Oak Grove Elementary State of the School October 2008.

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Dallas County SAFPF Re-Entry Courts Outcome Study
Statistics Part II Math 416. Game Plan Creating Quintile Creating Quintile Decipher Quintile Decipher Quintile Per Centile Creation Per Centile Creation.
EuroCondens SGB E.
Worksheets.
Addition and Subtraction Equations
1 When you see… Find the zeros You think…. 2 To find the zeros...
1 Quality Education Investment Act of 2006 (QEIA) 1 Quality Education Investment Act (QEIA) of 2006 County Superintendents Monitoring Responsibilities.
Alameda Unified School District School Board Meeting Budget Information Update February 10, :30pm.
Welcome! Alameda Unified School District Special School Board Meeting Public Budget Workshop At Haight Elementary School Wednesday, February 11, :30pm-8pm.
Newark Kids Count 2011 A City Profile of Child Well-Being Advocates for Children of New Jersey 35 Halsey Street Newark, NJ
New Jersey Statewide Assessment Results: Highlights and Trends State Board of Education, February 6, 2008 Jay Doolan, Ed.D., Assistant Commissioner,
Create an Application Title 1Y - Youth Chapter 5.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
MACCRAY School District 4 Day School Week Presentation This presentation will focus on the rationale for adoption, the planning and implementation and.
Alaska Accountability Adequate Yearly Progress January 2008, Updated.
Alaska Accountability Adequate Yearly Progress February 2007, Updated.
1 Adequate Yearly Progress 2005 Status Report Research, Assessment & Accountability November 2, 2005 Oakland Unified School District.
AYP Update: Federal Cap Process Performance Reporting Division Texas Education Agency TETN Accountability Session May 21, 2009.
Annual Progress Report Submitted to The Iowa Department of Education by the Cedar Rapids Community School District.
MUIR FUNDAMENTAL SCHOOL May 2012 CST Data Presentation.
2.11.
The 5S numbers game..
Break Time Remaining 10:00.
The basics for simulations
PP Test Review Sections 6-1 to 6-6
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Middle School 8 period day. Rationale Low performing academic scores on Texas Assessment of Knowledge and Skills (TAKS) - specifically in mathematics.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Beyond the Red and Green “The Rest of the Story!”.
SRC Action Meeting June 19, Charter High School for Architecture + Design (CHAD)  The Charter High School for Architecture + Design (CHAD) serves.
Biology 2 Plant Kingdom Identification Test Review.
School Improvement Advisory Committee October 15, 2008 Welcome!
Evelyn CP School Foundation Stage Results (Specific Learning Goals – Reading, Writing and Number) 2013 Reading (Expected) 77% Writing (Expected) 43% Number.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Spencer Elementary School From Needs Improvement School to Title One Distinguished School!
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
12 October, 2014 St Joseph's College ADVANCED HIGHER REVISION 1 ADVANCED HIGHER MATHS REVISION AND FORMULAE UNIT 2.
THE NATIONAL GALLERY STRUCTURE CHART As at 30 JUNE 2010.
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
: 3 00.
5 minutes.
OPSB & RSD LEAP/GEE Scores in Context Cowen Institute for Public Education Initiatives Tulane University May 2008.
Converting a Fraction to %
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
Select a time to count down from the clock above
Restructuring the School Day Parma City School District Focus Group Presentation.
Columbus Tustin Middle School 3-Year Achievement Results Analysis September 2013.
Student Learning Objectives Overview. Defining SLOS A vital component of the Teacher Keys and Leader Keys Effectiveness System is Student Growth and Academic.
Student Equity Report Prepared by Berkeley City College, Faculty, Administrators, and Staff May, 2012 Data Sources: PCCD Institutional Research, CCCCO.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Highly Qualified Staff NCLB Report. Campus General Education Special Education Paraprofessionals Elementary Middle School23211 High School24611.
RCE By the Numbers: Enrollment: 682 (675) Enrollment By Race: Black: 41.6% (44.7%) White: 45.6% (42.8%) Hispanic: 8.9% (6.8%) Other: 3.8% (6.5%) Teachers:
2008 CRCT Domain Summary Beecher Hills Elementary School Numbers Represent the Average % Correct in Each Domain SRT-1.
A Closer Look at CRCT Data Comparing LaBelle, Cobb County School District, and State Data LaBelle Elementary (544 students enrolled) Intended use for.
School-Wide Achievement Mathematics
Willie J. Williams Middle School For Staff Use July 14, 2014
Dixon Elementary # Dixonscholars
Sixes Elementary Data Overview
Salem Elementary School
Presentation transcript:

Oak Grove Elementary State of the School October 2008

Vital Statistics Current enrollment Pre-K – 20 Kdg. – five classes of 20 each, st Grade – nd Grade – rd Grade – th Grade – 91 5 th Grade- 95 Total 640

Enrollment by Gender Pre-K 10 Males, 10 Females Kindergarten 54 Males, 46 Females 1 st Grade 57 Males, 57 Females 2 nd Grade 55 Males, 60 Females 3 rd Grade 48 Males, 57 Females 4 th Grade 44 Males, 47 Females 5 th Grade 52 Males, 43 Females

Oak Grove Staff Certified Teachers – 45 Regular Education – 39 Special Education – 6 Paraprofessionals Regular Education – 7 Special Education – 6 Part-Time Teachers 4 Paras 1

Staffing Ratio 11 to 1, students to adult Budget Total budget from state and county - $27, Approximately $42.71 per student

Scheduling Use a six day rotation Specialists have 7, 45 minute slots in the day. One slot must be for planning leaving six slots for classes. Because of growth of some grade levels to six homerooms, the specialists teaching slots are maximized. Rotating schedule allows for classes to continue on schedule regardless of holidays or interruptions.

Scheduling (contd.) This schedule was devised by the building leadership team and Mrs. Moore at the end of last year. It was revisited at the start of this year and changes made to accommodate present needs.

Test Data From 2008 CRCT

Consolidate School Improvement Plan (CSIP) Purpose of the plan is to improve student achievement. Look at data and set goals based on data.

CSIP Action Plans Reading/English/Language Arts Action Plan (NCLB Mandate) Annual Measurable Objective: 1) Decrease the number of students in grades 1-5 that score in the does not meet standards category within the reading/language arts portion of the CRCT by 0.5%. (In , 2.7% of students scored in the does not meet range.) Increase the number of students in grades 1-5 that score in the exceeds standards category within the reading/language arts portion of the CRCT by 5.0%. (In , 65.2% of students scored in the exceeds standards range.)

Mathematics Action Plan (NCLB Mandate) Annual Measurable Objective: Improve by a minimum of 5% the number of students in AYP grades scoring Level 3 on the Math portion of the CRCT. (2008 CRCT- Level %) Decrease the number of students in AYP grades scoring Level 1 on the Math portion of the CRCT by.5%. (2008 CRCT- Level %)

Science Action Plan (NCLB Mandate) Annual Measurable Objective: The percentage of students in grades 3-5 in Level 1 will not exceed 2.9% (2008 status = 3.3%) The percentage of students in grades 3-5 in Level 2 will not exceed 20.8% (Level = 22.8%), therefore, increasing Level 3 by 2% (Level status =73.8%)

Social Studies Action Plan Annual Measurable Objective: The percentage of students in grades 3-5 at Level 3 will increase from 65.8% to 70%. The percentage of students in grades 3-5 at Level 1 will decrease from 3.6% to 3.5%.

Goals for Oak Grove Improve academic performance of all students Improve the % of students in the exceeds category Increase the use of technology in all areas

Goals continued Improve facility Cleanliness Painting New furniture Student desks/chairs Grounds maintenance

Goals for Oak Grove Improve safety and security Look at traffic safety (car and pedestrian) Look at safety of entry and exit procedures