plan amendment adoption E C-TRAN-1 Comprehensive.
Board of County Commissioners PUBLIC HEARING Village Planned Development Code (Horizon West) June 2, 2009 Board of County Commissioners PUBLIC HEARING.
Board of County Commissioners Presented By the Orange County Public Works Department November 18, 2008 Revisions to the Subdivision Regulations.
VILLA AMADOR VICINITY MAP. CASE SPECIFICS Subject properties encompass ± acres –Entails 10 parcels of land –Located south of Amador Avenue, west.
Urban Runoff Pollution Ordinance 2017 Proposed Update
“Palm Coast 145, LLC” Comprehensive Plan Amendment & Rezoning Planning and Land Development Regulation Board December 21, 2016.
ZONING CODE UPDATE ADMINISTRATION AND PROCEDURES
Chapter 4 Osceola County Land Development Code (LDC)
Planning Commission January 20, 2016
Board of County Commissioners
Presentation transcript:

March 10, 2015 Second Public Hearing 1

 Workshop proposed ULDC changes: 1/27/15  Request to Advertise: 1/27/15  First Public Hearing: 2/24/15  Second Public Hearing: 3/10/15 2

 Propose Comprehensive Plan language for limited industrial uses related to wood processing in Rural/Agriculture land use  Create allowance for Mobile Food Trucks  Provide more flexibility for design of pedestrian sidewalks in TNDs.  Define masonry as relates to requirements for walls or screening 3

 Comprehensive Plan language adopted January 27th  Amend recently adopted Wood Processing Facility code by: ◦ Allowing processing of treated wood products ◦ Limiting square footage of buildings associated with wood processing facility unless otherwise approved by BoCC ◦ Allowing BoCC to determine whether the facility must be on a paved public road ◦ Requires Special Exception approval by BoCC 4

 Added Mobile Food Sales as a new use on the Use Table in Chapter 404  Created requirements in Code: ◦ Permit from Growth Management Department ◦ Site requirements including placement, sales, hours of operation ◦ Not allowed on vacant lots  May revise further in the future following outcome of Gainesville’s process and review by stakeholders 5

In the Transit Supportive Area sidewalks shall be provided on both sides of streets. The DRC may approve a cross-section that includes a sidewalk on only one side of a street in limited situations where a single sidewalk would not reduce pedestrian circulation. Streetscape elements within the Transit Supportive Area shall include pedestrian scale lighting, street furniture, waste receptacles, locational maps, planters and street trees. Required minimum sidewalk widths are clear widths and additional width may be required to provide streetscape elements. 6

7

8

 Where screening is required or proposed in conjunction with a project boundary buffer...it shall consist of:  a.a minimum six foot tall masonry wall, such as brick, stone, granite, concrete block or concrete panels;  b.a minimum six  foot tall opaque fence,  such as vinyl or wood  (no chain link); 9

 Section (b)2. Demonstration of Good Faith Efforts  An application shall include a demonstration of good faith efforts to comply with applicable time limits by including at least one or more of the following items, dependent upon the type of development order requested for extension:  the completion or status of site development improvements including substantial and on-going site clearing, grading and the substantial and on- going construction of stormwater management facilities, if applicable 10

11 Section Dock Clarified language and added descriptive picture – no new requirements

 Table – removed two plant species from discourage planting list as they are now on the prohibited planting list:  Scratchthroat/coral ardisia and Chinese privet  Section Secondary Open Space ◦ Amended language to clarify that correctly designed stormwater basins may count towards only half of required open space 12

 Combined Sections and (d)  Family Homestead Subdivisions  Added provision that Family Homestead Subdivisions expire within one year of approval if registered survey not recorded  provide owners future assurance of permitting a single family residence  Notice to future owners 13

 Section Exception from Connection to Centralized Potable Water and Sanitary Sewer System Requirement ◦ Changed requirement from posting of a bond or other financial guarantee to recording of a deed to ensure future connection 14

 Section (e)  Additional traffic data. The following additional traffic data collected within one year of final submittal shall be required for class III and class IV connections and may be required by the County Engineer for class II: 15

 Other Access Management Considerations ◦ Revised requirement for left turn lanes ◦ Revised Requirement for deceleration lanes (b)4 Class II, III and IV connections to a two-lane collector or arterial roadway with a posted design speed limit of mph or greater shall require a deceleration lane. Class II connections may require a deceleration taper. Final determination on Class II tapers will be based on proposed land use and safety and operational characteristics at the proposed location. 16

 Section Nonconforming Use of Structure ◦ deleted maximum size requirement for replacement of nonconforming mobile homes  Chapter 410 Definitions  Amended/Added definitions ◦ Entertainment and Rec, Floor Area Ratio, Gross Floor Area, Junk, Wood Processing Facility 17

1. Convene as the Land Development Regulation Commission and find the proposed amendments consistent with the Alachua County Comprehensive Plan as provided in the staff report. 2. Adopt the ordinance amending the Unified Land Development Code. 18