TC meeting P2 planning wks 7&8 A.Tauro 14-2-2012.

Slides:



Advertisements
Similar presentations
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
Advertisements

TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
Lau Gatignon, EATM, 7 October  The T9 and T10 lines have been running smoothly from mid July and the T11 beam started up very smoothly for CLOUD.
EMCal DCS and related Issues with Shutdown/Installation B. S. Nilsen M. Cherney J. Fujita.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
LS1 planning meeting Activities weeks 13, 14 & 15 22/3/13LS1 planning meeting - A.Tauro2.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
ALICE planning meeting /12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
André Augustinus 16 September 2002 Safety issues.
Dimuon Forward Spectrometer May 2008 Cosmic Run Day by Day report Interesting runs.
DCS - general Unscheduled power cut Wed. morning ( , human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.
winter shutdown preparatory meeting A.Tauro /1/12ALICE winter shutdown schedule - A.Tauro 1.
winter shutdown planning A.Tauro
1 Responsibilities & Planning DCS WS L.Jirdén.
LS1 reference slides LS1 plans Detector’s plans Services and central systems availability 8/2/13LS1 planning meeting - A.Tauro1.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
ALICE 5 o’clock meeting Wk 49
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
P2 status, LS1 planning A.Tauro - W.Riegler. Outline TS2 activities Detector activities during LS1 Proposal for ALICE recommissionig plan in 2014 Conclusions.
TS4 preparatory meeting TS4 – weeks Underground access possible in week 51 – as from Monday morning 9:30 –Ulli and Philippe will start.
winter shutdown preparatory meeting A.Tauro /12/11ALICE winter shutdown schedule - A.Tauro 1.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
ALICE TC meeting – Plans for the next technical stop A. Tauro.
André Augustinus 9 October 2006 Interlocks update.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
winter shutdown planning A.Tauro
winter shutdown planning A.Tauro
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
ALICE planning meeting /2/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
TC meeting P2 planning wks 9&10 A.Tauro
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
ALICE 5 o’clock meeting Wk 49. INDICO You’ll find this meeting here: – The full shutdown planning.
winter shutdown planning A.Tauro /1/12ALICE winter shutdown schedule - A.Tauro 1.
ALICE 5 o’clock meeting Wk 49
TC meeting P2 planning wks 5&6 A.Tauro
TS2 preparatory meeting A.Tauro. General information LHC- TS2: from Monday 31st 6am, to Friday 4th 5pm LHC beam stops on Monday morning.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
25/3/2009Detector Cooling Project Meeting I1 Running consolidation activities of ALICE Detector Cooling Systems A.Tauro.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
TS3 preparatory meeting 14/9/2012 TS3: 17-21/
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
February 26 th 2013Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
TS3 preparatory meeting A.Tauro. General information LHC-TS3: from Mon 9 6am, to Fri 13 5pm LHC beam stops on Mon morning at 6:00.
TC meeting P2 planning wks 3&4 A.Tauro
ACO & AD0 DCS Status report Mario Iván Martínez. LS1 from DCS point of view Roughly halfway through LS1 now – DCS available through all LS1, as much as.
ALICE planning meeting /11/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
André Augustinus P2 events & perturbations 07 May 2010 ALICE Technical Coordination Meeting.
ALICE Installation: Planning Meeting Agenda: 1- ALICE shutdown schedule 2- Miniframe removal sequence.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
ALICE 5 o’clock meeting Wk 51.
TS2 preparatory meeting
LS1 planning meeting - A.Tauro
LS1 planning meeting
Gas system Commissioning procedures and status
ALICE 5 o’clock meeting Wk
TS1 preparatory meeting
LHCb & EYETS
ALICE 5 o’clock meeting Wk
Presentation transcript:

TC meeting P2 planning wks 7&8 A.Tauro

News DSO test postponed to Mar.1 st and 2 nd (it was Feb. 25 th -26 th ) –No access underground, no visits Flammable gases: –MTG: as from Mon 13 th Feb (then stop during SAA3 intervention) –HMP: as from Mon 20 th Feb PH-DT (gas-group): upgrade of the PLC and PVSS codes. The intervention will last about 8 hours –Proposed time: February 27 th Feb 14/2/12TC meeting - A.Tauro

Planning wk7 1/2 Access underground possible only after 17:00 (including Saturday) –Exceptions: TPC, SPD, Muon TRK Fri 17 th Feb. Consolidation 48V network (after incident 11 th Jan 2011) –These test will provoke several power outages (and consequently stop of services like ventilation, cooling etc.). –For ALICE we adopt the same strategy as for the emergency stop tests 2 weeks ago: DAQ, HLT, DCS will be off: –DAQ and DCS between Thu midnight and Fri 8:00 AM; HLT on Thu evening Detector equipment (including gas and cooling) shall be in a state to support power interruptions. We should assume that all power will be cut, including gas and cooling systems (detector cooling, iced and mixed water). Even the SPD, being on UPS, might be cut as the interruption is likely to be longer than the lifetime of the UPS. I leave it to the experts if they want to keep it running until the cut arrives, or if they decide to switch off preventively. DCS will be switched off completely. We would prefer, if operations allow, to switch of on Thursday evening. –No access underground (except for those part of the test, or real emergencies) 14/2/12TC meeting - A.Tauro

Planning wk7 2/2 TPC capacitors  will be finished next week SPD cooling CTP: test clock jitter with both L3 and Dipole magnets (Mon 12:00 to 14:30) Transport + P2tech: Shielding blocks  O-side wall completed, installing I-side green bridge Muon TRK: –Repair slats on ST3-ST4-ST5 ADA: test one Micro-Channel-Plate replacing a traditional PMT TE-VSC: pump-down central beampipe (cont.) GS-ASE: sniffer SW upgrade EN-CV-BE: start-up and commissioning new ITS dehumidifier EN-CV: removal unused FB pipe (I-side) (Mon, need nacelle)  done 14/2/12TC meeting - A.Tauro

Planning wk8 Fri 24 th Feb: no access underground during the all day –Maintenance power transformer EMT306/2X –Maintenance UX25 lift –Maintenance PX24 PAD/MAD TPC capacitors SPD cooling Transport + P2tech: SAA3 + PX24 plug Test UJ22 jig + annual maintenance P2 cranes PMD: move to final position ? Muon TRG: –General global check Muon TRK: –Repair slats on ST3-ST4-ST5 TE-VSC: take out GIS table (Feb. 21 st ) GS-ASE: sniffer SW upgrade EN-CV-BE: start-up and commissioning new ITS dehumidifier (21 st Feb) 14/2/12TC meeting - A.Tauro