RFP Kickoff Meeting November 19, 2012. Welcome Bidding Requirements Project Requirements.

Slides:



Advertisements
Similar presentations
Piedmont Improvement Program NC Society of Engineers
Advertisements

Replacement of the Queens Approach Bronx-Whitestone Bridge
State Aid Programs An Introduction to: Local Bridge Replacement Program Local Road Improvement.
District 4 Sign Assessment and Replacement Design- Build Project Request for Qualifications Information Meeting April 17 th, 2007.
Metro Muncipal Agreement Program
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
TH 5 Mississippi River Bridge Design-Build Project S.P
State Aid Programs Legislative Issues - Bonding Local Bridge Replacement Program Local Road Improvement Township Sign Replacement Program.
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Application Guidelines Guide Signs
LPA Projects LPA projects Alum Creek Bike Trail $3,200,000 Parsons/Livingston $14,500,000 Riversouth Phase $9,900,000 Lane Avenue $1,700,000 Arcadia.
TIGER PROGRAM LESSONS LEARNED Great PA/NJ Regional Trail Projects Presentation to the Circuit Coalition May 15, 2014 Chris Stanford, P.E., PTOE, PMP Michael.
Roles & Responsibilities in Construction Management
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) Reading Solicitations.
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
PRE-BID MEETING AND SITE WALK D6 Hayward, Elevated Solar Photovoltaic Project 1758 Sabre Street Hayward, CA AC Transit.
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
New York City Department of Education Charter Matching – Facilities Upgrades/ Capital Improvements – FY 2014.
TH 13/101 Design-Build Project S.P October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
TH 169 & I-494 Interchange Design-Build Project S.P January 27, 2010 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
TH 610 Design-Build Project S.P February 25, 2009 Dan W. Penn, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING Looking TH 169.
 Crashes at rural STOP controlled Intersections  Primary cause where drivers stopped before entering:
 Crashes at rural STOP controlled Intersections  Primary cause where drivers stopped before entering:
CMGC Contracting at UDOT Program, Projects & Lessons Learned
TH 55 Mill and Overlay Design-Build Project S.P
MnDOT Metro District State Aid Construction Thursday February 19 th, 2015.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION I-390 Interchange Improvements Design-Build Project (PIN ) City of Rochester & the Town of Brighton,
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028) Saratoga, Warren, and Washington Counties.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Alternative Project Delivery
Draft Lighting Policy Ted Swansegar Cell:
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
ESTIMATING By Laith Jacob.
New York State Department of Transportation
New York State Department of Transportation
Green Light-Go Program Pennsylvania’s Municipal Signal Partnership Program April 7, 2015 Daniel Farley Chief, Traffic Signal and Arterial Management Section.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Work Plan Development Steve Robinson Highway Utility Engineer, INDOT June 11, 2015.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
LPA – Utility Coordination Natalie Parks StructurePoint November 20, 2013.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
2015 Traffic Signals 101 Topic 12 Special Provisions.
New York State Department of Transportation
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
Utility & Rail Coordination in Project Development Jennifer McCleve Utilities & Rail Branch Manager.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Elk Run Interchange Design-Build Project S.P (TH 52) Elk Run Interchange Design-Build Project S.P (TH 52) PROJECT INFORMATIONAL MEETING.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Highway Utility Engineer, INDOT
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
Trivia Certification Program Trivia Mark Foster ODOT Region 1 Liaison and Federal Aid Specialist March 12, 2010.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
Design-Build in Minnesota Minnesota Department of Transportation.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
Heritage Trust Fund Grant Orientation Session. HTF Staff and Contact Information Katrina Ringler Grants Manager ext. 215
Southeast Rail Extension FasTracks Monitoring Committee July 14, 2015.
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Designers’ Manual Overview and Chapter Contents
Administrator of Construction Todd Wilson Senior Project Manager
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
PRE-PROPOSAL MEETING LOGAN WWTF
Presentation transcript:

RFP Kickoff Meeting November 19, 2012

Welcome Bidding Requirements Project Requirements

What is discussed today is informational only, meant to assist interested teams in the pursuit of this project. The ultimate contract requirements will be included in the Request for Proposals (RFP).

Instruction to Proposers

Section 2 Procurement Schedule ATC Submittal Due Date: December 10, 2012 Clarification Submittal Deadline: January 7, 2012 Technical Proposal Due Date: January 10, 2012 Price Proposals: January 21, 2013 Public Opening Date: February 1, 2013 Section 6.4 STIPEND - $20,000

Section 1.4 Project Goals Safety Quality Innovation Schedule and Budget Maintain contract through December 1, 2015 Section 1.5 Change in Proposers Organization Section 1.7 Estimated Cost 30 additional intersections up to $6 million Section 1.8 DBE – 8% (no DBE meet & greet) - No Trainees (OJT)

Section 3.4 – Communication to Ken Hansen Use Clarification Request Form on MnDOT DB webpage Section 3.6- Addenda/Clarification posted to website notice to each team single point of contact ATC – Must be equal of better All areas of contract are open Radar, magnetometer, and other detection need ATC (Book 2, Section 17)

Section – Due between 7:30 and 10 am Section – Follow font sizes Section – Org Chart – Need approval to change from SOQ Section – 100 Points 50 Points for being responsive 35 Points – Quality 10 Points – Exceeding Delay Alert Requirements 5 Points – Reduce 21 day construction time

4.3.1 – Submit Electronically Item NumberItem DescriptionComments MobilizationNot to exceed 5% of the Contract Price Quality Management Includes Test Case 2, Test Case 4, and Test Case 5 of Book 2, Section 17, Exhibit 17-C Design Services Includes all design, survey, utility coordination and geotechnical engineering Electric Lighting SystemsIncludes the installation of intersection lighting Traffic Signs and DevicesIncludes the installation of the RICWS systems Highway-Railroad Grade Crossing Signals Includes boring under the railroad, installing handholes on each side of the railroad R/W, and other costs associated with working on or near the Railroad R/W per the railroad agreement and Contract requirements. Crossing signal installation is not required.

Item/Line No.Description# of SitesUnitItem Total Mobilization * 1Region A - Mobilization2Each$ 2Region B - Mobilization12Each$ 3Region C - Mobilization6Each$ TOTAL (must match item )Lump Sum$ Design Services ** 1Type I - Design15Each$ 2Type III - Design2Each$ 3Type IV - Design3Each$ TOTAL (must match item )Lump Sum$ Traffic Signs and Devices Construction** 1Type I - Construction15Each$ 3Type III - Construction2Each$ 4Type IV - Construction3Each$ TOTAL (must match item )Lump Sum$ * Region A = MnDOT Districts 1, 2 and 4 Region B = MnDOT District 3, 6 and Metro Region C = MnDOT District 7 and 8 ** Type I = 4-Way Intersection (Book 2, Exhibit 1- A) Type III = T Intersection (Book 2, Exhibit 1- C) Type IV = 4-Way Divided Intersection (Book 2, Exhibit 1- D)

Intersection lighting cost per intersection: MnDOT will divide the item (Electric Lighting Systems) by 2 sites. Boring under railroad costs per location: MnDOT will divide the item (Highway-Railroad Grade Crossing Signals) by 4 sites. )

Additional Allowances ItemUnitUnit Cost Region A – MobilizationEach Site$ Region B – MobilizationEach Site$ Region C – MobilizationEach Site$ Type I – DesignEach Site$ Type III – DesignEach Site$ Type IV – DesignEach Site$ Type I – ConstructionEach Site$ Type III – ConstructionEach Site$ Type IV – ConstructionEach Site$ Intersection LightingEach Site$ RailroadEach Site$

Form 6 Not used in BV Selection Only Apparent Best-Value needs to submit Extended Warranty Option 1 – 2017 Option

Book 1 Book 2

No reliance on RID Completion Deadlines (Section 4) 20 intersections by Dec 1, Days for each ID/IQ RICWS All work done by Dec 1, 2015 Final Acceptance 100 Days Warranty Bond of $120,000 (Section 8)

Section 10 - MnDOT shall be considered to have Accepted maintenance liability at each Site which are 100% complete as of such date and accepted of the RICWS turn on test. Contractor must still warrant

Lump Sum Project for bid value Payment per Book 2, Section 2 SOVs Payment on % Complete Additional Intersections (ID/IQ) Up to 30 more or $6,000,000 Not guaranteed ($, quality) Work Authorization per Unilateral Change Order Payment per Exhibit K Timeline per Section 4 Contractor must still warrant

Additional Allowances for ID/IQ 4-Way w/Island = Type I + additional detection Additional signs Power connections per invoice Mounting RICWS on bridges or boring under waterway Additional items requested by MnDOT Inflation factors Contractor must still warrant

Liquidated Damages Warranty Lighting RICWS – All expire on Dec 1, 2016 Warranty Extensions MnDOT to monitor, Contractor may also Threshold Limits Warranty Close-out Turn-over test per Test Case 7 at each Site. LD for re-tests

District# RICWS Metro1 1 st Site: TH 7 & Carver CSAH 33

Design Coordination Meetings In-Progress Design Review (weekly) Over-the-Shoulder Reviews (as needed) Construction Progress (weekly/by-weekly)

Submittals Schedules Quality Manual (Template Provided) Release for Construction Docs Shop Drawings As-Builts Product Data Sheets Material Testing

Right of Way Contractor shall secure R/W maps to confirm R/W in Design RFC and As-Built drawings shall accurately depict R/W from the R/W maps.

As-Builts Require X & Y GPS locations Lighting Units Cabinets Source of Power Handholes Detection Devices Underground cable & Conduit Every Junction Cable as Line Geometry Vertex points every 100ft or change in direction

Lighting (2 Sites) Typical Rural Lighting - 2 cobra head luminaires Separate Conduit from RICWS System Signing Supports Meet 2001 AASHTO Breakaway Requirements

Signing Minor Road: 36x36 8 LED Alternating Flashers 30x24 When Flashing Major Road: 2-Lane 4-Lane W3-X8A W3-X8 48x48 66x42 12 LED Flasher 8 LED Alt Flasher 42x24 When Flashing

Detection Acceptance through ATC Process Electrical Power One service cabinet at each facility – including existing lighting MnDOT will reimburse Utility Service Invoice for connections

Testing (Test Plan – Exhibit 17 C) Integration Demo (Test Case 2) 30 Day Fort Snelling Test Require acceptance of Contractor testing procedure Will hold system at Fort Snelling until completion of Reliability Demo Reliability Demonstration (Test Case 5) 30 Day Caver County LD after 38 Days

Rail Roads 4 of 20 near RR 2 near BNSF and 2 near CP MnDOT will provide RR Agreements and 1 day of RR Flagging Proceeding with agreements using Exhibits 21A-D

Oversight Consultant Design Review Testing (Cases 1, 3, 4, 6, & 7) Construction Inspection Warranty Evaluation University of Minnesota Testing (Case 5)

Ken Hansen ITS Project Manager Office of Traffic, Safety, and Technology (651) Jay Hietpas Innovative Contracting Director Office of Construction and Innovative Contracting (651)

Exhibit B – System Requirements