Regional Technical Cooperation on Water The Nile Basin Case ByA.M.Farahat Prof. INP, Cairo, Egypt Arab Water Council Representative Istanbul May 3-5, 2011.

Slides:



Advertisements
Similar presentations
Africa is still facing significant development challenges Institutional capacity to adequately improve livelihoods of Africas citizens Systematic pan-African.
Advertisements

European Union Strategy for the Danube Region (EUSDR) -- A World Bank Perspective High-level Meeting on Financing Belgrade, September 27 th, 2010.
URUGUAY’s efforts to address synergies among the Conventions Workshop on synergies and cooperation with other conventions 2-4 July 2003 Espoo, Finland.
Doing More With Less: Mitigation in a Changing Environment Experience in the Nile Basin Larry Brazil Riverside Technology, inc. Doing.
International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany Le Duc Trung Acting Secretary.
1 4 th Rosenberg Biennial International Forum on Water Policy. Transboundary Water Cooperation The Nile Basin Case by Hon. Martha Karua Minister for Water.
Current Context and Evolution towards Institutional Strengthening Nile Basin Initiative International Workshop on Institutional Capacity Development in.
Hydropower Development: Experience of Nepal
1 4 th Biennial Rosenberg International Forum on Water Policy Turkey,7-8 th September,2004 Overview of the Nile Basin Initiative Programs. by Patrick Kahangire,
Sharing Benefits of Transboundary Waters through Cooperation David Grey The World Bank International Conference on Freshwater Bonn, 2001.
“The Nile Basin Initiative" (NBI) Meraji O. Y. Msuya Executive Director, NBI Secretariat Freshwater Basin Management: Experiences and Lessons Learnt.
Nile River Basin Nile Sudd Swamp Blue Nile White Nile
Promoting Energy Efficiency In Buildings in Developing countries.
GMES : Global Monitoring for Environment and Security A few items for consideration Jean-Paul Malingreau Adviser- EC Joint Research Centre.
1 Columbia River Forum Columbia River Treaty A Federal Perspective David Burpee Natural Resources Canada November 9, 2005.
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
THE NILE RIVER BASIN : PUBLIC PARTICIPATION CHALLENGES AND OPPORTUNTIES By Aly M. Shady, P.Eng. For Presentation At University of Virginia Law School Charlottesville,
Food Security and Sustainable Development Report on the Implementation of the Sub-programme 20 October 2011.
Introduction A GENERAL OVERVIEW OF THE WCD FINDINGS, RECOMMENDATIONS & APPLICATION Alex Muhweezi & Chihenyo Mvoyi IUCN Uganda Country Office.
The Nile Equatorial Lakes Subsidiary Action Program (NELSAP) A New Approach to the Joint Management of River Basins in the NEL Region.
The Nile Basin Cooperative Framework Agreement Negotiations & the Adoption of a “Water Security” Paradigm: Flight into obscurity or a Logical Cul-de-sac?
Transboundary Water Institutes/Organizations Dr. Zaigham Habib.
16 September 2009, Ryn EUROREGION BALTIC – NEW CHALLENGES.
Nile River Basin – Case Study Elaine B. Darby CE 397 Fall 2005.
NILE BASIN INITIATIVE BACKGROUNDByA.M.FARAHAT. THE ISSUE  Nile water agreements between Egypt and the British date back more than 100 years.  Core objective:
1 ADB Support to Transboundary Water Resources Management in Central Asia Hong Wei Country Director Uzbekistan Resident Mission Asian Development Bank.
There are a number of different ways of managing transboundary river systems, and different institutional responses to these challenges.
Addressing water management challenges in Nile Basin  Key to achieving the SDGs 11 countries with total population over 415 Million  doubling every.
THE FRAMEWORK FOR EXTRACTIVE INDUSTRIES GOVERNANCE IN ASEAN LAUNCHING JAKARTA, 28 NOVEMBER 2014.
World summit on the information society World Summit on the Information Society World Summit on the Information Society Overview and Assessment Geneva.
Regional Technical Cooperation on Water The Nile Basin Case ByA.M.Farahat Prof. INP, Cairo, Egypt Arab Water Council Representative 2 nd IIWF Middle East.
Institutional and Legal Issues in Managing shared Water Resources The Arab Region's Experience Chara Ksia League of Arab States.
Joanna Fiedler Enlargement and Neighbouring Countries Unit DG Environment European Commission REReP → RENA Vision of the European Commission PEIP Regional.
1 Blue Revolution Initiative: Improving Water Management for Health, Prosperity and Security in the Middle East and Asia JOHN WILSON Deputy Director Office.
A Review of the Standing Committee of Caribbean Statisticians (SCCS) as a Mechanism for Statistical Development and Harmonisation The Second Meeting of.
EASTERN AFRICA POWER POOL EAPP 5 th Coordination Meeting Of African Regional Power Pools 6 th – 7 th May 2010 Harare, Zimbabwe.
PACIFIC AID EFFECTIVENESS PRINCIPLES. Purpose of Presentation Provide an overview of Pacific Principles on Aid Effectiveness Provide an overview of Pacific.
AfDB PARTNERSHIPS AND COOPERATION STRATEGY Proposed New Direction - 24 March 2010 Presented by Kazumi LARHED Head, Partnerships and Cooperation.
Nile Basin Initiative SOCIO-ECONOMIC DEVELOPMENT & BENEFIT SHARING PROJECT (SDBS)
Information and transboundary cooperation – challenges and responses Francesca Bernardini United Nations Economic Commission for Europe.
Regional Technical Cooperation on Water The Nile Basin Case ByA.M.Farahat Prof. INP, Cairo, Egypt Arab Water Council Representative 2 nd IIWF Middle East.
For a better built environment 1 Driving Relevance of Built Environment Professions in the context of Africa’s Developmental Agenda By Bheki Zulu CEO –
River Basin Management in Southern Africa Barbara Schreiner.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
The implementation programme for the 2008 SNA and supporting statistics UNECE special session on National Accounts for economies in transition Geneva,
The World Bank’s Experience with Country Environmental Analysis (CEA) Sub-Regional Workshop for GEF Focal Points Europe and the CIS 7-8 March 2007, Istanbul.
The dti Striving for a growing economy that benefits all Presentation to the Joint Budget Committee 2 November 2005.
ENPI – The example of Ukraine DG RELEX UNIT E-2 Ukraine, Moldova and Belarus.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
A coordinated approach to water in Europe Harro Riedstra, EWP.
International Network Of Basin Organizations topic 3.1: “Basin Management and Transboundary Cooperation”. Operational tools  Long term basin management.
Thessaloniki April 2007 Dimitris Faloutsos The Petersberg Process Phase II / Athens Declaration Process and the GEF IW:LEARN Enhancing management.
Legal Framework for Equitable and Sustainable Utilisation of the Nile River Waters: Agreement of the Riparian States for Cooperative Basin Management Mekete.
PRESENTATION OF THE WORK PLAN FOR PERIOD AFROSAI – Working Group on Environmental Audit.
Mekong River Commission, Tools to Implement the 1995 Agreement - Dr Choomjet Karnjanakesorn, WUP Team Leader 28-Apr-17 Mekong River Commission (MRC) Water.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Developing a guidance on water and climate adaptation for the.
Regional IAWGs Meeting: Feedback Middle East and North Africa Maha Mowafy, IAWG MENA Coordinator Eastern Europe and Central Asia Nesrine Talbi, International.
CARIBBEAN WORKSHOP ON E-GOVERNMENT BEST PRACTICES Port of Spain, Trinidad & Tobago, July 26-28, 2005.
PROGRESS IN THE IMPLEMENTATION OF THE LVEMP-I & THE PREPARATION OF THE LVEMP-II PAPER PRESENTED AT THE GEF THIRD BIENNIAL INTERNATIONAL WATERS CONFERENCE.
A strategic vision for regional cooperation in the Arab Region Arab States Round Table World Bank Land and Poverty Conference 2017 Washington, 21 March.
Discourse Intelligence Network Empowerment Through Participation Towards Cooperation on the Nile. Hellen NATU Nile Basin Discourse.
Civil Protection Financial Instrument – Prevention Projects
Introduction to the Workshop
Understanding the Global Water Crisis : Lessons from the Nile Basin Dr
High level seminar on the implementation of the
The Role of Civil Society Forums in International River Basin Management – The Case of the Nile By Dr. Patricia Kameri-Mbote Presented at The Hague.
CHALLANGES AND RESPONSES FOR WATER EDUCATION IN A CHANGING ENVIRONMENT
Presentation transcript:

Regional Technical Cooperation on Water The Nile Basin Case ByA.M.Farahat Prof. INP, Cairo, Egypt Arab Water Council Representative Istanbul May 3-5, nd Istanbul International Water Forum Middle East Special Focus Meeting

THE NILE BASIN

REGIONAL TECHNICAL COOPERATION IN WATER The Nile Basin Case CONTENTS  Early Attempts  Nile Basin Initiative  Joint Multipurpose Program  Institutional Strengthening Project  Cooperative Framework Agreement  Epilogue

REGIONAL TECHNICAL COOPERATION IN WATER The Nile Basin Case EARLY ATTEMPTS  HYDROMET  1992 – 1998TECCONILE  1999 to dateNile Basin Initiative

REGIONAL TECHNICAL COOPERATION IN WATER The Nile Basin Case NILE BASIN INITIATIVE, (NBI) 1999 to date Shared Vision To achieve sustainable socio-economic development through equitable utilization of, and benefit from, the common Nile water resource

REGIONAL TECHNICAL COOPERATION IN WATER The Nile Basin Case NILE BASIN INITIATIVE, (NBI) 1999 to date Shared Vision To achieve sustainable socio-economic development through equitable utilization of, and benefit from, the common Nile water resource

REGIONAL TECHNICAL COOPERATION IN WATER The Nile Basin Case NILE BASIN INITIATIVE, (NBI) 1999 to date Shared Vision Program  A Thematic Program  Its main objective is to build trust among NB countries and involve stakeholders  Intended to identify projects for the two other investment programs

REGIONAL TECHNICAL COOPERATION IN WATER The Nile Basin Case JOINT MULTIPURPOSE PROGRAM (JMP) 2005 to date Mandate …to ”identify and prepare a major initial project, within a broader multipurpose program, to demonstrate the benefits of a cooperative approach to the management and development of the Eastern Nile”

REGIONAL TECHNICAL COOPERATION IN WATER The Nile Basin Case JOINT MULTIPURPOSE PROGRAM (JMP) 2005 to date Anchor/Power Trade  Dam and Reservoir  Hydro-power generation and transmission  Power Trade

REGIONAL TECHNICAL COOPERATION IN WATER The Nile Basin Case Joint Multipurpose Program (JMP)  Main Nile Sub-Basin  Tekeze -Setit- Atbara  Blue Nile (Abbay)  Baro – Akobo - Sobat

12

Karadobi Mandaya Border Beko Abo

REGIONAL TECHNICAL COOPERATION IN WATER The Nile Basin Case JOINT MULTIPURPOSE PROGRAM (JMP) 2005 to date Strategic Social Environmental Assessment Its objective is to provide information and facilitate communication among stakeholders including governments through a consultant in such a way to assist them to make informative decisions. This role is brone to a catalyst rather than professional providing conclusive answers to the problems at hand.

REGIONAL TECHNICAL COOPERATION IN WATER The Nile Basin Case JOINT MULTIPURPOSE PROGRAM (JMP) 2005 to date The Water Security Issue Water is a National Security issue for Egypt Water is a National Security issue for Egypt It depends on Nile waters for 97% of its needs. DRC dependency on the Nile is 0% It depends on Nile waters for 97% of its needs. DRC dependency on the Nile is 0%

REGIONAL TECHNICAL COOPERATION IN WATER The Nile Basin Case INSTITUTIONAL STRENGTHENING PROJECT(ISP) 2010 – 2012 Towards a Nile Basin Commission Is a critical part of an ongoing process to build up, boost and fortify the Nile Basin Initiative to be in position to meet the challenges that it is currently facing, as well as challenges it is likely to face in the future. Is a critical part of an ongoing process to build up, boost and fortify the Nile Basin Initiative to be in position to meet the challenges that it is currently facing, as well as challenges it is likely to face in the future. 3-year duration year duration Became ready in October 2009 Became ready in October 2009 funded by the riparian governments and donors funded by the riparian governments and donors

REGIONAL TECHNICAL COOPERATION IN WATER The Nile Basin Case COOPERATIVE FRAMEWORK AGREEMENT (CFA) Has three aspects: Legal aspects Legal aspects Institutional aspects Institutional aspects Information exchange aspects Information exchange aspects All aspects are agreed upon except three points that are disputed

REGIONAL TECHNICAL COOPERATION IN WATER The Nile Basin Case COOPERATIVE FRAMEWORK AGREEMENT (CFA) Current Dispute  Water security  Prior notification  Agreements by majority not consensus. Majority including downstream countries namely, Sudan and Egypt

REGIONAL TECHNICAL COOPERATION IN WATER The Nile Basin Case EPILOGUE Positive aspects  Considerable progress made  Governance structure established  Knowledge base built  Tangible benefits delivered to investment programs

REGIONAL TECHNICAL COOPERATION IN WATER The Nile Basin Case EPILOGUE Personal Views NBI is very well engineered and professionally prudent NBI is very well engineered and professionally prudent However, the devil is in the application details However, the devil is in the application details Water resources is abundant. It is not a zero-sum game Water resources is abundant. It is not a zero-sum game 1600 BCM annually. 96% are wasted 1600 BCM annually. 96% are wasted It is a water management problem It is a water management problem

THANK YOU