TC 57 IEC TC57 WG13 EMS Application Program Interfaces Terry Saxton Convenor, WG13.

Slides:



Advertisements
Similar presentations
Printer Working Group Face-to-Face Meeting December 8, 2010
Advertisements

NAESB Task 5 and 6. Task 5: NAESB and PAP 10 Update (Due: Ongoing) Develop Usage Communication Questionnaire (Due: March 31) –Deployment Status (Investigating,
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report Workgroup for Imaging Management Solutions (WIMS/PMP) Printer.
Copyright © 2006 Data Access Technologies, Inc. Open Source eGovernment Reference Architecture Approach to Semantic Interoperability Cory Casanave, President.
User Working Group Yannis Ioannidis University of Athens, Greece DL.org All Working Groups Meeting, Rome, May 2010.
TC 57 CIM Release Plan and Technical Issue Submittal/Tracking Kendall Demaree CIM Model Manager June 11, 2008 CIM Users Group Vasteras Sweeden.
© 2011 Siemens Energy, Inc. All rights reserved. Answers for energy. PSS ® ODMS a proven solution for CIM-based network modeling Anna Geevarghese T&D Service.
Profiles vs the Canonical Model Other Uses of CIM Version Management in CIM Architectures Smart Grid and CIM Jay Britton Alstom Grid
© ABB Ltd ABB Experience Neela Mayur CIM Users’ Group Meeting June 12, 2008.
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
MTEI Methods & Tools for Enterprise Integration
B usiness T echnology S olutions AMI – Advanced Metering Infrastructure Consumers Energy Mark Ortiz March 9, 2011.
Working Group Summaries Genval, Belgium May 14, 2009.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
PTD Energy Management & Information Systems FERC TC: Information Technology for Reliability & Markets ISO-RTO Standards Collaborative July 14, 2004 J.
Interoperability Tests for IEC Scott Neumann November 12, 2009.
A Family of CIM EMS Exchange Standards based on CIM/XML ( ) - Static Network Model Exchange ( ) - Dynamic Model Exchange? - Schematic.
Common Information Model and EPRI Smart Grid Research
CIM and UML Overview Terry Saxton Xtensible Solutions
EDISON INTERNATIONAL® SM SCE Project Story CIM User Group 10/12/2010 Jim Horstman Southern California Edison.
Metadata IN Smart Grid Group Name: REQ
CIM Standards: Status, Testing, and Collaboration Randy Rhodes CIMug Utility Co-Chair EMS Users Conference September 15, 2009.
IBM Software Group IBM Software Group Rational software ®® SCMA45 Building a Distributed Release Process Using IBM Rational ClearCase, IBM Rational ClearDDTS.
DCN: March 7, 2005 IETF 62 - Minneapolis, MN Media Independent Handover Services and Interoperability Ajay Rajkumar Chair, IEEE
ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September 19981/18 Presentation to ISO/TC.
J-L Sanson, A. Maizener Cimug © Zamiren CimConteXtor A. Maizener : J.L. Sanson : Credit to Sebastien.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group Overview & Plans For further information, contact Wayne Longcore Chairman of AMI-Ent TF.
Comments on doing a CIM Project
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) April.
ISO/IEC CD and WD : Core Model and Model Mapping ISO/IEC JTC1/SC32/WG September 2005, Toronto SC32/WG2 Japan (Kanrikogaku Ltd) Masaharu.
© Siemens Energy, Inc Energy Automation CIM Model Management Kurt Hunter 2009 IEEE Power System Conference & Exposition March 18, 2009.
IEC WG Summaries Austin, TX October 24, WG 13 – EMS API Convener: Terry Saxton The principal task of the IEC series of standards is to develop.
Lead from the front Texas Nodal 1 EDS 4 Release 9.1 DAM/RUC/SASM Market Call January 11, 2008.
EMS User’s Group Presented By Margaret Goodrich Project Consultants, LLC Presented to EMS User’s Group Austin, TX September.
IEC TC57 WG15 - Security Status & Roadmap, TC57 Plenary, May 2007
TC 57 PSCE09 - CIM Status Update Panel Session Introduction Ed Dobrowolski, NERC.
OASIS WSDM TC Face To Face Agenda January, 2005 IBM, Boulder, CO.
Welcome Experiences in the Use of MDA and UML in Developing NATO Standards 16 July 2008 Chris Raistrick, Kennedy KC.COM.
Start Typical student project Advanced student project Level of final response.
WG Summaries Austin, TX October 24, Process WG Co-chairs: Terry Saxton & Ed Dobrowolski Scope: Overall management of the CIMug Development and tuning.
TC 57 TC 57 UML/XML Workshop Report for CIM user Group Jun 2007 Netherlands (ARNHEM) EDF R&D.
SimDB Implementation & Browser IVOA InterOp 2008 Meeting, Theory Session 1. Baltimore, 26/10/2008 Laurent Bourgès This work makes use of EURO-VO software,
Energy Market Information Exchange OASIS Energy Market Information Exchange Technical Committee Work Plan Issues and Direction William Cox
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Plan Discussion For further information, contact Joe Zhou Team Lead
Doing a CIM Project. 22 CIM Design Center  A rule I learned about applying technology:  Understand the design center of the technology.  Use extreme.
> Title of presentation - Date - References11 Model Exchange and Naming -- Activity  Standard  New draft of standard has been created.
Overview AMI-Enterprise For further information, contact: Wayne Longcore Chair of AMI-Enterprise Task Force, Board Of Directors.
Proposal Processing Proposals, Staffing Profiles, Financial Summary Hewlett-Packard Project & Portfolio Management Project & Portfolio Management Slide.
Working Group Summaries Charlotte, NC November 12, 2009.
Djc -1 Daniel J. Crichton NASA/JPL 9 May 2006 CCSDS Information Architecture Working Group.
1 MPLS Architectural Considerations for a Transport Profile ITU-T - IETF Joint Working Team Dave Ward, Malcolm Betts, ed. April 16, 2008.
Process WG Summary Austin, TX October 26, Process WG Co-chairs: Terry Saxton & Ed Dobrowolski Meetings: Europe – June 10, 2008 – June 13, 2008 in.
Proposal Processing Proposals, Staffing Profiles, Financial Summary Hewlett-Packard Project & Portfolio Management Project & Portfolio Management Slide.
Research and innovation Research and innovation 1 STEPMAN The project Development of a STEP and STEP-NC standard based integrated product lifecycle management.
TC CIM Model Manager Summary Kendall Demaree AREVA T&D Inc. March 2009.
1 Steve Hughes Daniel J. Crichton NASA/JPL January 16, 2007 CCSDS Information Architecture Working.
Status of Active Work Items Level of Completeness Group Name: WPM Source: Roland Hechwartner, WPM Convenor Updated:
ISO Liaison Report Hidenori Shinoda 9/28,29/2005 Budapest.
© Siemens Energy, Inc Energy Automation CIM Model Manager Report Kurt Hunter CIM Users Group Meeting 13 Nov 2009.
CIM User Group Overview Terry Saxton Vendor Co-Chair Open Smart Grid AMI-Ent Task Force Meeting July 14, 2009.
CIMug Focus Communities Address: A high-priority need Where wide input is needed: Utilities Vendors Universities IEC WG experts Fast tracks updates into.
IEC for SUBSTATION AUTOMATION TOWARDS MULTI-VENDOR INTEROPERABility OVER The SYSTEMS LIFECYCLE The ENTSO-E Approach KUL – Power Symposium Leuven,
Preliminary Power Point Slides
CIMSpy/CIMdesk A CIM-based Data Engineering Tool
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
Emergency Management Technical Committee
Frances Cleveland Convenor WG15
Presented 12 June 2008 Vasteras, Sweden
CIM Model Manager Report
Organizing Semantics For Effective Enterprise Application Integration
Presentation transcript:

TC 57 IEC TC57 WG13 EMS Application Program Interfaces Terry Saxton Convenor, WG13

TC 57 2 What is WG13?  Objectives  Reduce the cost and time needed to add new applications to an EMS or other system  Protect the investment in existing applications that are working effectively  Improve the capability to exchange information between disparate systems both within and external to the control center environment  Technical approach  Provide an integration framework for interconnecting existing applications/systems that is Based on a common architecture and information model CIM Generic Services Independent of the underlying technology (PIM) Mappings to specific technologies (PSM) WG13 Status

TC 57 3 Meeting Summary  Recent Meetings – 3 days typical  Santa Clara, California, USAJanuary 2008 Meet in conjunction with WG16  Rome, ItalyOctober 2007 Meet in conjunction with WG19  Minneapolis, USAMay 2007 Meet in conjunction with TC57 Plenary  Planned Meetings  Vesteras, SwedenJune 2008  Seoul, KoreaOctober 2008  ???January 2009 WG13 Status

TC 57 4 Work Overview WG13 Status

TC 57 5 TC57 WG13 Release Lifecycle for CIM Base WG13 Status Existing Standard Existing Comments / User Group Inputs Interoperability Test Meeting to Reconcile Existing Work and Interoperability Test Results New Standard CIM12r002 released and posted Third Edition Part 301 ready to send to IEC Need to bring together all CIM WGs to use same number schemes, ways of organizing UML models Profile/context standards Resolutions Update Final Update

TC 57 6 Work Items and Issues  Part 301 Third Edition – based on CIM12  CIM issue resolution continues  Prioritized list  CIM Planning project proposals  ERCOT proposals  Part 450 – Profiles and compliance testing  Part 452– Model Exchange Standard – based on NERC CPSM and recent interop test updates  Part 453 and (SVG) – Graphics Exchange Standard  Need interop testing to advance  Part 454 – Naming  Part 5xx – Document Structure of PSM specifications  NWIPs  CIM/XML message header  Part  Model Population  State Estimator Solution CIS  Part 406 Program Invocation  OWL for CIM/XML Schema