S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
S.Sergeev, JINR, Dubna. This is just an example of what could be done Could be extended to needs of any NA62 sub- detector requiring a lot of analog measurements.
Clara Gaspar, November 2012 Experiment Control System LS1 Plans…
Robert Gomez-Reino on behalf of PH-CMD CERN group.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
09/11/20061 Detector Control Systems A software implementation: Cern Framework + PVSS Niccolo’ Moggi and Stefano Zucchelli University and INFN Bologna.
MDT PS DCS for ATLAS Eleni Mountricha
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
The Detector Control Power System of the Monitored Drift Tubes of the ATLAS Experiment Theodoros Alexopoulos NTU Athens TWEPP08 September 17, 2008 Naxos,
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
Status of NA62 straw electronics Webs Covers Services Readout.
SA Ch High Voltage Module Main Features for each channel: V out = 12 kV I out = 1 mA R ipple = < 200 mVpp.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
19/05/10FV 1 HyTec crate – DCS integration issues.
Controls EN-ICE FSM for dummies (…w/ all my respects) 15 th Jan 09.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
UF/PNPI POWER SUPPLY SOFTWARE By Magnus Hov Lieng
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
RPC DSS & DCS Action Matrices Review Anton Dimitrov CMS Action Matrix Review 2015, 06.Mar.2015, CERN, Geneva.
Distributed Low Voltage Power Supply System for Front End Electronics of the TRT Detector in ATLAS Experiment E.Banaś a, P.Farthouat b, Z.Hajduk a, B.Kisielewski.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
MCH(Muon Tracking) DCS Introduction Overview drawing High Voltage - hardware functional diagram Logical Diagrams Summary table of states and commands Commands.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
ALICE. 2 Experiment Size: 16 x 26 meters (some detectors >100m away from IP) Weight: 10,000 tons Detectors: 18 Magnets: 2 Dedicated to study of ultra.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Slow Control System at experiment D. Egorov Slow Control System at V. Shutov, D. Egorov, R. Nagdasev 1/15.
CERN Summerschool 2007 Monitor and Control of the CANbus power supplies of ATLAS’ MDTs Wilco Koppert (UU)
Control systems Detector Safety System (DSS) (no action available for an operator) Display of CERN Level 3 alarms and protection of NA62 hardware Detector.
ATLAS MDT HV – LV Detector Control System (DCS)
Control systems Detector Safety System (DSS) (no action available for an operator) Display of CERN Level 3 alarms and protection of NA62 hardware Detector.
TPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

S.Sergeev (JINR)

Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system  LV system  Gas system  Thermo-sensors

Only “CERN Standard” solutions PVSS II + JCOP framework as a basement for DCS development PVSS II is a SCADA toolkit for high level control system development  Visual programming (active pictures)  Object-oriented (data point)  encapsulation  inheritance  member fields  Event-driven  Events related to a change of a data point element (member field) value  Interpretive system  Language – some mixture of C, C++ and Pascal  Distributed system It is assumed that tracker has it’s own DCS PC

 Straw tracker needs 2 HV channels per view => 32 HV channels  Possible HV power supplies  CAEN HV modules A1535 – 24 channels, 3.5 KV, 1 mA  CAEN mainframe SY2527LC (up to 6 modules)  The most convenient refresh period ~1 sec – to be discussed

Windows PC OPC server PVSS II Windows PC Could be single PC TCP/IP COM/DCOM (TCP/IP) OPC client Ethernet

 Should be used Wiener power supply  Current per plain (view) ~30A  Wiener MPV 8008L could be used  8 channels per module => one unit per station  0V... 8V  10A  50W per channel  12bit control DAC, ADC  <10mV pp  Communication by TCP/IP, USB, CAN-bus  2 modules per chamber  The most convenient refresh period ~1 sec – to be discussed

Windows PC OPC server PVSS II Windows PC Could be single PC COM/DCOM (TCP/IP) OPC client Ethernet Terminator CAN-Bus Interface (Quazer XXXX) CAN-Bus

 JCOP framework + CERN Gas working group  CERN Standard 2-component gas mixer  For safety (working in vacuum)  Up to 32 gas segments per view (???)  Two electric valves per plane (station???) with 2 flow meters to cut the gas in case of broken straw + manual valves to cut off the segment with the broken straw A lot of open questions

 View (plane), 176 measurements in total  1 temperature measurement per cover on the bottom of the PCB (to measure gas and board temp), requires 2 ADC channels  3 (?) voltages + 1 current measurement per cover  There are 28 covers/view  4 temperature measurements for mechanics.  28*(2+4)+4=176 ADC channels per view  Chamber  4 views  704 ADC measurements/chamber, 11 ELMBs/chamber  Detector  4 chambers  44 ELMBs total  Refresh period - to be discussed

Windows PC OPC server PVSS II Windows PC OPC client Ethernet 4 chambers CAN-Bus Interface (Quazer XXXX) CAN-Bus 11 ELMBs per station, 44 ELMBs in total, 4 CAN-bus branches

OPC client OPC server GUI Tracker Windows PC OPC server PVSS II Central DCS Windows PC OPC clients Ethernet OPC client GUI PVSS UI Could provide 1 sec refresh period Depends on PVSS lisence

Any detector DCS has three trees  Physical tree in terms rack-crate-board- channel. Used for geographical addressing of infrastructure units  Logical tree in terms detector-subdetector- station-plane-channel-parameter. Used for navigation in the detector view  FSM tree. Used to propagate commands from top layer to bottom layer and states from the bottom to the top. Usually it is similar to the Logical tree

NA62 Root Tracker Station1 View X LV HV1 HV4 Cover1 Cover28 Temp. Voltage LV Voltage Current Temp. HV Voltage Current Temp. Ramping Trip TO

 It seems reasonable to use individual Windows PC for Tracker DCS running all OPC servers  At the development phase this PC could also run local OPC clients with data refresh period ~ 1 sec  After the development is finished it seems to be reasonable to stop local OPC clients and to use only PVSS data with refresh period ~30 sec  To avoid crowds at a single Central DCS PC screen it seems reasonable to run tracker GUIs (PVSS UI) at the tracker DCS PC leaving the “PVSS system” at the central DCS PC.  To allow simple maintenance, the tracker panels, functions etc. should be converted to the JCOP framework component.