LV and HV status of the RPC system RPC detector and trigger group.

Slides:



Advertisements
Similar presentations
ALICE DCS Workshop - 15/3/2004 G. De Cataldo, A.Franco, A.Tauro - INFN Bari - 1 The SY1527 replay delay via the OPC and the ‘SY driver’ (By HMPID) The.
Advertisements

HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
A3016 and MAO test at CAEN Pigi, A. Boaino & CAEN.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Project: Electronic Cricket
Link Board Upscope Frascati group Napoli group Warsaw group.
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
Control & Monitoring of DC-DC Buck Converters Satish Dhawan Yale University Power Distribution Working Group Meeting- Tuesday 24 February 2009 ATLAS Upgrade.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Low Voltage LB status RPC detector and trigger group.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Remapping of 48V generators in US15 – Load Balancing Much better balanced load between chan A and chan B outputs More even load between generators, avoiding.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
RPC Trigger Electronics Review Subjects: Link System Low Voltage Link System Upgrade Krzysztof Doroba, University of Warsaw Krzysztof Doroba, RPC TRigger.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
RPC DSS & DCS Action Matrices Review Anton Dimitrov CMS Action Matrix Review 2015, 06.Mar.2015, CERN, Geneva.
8-May-2010 LV Workshop1 Alignment LV: quick’n dirty HW review Alignment uses CAEN low voltage –No HV –Low power consumption electronics: under kW.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
ATLAS MDT HV – LV Detector Control System (DCS)
RPC Barrel HV & LV system Lappeenranta University
Electronics for RPC Upscope
HV & LV status LV system in W+1 and W+2 is OK
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Report on radiation test done in Casaccia on January 11, 2006
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
The IFR Online Detector Control at the BaBar experiment at SLAC
Alfonso Boiano1, Flavio Loddo2, Pierluigi Paolucci1, Antonio Ranieri2
RPC Detector Control System
23 Barrel chambers and 12 Endcap chambers
HV Imon in 1th MTCC period
RPC Detector Control System
RPC Detector Control System
LINK BOARD PROJECT UPGRADE
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
HV-LV-DCS Status NEWS DCS Endcap Integration
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
RPC Detector Control System
RPC HV-LV project Introduction System requirements and description
HV & LV status LV system in W+1 and W+2 is OK
RPC Detector Control System
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
RPC HV-LV project Introduction System requirements and description
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
LINK BOARD PROJECT UPGRADE
Dr. Pierluigi Paolucci - INFN di Napoli
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
23 Barrel chambers and 12 Endcap chambers
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

LV and HV status of the RPC system RPC detector and trigger group

Equipment type Totalinstalled spare % of spare SY ,0% A ,7% A3512NHV ,5% A1676BC A ,6% EASY3000SCRATE403825,3% EASY3000CRATE ,8% A3000FBFAN ,4% A3486S_380MAO AC/DC ,0% A3009LV DC/DC ,4% A3801ATemperature AC/DC ,4% RPC HV distributor BarrelHV Distribution Box373525,7% A3486S_230 EndcapMAO AC/DC131218,3% RPC HV distributor EndcapHV Distribution Box24 00,0% A3016LV DC/DC686446,3% RPC LinkBoardBoxLBB ,4% RPC MasterBoardMLB ,3% RPC SlaveBoardSLB ,0% RPC ControlBoardCB ,3% RPC LB FrontPanelLB FP ,2% RPC OptoBoxOB ,0% 7/6/10Pigi Paolucci - CMS LV review2

Electronic status HV:694/69699% LBB: 384/384100% LV: 1050/ % T: 401/401100% LV detector system is working smoothly. HV system: – 3 boards are under investigation at CAEN – Few coaxial connectors replaced – well know insulator Problem appears very often after SY1527 kill/power cut 2 nd generation of insulators (factory) are, until now, stable 3 nd generation of insulators (custom) are under design in Napoli Manpower is ok (3 experts at CERN) 7/6/10Pigi Paolucci - CMS LV review3

Low Voltage Link Board status After many failures in the link board system the RPC-Trigger community decided to investigate all the possible causes analyzing not only the LB system but also the LV system: A3016 boards MAO LV and MAO power cut and power cycle Power off and on of the link box CAEN firmware 7/6/104Pigi Paolucci - CMS LV review

A3016 behavior cutting the MAO 3Phase

LV link board Schema 1.MAO 48 service from BC – Output current = A 2.EASY 3000 – Joint 48 Power & Service 3.Output power from A3016: – 2.5 Volts / 5.0 Amp – 3.5 Volts / 10.0 Amp MAO SY service 3-phase EASY A service 48 power Link Box 7/6/106Pigi Paolucci - CMS LV review

What powering OFF the MAO in the proper ways ? Powering OFF the MAO via SY1527 or using the interlock placed on the front OK 7/6/107Pigi Paolucci - CMS LV review

What powering OFF the EASY in a “bad” way ? Powering OFF the EASY 3000 crate removing the power or service connector from the back OK 7/6/108Pigi Paolucci - CMS LV review

What cutting the MAO 3-phase ? Shutting-down the MAO cutting 3-phase oscillation does not depend from the MAO load (from 4 A to 18 A) sometimes 2 oscillations in few msec oscillation disappear separating the 48 power from the 48 service No other ways to reproduce it NOT OK 7/6/109Pigi Paolucci - CMS LV review

What happen cutting MAO 3-phase ? MAO goes OFF in 2 steps: from 48 to 22 V and a from 22 to 0 V The A3016 channels go off when MAO voltage is around 22 V and this takes about msec (fixed load on the MAO) Around 22 V the boards begin to work not properly (Vcc goes from 12 V to 6 V) and generates oscillations on Vout. 7/6/1010Pigi Paolucci - CMS LV review Vmao = 22 V Vcc = 12 V 6 V 7/6/1010Pigi Paolucci - INFN

Mao behavior during 3Phase glitch

T0T1 At T0: Turn off the 3-phase switch MAO starts ramping down with a “dummy load” - NO status changing After a while, it gives UNV status, but the channel keeps status ON. At T1: MAO ramps down with different slope (real load) At T2: MAO swiched ON (600 ms from T0). Switching OFF-ON in <1sec, no IntFail status is generated by the MAO and the channel goes back to the 48V without any alarm acknowledge. T2 Scope output MAO A V 7/6/1012Pigi Paolucci - CMS LV review

What we have done ! Already implemented Solutions: Introducing a big capacitor (33 mF) between the service and power line of the EASY Improve the A3016 firmware Modify the MAO firmware Long Term Solutions: 1.Designing a protection on the Link Box LV lines (see tomorrow meeting) 2.Separating the 48 service and power of the EASY ? 7/6/1013Pigi Paolucci - CMS LV review OK Under test now

A3016 firmware requirements Couple of channels in tracking mode (ON/OFF/Trip at same time and with one command). – delay between the 2 channels must be less than 1 msec Ramping up in stepping mode: – overshoot first steps < 10% of the setting voltage – overshoot of the last step must be < setting voltage – voltage must be always < setting voltage (no overshoot above max value) – Over-voltages are very dangerous for the LB. – no under-voltage dips are allowed after VCC2.5 gets above 2.0 V – no under-voltage dips are allowed after VCC3.3 gets above 1.2 V – total time to reach the setting voltages (3.5 V and 2.5 V) should be less than 60 msec 7/6/1014Pigi Paolucci - CMS LV review

MAO firmware requirements The MAO behavior is case of glitch on the 3- phase line is potentially dangerous for the LV system. Turn OFF the MAO when the Vmon < Volts in about 100 msec and require an acknowledge afterwards to bring the channel back to ON. – In 100 msec firmware measures the voltage 5 times, should be enough. – After 100 msec the MAO voltage is around V and it is enough to shut-down properly the A /6/1015Pigi Paolucci - CMS LV review

7/6/10Pigi Paolucci - CMS LV review16 MAO Vcc Vout New MAO firmware old MAO firmware Oscillations on both Vcc and Vout 200 msec OFF – 38V 43V New MOA firmware

7/6/10Pigi Paolucci - CMS LV review17 Rumping up - new A3016 firmware 50 msec 80 msec 2.5 V 3.5 V No overshot over the max voltage

7/6/10Pigi Paolucci - CMS LV review18 Overshot - new A3016 firmware Overshot < 10-15% voltage set

7/6/10Pigi Paolucci - CMS LV review19 Channels delay- new A3016 firmware 2 msec Delay stable and < 2 msec (depends on the charge)

Results with C and diode power service 1.5 sec 7/6/1020Pigi Paolucci - CMS LV review

Results with C and diode 2.5 V 48 V No spikes or oscillations 600 msec 7/6/1021Pigi Paolucci - CMS LV review

Conclusions Running systems is very stable Spares are under control (> 5%) Many improvements done on the trigger LV system to assure a more stable and safe behaviors of the Link System Hardware protection of the Link Box is under test (Warsaw group) 7/6/10Pigi Paolucci - CMS LV review22