FERC Relicensing of the Toledo Bend Project – Hydroelectric Power Generation Drought Hydroelectric vs. Water Supply Sabine River Authority Issues.

Slides:



Advertisements
Similar presentations
J2 Regulating Reservoir Project
Advertisements

FERC Scoping Meeting Project No Federal Energy Regulatory Commission Sabine River Authority State of Louisiana & Sabine River Authority of Texas.
Presentation Texas Water: What You Should Know November 6, 2010.
Yellowtail Dam & Bighorn Lake Billings, Montana October 18, 2007 RECLAMATION Managing Water in the West.
John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
Groundwater Management Districts Association Chuck Cullom Colorado River Manager CAP January 7, 2015.
North Texas Municipal Water District’s Proposed Lower Bois d’Arc Creek Reservoir Presented by: Jim Parks.
© 2014 HDR, Inc., all rights reserved. Catawba-Wateree Water Management Group Water Supply Planning.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Slide 1 November 2005 Oakdale Irrigation District Water Resources Plan A Community Plan. A Successful Future. Phase 1 Recommendations Oakdale Irrigation.
Colorado River Water Supply and 7 State Drought Plan Don Ostler Upper Colorado River Commission.
The Compact  Legally enforceable contract among the Great Lakes States  Provided for in the U.S. Constitution  Ratification by State legislatures 
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
WESTCAS - Shortage Impacts on AZ CAP General Manager David Modeer October 29, 2014.
Water in California: Self-induced Scarcity Waterscape International Group.
One Corps Serving The Army and the Nation Water Supply FY 05 Program Development Ron Conner.
Drought and the Central Valley Project August 2014.
Flow 2008 Don Kraus, P.E., General Manager The Central Nebraska Public Power and Irrigation District.
Responding to Drought (and other) Conditions on the Colorado River Urban Water Institute’s 21 st Annual Conference August 14, 2014.
Lake Columbia Water Supply Reservoir Project TWCA March 4, 2010.
Department of Natural Resources and Conservation, Water Resources Division State Water Projects Bureau Kevin B. Smith, P.E., Chief
Youghiogheny River Lake Storage ReAllocation for Downstream Water Supply by Werner C. Loehlein, P.E.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Citizens Advisory Committee to the Chesapeake Executive Council November 29, 2012.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
Water Supply Reallocation Workshop Determining Yield and Space Requirement.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
US Army Corps of Engineers BUILDING STRONG ® Savannah River Basin Drought Workshop October 24-25, 2012.
WATER AVAILABILITY MODELING for the SULPHUR RIVER BASIN Texas Natural Resource Conservation Commission Austin, Texas Consultant: R. J. Brandes Company.
An Interregional Water Solution with Conjunctive Use of Groundwater Haskell L. Simon President, Coastal Plains Groundwater Conservation District Vice President,
HEA 1738 IC as amended Water Resource Allocation and Distribution in Indiana IDNR Division of Water.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
Urban Water Institute August 27, 2015 Managing the Colorado River during Drought.
Salinity Control on the Pecos River Robert E. Mace, Ph.D., P.G. presented at the Multi-State Salinity Coalition’s Salinity Summit January 26, 2012; Las.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
FLOWS FOR THE FUTURE 2005 Environmental Flows Conference Texas State University – San Marcos November 1, 2005 Bob Brandes Region M Water Planning Study.
Assign Annual Demand for a Purpose CALSIM Simulation Compare the Long-term Average Annual Friant Unit Delivery to Benchmark Study CALSIM Simulation Completed.
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
1 Water Resources Management - DEQ’s Role in Water Supply - State Water Commission October 1, 2002.
USACE Managing a Drought  Overview  Timeline  Depletion Scenario Current Status– 17 Oct 07.
Upper San Joaquin River Basin Storage Investigation ACWA Regions 9 and 10 Carlsbad Water Summit U.S. Department of the Interior Bureau of Reclamation State.
U.S. Army Corps of Engineers Wilmington District Real-Time Conservation Pool Storage Accounting for the Falls Lake Project.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
Reservoir Development Update Region K Meeting July 11, 2012 Karen Bondy, P.E. Manager of Resource Strategy 1.
1. 2 Required under water right Establishes limit on LCRA firm water contract sales from lakes Industry standard for evaluating available water supply.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
Urban Water Institute Colorado River Lower Basin Issues Tanya Trujillo Colorado River Board of California February 10, 2016.
PROPOSED BRUNSWICK COUNTY INTERBASIN TRANSFER PETITION REQUEST NOVEMBER 14, 2013.
Reclamation and Hoover Dam It’s All About The Water.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
Strategies for Colorado River Water Management Jaci Gould Deputy Regional Director Lower Colorado Region.
CRFS Technical Meeting LC Operations Update November 14, 2012.
CRFS Technical Meeting LC Operations Update March 27, 2014.
3 Old Dominion University Lake Gaston Project Field Trip November 1, 2014 Thomas M. Leahy, P.E. Director of Public Utilities.
Wyoming Association of Rural Water Systems Harry LaBonde Jr, P.E. Director Wyoming Water Development Office April 19, 2016.
City Council March 4, Introduction The UCRA recommends the development of a storm water storage basin just to the east of FM 1223, south of Avenue.
Yuma Agriculture Water - Rights and Supply Terry Fulp Director, Lower Colorado Region Yuma Agriculture Water Conference January 13, 2016.
Savannah River Projects
Colorado River Commission of Nevada (CRCNV)
NC EMC – Water Allocation Committee
Department of Environmental Quality
Amended and Restated Interlocal Agreement for Entiat Marina
Hydrology CIVL341.
Drought Contingency Planning Efforts
Hydrology CIVL341 Introduction
AICE QUESTION.
Department of Environmental Quality Division of Water Resources
Presentation transcript:

FERC Relicensing of the Toledo Bend Project – Hydroelectric Power Generation Drought Hydroelectric vs. Water Supply Sabine River Authority Issues

–Current license issued Oct.1963 – Expires Sept –Filed NOI/PAD September 22, 2008 –Preparing license application 2008 – 2011 –File license application September, 2011 –Re-licensing could affect all levels of Operations Lake levels Downstream releases Water supply yield Water releases for instream flows and bays & estuaries Hydroelectric power production Construction/Permitting within Project Boundary Re-Licensing the Toledo Bend Project

FERC Relicensing Challenges In the early 1960’s, the Clean Water Act, the National Environmental Protection Act, and the National Historic Properties Act had not been enacted. Before FERC will issue a new license for Toledo Bend, all those Acts must be complied with. It is the responsibility of the licensee’s (SRA-TX and SRA-LA) to prove the project is in compliance.

Length – 560 miles Drainage Area – 9,952 sq. mi. 25% in Louisiana 75% in Texas Boundary reach covered by Sabine River Compact. Available water from the boundary reach down is split equally between States. Toledo Bend Dam is located 147 miles from top of Sabine Lake. Average Inflow into Sabine Lake – 5,982,000 Ac-ft/yr Sabine River Basin Facts

Toledo Bend Project Water Supply Hydroelectric Power Recreation

Toledo Bend Reservoir  Federal Energy Regulatory Commission –Project No. 2305; license issued 1963 (LA & TX)  185,000 surface acres  Max Power Pool Elev ft MSL  Storage Capacity4,477,000 acre-feet  Average Inflow 4,200,000 acre-feet/year  Shoreline 1,200+ miles  Drainage Area 7,190 sq. miles

Water Volumes 1 Acre-foot = 325,848 gallons Toledo Bend Reservoir 4,476, ft. msl 4,200,000 Acre-feet annual average inflow Hydro Power Generation – 2 Units 28,000 acre-feet per 24 hours Haynesville Shale Hydrofracking 6.5 million gallons/ 20 acre-feet Evaporation Loss (Monthly) August – 40,000 acre-feet

“Firm Yield” “The amount of water that can be supplied from a reservoir on an annual basis during the most critical drought period of record.” Forest & Cotton, 19592,074,500 ac-ft Brown & Root, 19912,086,600 ac-ft TCB, 20051,908,000 ac-ft Louisiana’s Portion 954,000 ac-ft

172 msl 4,476,951 ac-ft Elevation and Volume Toledo Bend Reservoir 168 msl 3,788,901 ac-ft 169 msl 3,953,801 ac-ft 170 msl 4,123,426 ac-ft 171 msl 4,297,776 ac-ft

Elevation and Volume Toledo Bend Reservoir 172 ft-msl 168 ft-msl 688,000 Acre- Feet 15% of Total Volume 16% of Average Annual Inflow

LA SRA Water Sales (Toledo Bend Reservoir) Existing Contracts Annual withdrawals: 27,589 ac-ft/yr Additional options: 37,940 ac-ft/yr Contracts total: 65,529 ac-ft/yr Haynesville Shale (projected)  36,500 ac-ft/yr Non-Allocated Water 851,971 ac-ft/yr

Power Generation vs. Water Supply Power Sales Agreement – Expires 2018 – Notice of Termination due 2015 – Power Sales Revenue accounts for 40% of total SRA Revenue Water Supply – Toledo Bend: Accounts for 12% of SRA Revenue – Diversion Canal Accounts for 34% of SRA Revenue

Future Utilization of Toledo Bend Reservoir SRA’s Board of Commissioners has adopted the strategy of developing water sales as an alternative source of revenue in lieu of hydroelectric power generation. “Run of the River” for Power Generation – Environmental Flows – Controlled excess capacity releases

Water Supply Proposal Out-of-State Sale – Requires Governor’s Consent 600,000 Acre-Feet Per Year Maximum Monthly Withdrawal – 75,000 Acre-Feet/month – Equivalent to running 2-generators 2.67 days/month Drought Contingency Plan

Approx. $.008 / 1000 Gallon $.15 / 1000 Gallon

Balancing Water Supply/Lake Level SRA-LA & SRA-TX Inter-Basin Transfers – Present Law prohibits SRA-TX from transferring water outside the Sabine River Basin – Highly probable SRA-TX will be granted a permit to transfer 300,000 acre-feet per year outside the Sabine River Basin of Texas SRA-LA will reduce its allocation to 300,000 acre-feet per year Proposed Cooperative Agreement – In the event SRA-TX does not receive an Interbasin Transfer Permit, SRA-LA may enter into agreement with SRA-TX to purchase up to 300,000 acre-feet per year for lake-level mitigation and to balance operational budgets

Water Supply vs. Hydroelectric CONCLUSION Extensive Financial and Environmental Analysis have been conducted Minimal Environmental Impact and Substantial Economic and Social Benefits Consistent with purposes for which Toledo Bend was constructed Consistent with the public trust mandate of Article IX, 1 of the Louisiana Constitution