March, 2010 LEA Support Workshop. 11 Agenda 8:30-9:10Welcome and update 9:10-10:00Breakout: As determined by team 10:00-10:10Break 10:10-11:00Breakout:

Slides:



Advertisements
Similar presentations
Learning from Events 12th June 2013 The Tata Steel Approach
Advertisements

Understanding Student Learning Objectives (S.L.O.s)
NIMS ICS All-Hazard Position Specific Training – A Way Forward A Special Presentation for the All Hazards IMT Conference Houston, Texas November 4.
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
[Imagine School at North Port] Oral Exit Report Quality Assurance Review Team School Accreditation.
BY RAYMOND GREENLAW ARMSTRONG ATLANTIC STATE UNIVERSITY ABET-Accreditation Timeline.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
NCATS REDESIGN METHODOLOGY A Menu of Redesign Options Six Models for Course Redesign Five Principles of Successful Course Redesign Four Models for Assessing.
One UN Results Reporting Prototype Consultation Workshop UN DOCO New York, NY – September 2009.
Quality Education Investment Act of 2006 (QEIA) 1 Quality Education Investment Act (QEIA) of 2006 County Superintendents Oversight and Technical Assistance.
New Jersey Schools to Watch Growing, Learning, and Succeeding!
Teacher Effectiveness Evaluation Pilot September 1, 2011 – September 30, 2012 NJ State Board of Education, July 13, 2011.
1 DPAS II Process and Procedures for Teachers Developed by: Delaware Department of Education.
Training for Teachers and Specialists
DELAWARE COMPREHENSIVE ASSESSMENT SYSTEM Presented to District Test Coordinators February 17, 2010.
February, 2010 LEA Support Advisory Council. Agenda 2:30-3:00Discuss plan revision process (feedback and support) 3:00-3:30Discuss February workshops.
April 19, 2012 SBE Presentation on Performance Evaluations.
Illinois Department of Children and Family Services, Pathways to Strengthening and Supporting Families Program April 15, 2010 Division of Service Support,
Principal Professional Development Mathematics KCAS June 13 and June 16, 2011 Analytical and Applied Sciences June/July
Career and College Readiness Kentucky Core Academic Standards Characteristics of Highly Effective Teaching and Learning Assessment Literacy MODULE 1.
Assessment Literacy Kentucky Core Academic Standards Characteristics of Highly Effective Teaching and Learning Career and College Readiness MODULE 1.
1 The Massachusetts Early Learning Guidelines for Infants and Toddlers.
1 The Massachusetts Early Learning Guidelines for Infants and Toddlers.
1 Career Pathways for All Students PreK-14 2 Compiled by Sue Updegraff Keystone AEA Information from –Iowa Career Pathways –Iowa School-to-Work –Iowa.
Professional Learning Communities Connecting the Initiatives
Managing the Statutory Requirements for Assessment April 2011.
Minnesotas Plan for Monitoring School Improvement Grant Implementation April 21, 2010 Patricia King Jonathan Luknic 1.
Guide to Compass Evaluations and
Gaining Senior Leadership Support for Continuity of Operations
Management Plans: A Roadmap to Successful Implementation
A Roadmap to Successful Implementation Management Plans.
1 Quality Indicators for Device Demonstrations April 21, 2009 Lisa Kosh Diana Carl.
RESA Implementation Sessions Day 2 Process Welcome – Before we Begin… Connect to the Internet Visit the Wiki at
Session 2: Introduction to the Quality Criteria. Session Overview Your facilitator, ___________________. [Add details of facilitators background, including.
PARTICIPATION AND ADOPTION OF THE COMMON CORE STANDARDS INITIATIVE 1 Transforming Education in Kentucky Felicia Cumings Smith Associate Commissioner Michael.
VOORBLAD.
Evaluation Orientation Meeting Teacher Evaluation System
RTI 101 Mia Hyde Tennessee Department of Education Coordinator of Reading Content & Resources.
Palo Verde Magnet High School Title I Annual Meeting October 14, 2013.
SEED – CT’s System for Educator and Evaluation and Development April 2013 Wethersfield Public Schools CONNECTICUT ADMINISTRATOR EVALUATION Overview of.
Wethersfield Teacher Evaluation and Support Plan
© 2012 National Heart Foundation of Australia. Slide 2.
District Advisory Council (DAC) 1 October 22, 2012 Westlawn Elementary School.
High School Graduation Network Meeting April 21,
RTI Implementer Webinar Series: Establishing a Screening Process
District Leadership Team Stakeholder Involvement in the District Strategic Plan! Session #4 April 12th, 2011.
1 Phase III: Planning Action Developing Improvement Plans.
Weekly Attendance by Class w/e 6 th September 2013.
Developing a Leadership Practices Framework for School Councils October 22, :00 to 2:30 pm.
Christina School District StubbsBancroftBayard BOARD OF EDUCATION UPDATE OCTOBER 14, 2014 Priority Schools 2014/2015 October Update.
Lead Teacher Session #1 1 September 2014 Welcome! Please sit in table groups with others from your network & complete the Do Now Wireless network: Password:
Teacher Evaluation System LSKD Site Administrator Training August 6, 2014.
1 Literacy PERKS Standard 1: Aligned Curriculum. 2 PERKS Essential Elements Academic Performance 1. Aligned Curriculum 2. Multiple Assessments 3. Instruction.
1 What Counts: Measuring the Benefits of Early Intervention in Hawai’i Beppie Shapiro Teresa Vast Center for Disability Studies University of Hawai`i With.
1 Why is the Core important? To set high expectations – for all students – for educators To attend to the learning needs of students To break through the.
Designing and Implementing An Effective Schoolwide Program
IA-DMM Measures and Results for Year 1. Cohort 1 as of 6/23.
LONGER SCHOOL DAY PARAMETERS & PLANNING TEMPLATE Longer School Day Design Parameters and Planning Template Tuesday, December 13, :30 – 10:30 AM.
1. 2 Why is the Core important? To set high expectations –for all students –for educators To attend to the learning needs of students To break through.
1. Housekeeping Items June 8 th and 9 th put on calendar for 2 nd round of Iowa Core ***Shenandoah participants*** Module 6 training on March 24 th will.
Medicine Hat School District #76 PLC’s Building Capability Through Collaborative Learning Developing tomorrow’s citizens through improved learning, living.
Reform Model for Change Board of Education presentation by Superintendent: Dr. Kimberly Tooley.
Welcome to the Annual Meeting of Title I, Part A Parents and Families
Welcome to the Annual Meeting of Title I, Part A Parents and Families
Welcome to the Annual Meeting of Title I, Part A Parents and Families
Welcome to the Annual Meeting of Title I, Part A Parents and Families
2019 Spring & Fall Timeline May 10, 2019
Presentation transcript:

March, 2010 LEA Support Workshop

11 Agenda 8:30-9:10Welcome and update 9:10-10:00Breakout: As determined by team 10:00-10:10Break 10:10-11:00Breakout: As determined by team 11:00-11:25Cross-LEA sharing 11:25-11:30Wrap-up

22 Objectives for today Discuss Support Program updates Refine LEA plans, by: Revising a section of your plan, OR Completing an incomplete section of your plan Understand the strengths and areas for improvement in other districts

33 Support Program Updates (1/5) Todays agenda Our goal is to make todays workshop most valuable to your team, given your individual districts needs Districts were encouraged to develop their own agendas for team time For teams that have not done so, we have an optional agenda focused on communications and implementation Use the time well, to engage all teammates and make significant progress Visits All visit materials will be online this week, including: Information and presentations on the schools and their partners Feedback from attendees and their ideas for next steps If someone from your team went on a visit, please use some of your team breakout time to hear their feedback and impressions If you sent someone on a visit who is not here, please arrange time with them and your team to learn about what they saw Please let us know how we can support LEAs in incorporating the lessons from visits There are two National Center on Time and Learning workshops: Monday, March 21 in Dover Tuesday, March 22 in Wilmington

44 Support Program Updates (2/5) Success Plan Tool DOE has completed refinements to the Success Plan tool – primarily fixing several glitches and aligning the new template to the online Success Plan There will be a pilot of these changes from February 28 – March 28 Districts can use the system during this time, but should wait until after the pilot to enter their new Success Plans online (as there may be technical difficulties) Please see your handout for important details on the changes, timeline, and DOE technical assistance The changes do not fix every issue, and we will be convening a group to discuss a full re-design of the ESPES system - please contact Susan Haberstroh if you would like to participate Goal 1 and 2 of plans DOE received all Goal 1 and 2 plans last Monday Each plan is being reviewed by a team of DOE reviewers Each district will receive individual feedback and have a call with Secretary Lowery next week Common guidance will be given to all districts next week

55 Support Program Updates (3/5) Communications Your team should be communicating your progress with teachers, principals, board members, parents, and other stakeholders Team representatives should be sharing information with their constituents Look for opportunities to get feedback and buy-in before your plan is finalized – consider simplifying your plan into easy-to-read sheets (e.g., plan activities only), so that you can share the draft plan widely and receive feedback Focus on developing plans that can be understood and implemented by anyone – these plans will be public documents, and should represent a comprehensive path forward There are opportunities to describe your stakeholder engagement and communications in your plan - please do not overlook these other boxes as you complete a full draft of your plan for April 11 Your responses and plans in these areas will be a key determinant of our final funding decision – were not expecting that every stakeholder completely understands and supports the plan immediately, but that they all understand the process and that their representatives have been engaged throughout

66 Date LEA Activity February 28Submit Standards & Assessments and Data Systems part of plan (objectives 1-3) March 14 Receive detailed feedback March Have individual calls with Secretary Lowery to discuss feedbackApril 11Submit full draft of planApril 29 Receive detailed feedback May 2 - 6Have in-person meetings with Secretary Lowery to discuss feedbackMay 20 Submit final drafts June 6Receive final funding decision from DOE Support Program Updates (4/5) Follow-up Work/Feedback Calendar

77 DateFocus & Follow-up work Chief meeting September 23 October 28 Chief meeting November 16 DateActivity October 11, 12, or13 County workshop December 6, 7, or 8 County workshop December 14 Chief meetingJanuary 27Chief meetingFebruary 7, 8, or 9 County workshop February 24Chief meetingMarch 7, 8, or 9 County workshop March 24 Chief meeting April 11Revised Success Plans Due Content focus: Program overview Skill focus: Understand the delivery challenge Follow-up work: Conduct LEA needs assessment Content focus: Effective teachers and leaders Skill focus: Plan for delivery Follow-up work: Revise Goal 3 of plans (Obj. 4-7) Content focus: Rigorous standards, curriculum, and assessments Skill focus: Plan for delivery Follow-up work: Revise Goals 1 & 2 of plans (Obj. 1-3) Content focus: Family and community engagement Skill focus: Drive delivery Follow-up work: Revise Goal 4 (Obj. 8-9) [Not Collected] Spring 2011Plan refinement Chief meeting Content focus: Resource allocation and sustainability Skill focus: Create a delivery culture Follow-up work: Revise remaining parts of plans Support Program Updates (5/5) Program Calendar Completed

88 Data Coach Project Update 90 Minute PLCs PLC Meetings – must occur weekly in two 45-minute meetings or one 90- minute meeting; data coach will facilitate meetings every other week; data coaches will work with core teachers Timing of meetings - meetings should not overlap, allowing instructional leader and data coach to attend all meetings as required Number of teachers in PLCs – 4-10 is the range; optimum number is 8; are recommended Pilot Plan 7 Pilot LEAs with 5 coaches - Capital, Christina/Kuumba, Indian River, Milford/Lake Forest, New Castle County Vo Tech Rigorous interview process and professional development for data coaches All LEAs have identified a Liaison to collaborate throughout the Pilot and to shape the implementation process Full Launch Remaining LEAs implementation begins July, Direct Facilitation and/or Coach-the-Coach Model (each building may be one or the other) 24 additional coaches will be hired in March/April PLCs need to be in place by July, 2011 for scheduling purposes Liaisons will meet regularly with the Data Coach Project Manager & Supervisor Professional development will be coordinated across LEAs

99 Agenda 8:30-9:10Welcome and update 9:10-10:00Breakout: As determined by team 10:00-10:10Break 10:10-11:00Breakout: As determined by team 11:00-11:25Cross-LEA sharing 11:25-11:30Wrap-up

10 Stakeholder groups Which groups do we need to engage? Which groups do we need to inform? Objectives What does each group need in terms of communication? What are we trying to achieve with each group? Messages Why are we changing? How are we changing? What does this mean for each group? Channels How will the messages be delivered - written or face- to-face, and through what venue? Timing When will the messages be delivered, and how frequently? Feedback Mechanism How will we get feedback? How will we know whether our objectives have been achieved? Facilitated Breakout – Optional ActivityTime A. Review the plan prompts and rubric related to engagement and communications 5 B. Discuss engagement and communications using your worksheet (copied below) 45

11 Agenda 8:30-9:10Welcome and update 9:10-10:00Breakout: As determined by team 10:00-10:10Break 10:10-11:00Breakout: As determined by team 11:00-11:25Cross-LEA sharing 11:25-11:30Wrap-up

12 Agenda 8:30-9:10Welcome and update 9:10-10:00Breakout: As determined by team 10:00-10:10Break 10:10-11:00Breakout: As determined by team 11:00-11:25Cross-LEA sharing 11:25-11:30Wrap-up

13 Facilitated Breakout – Optional ActivityTime A. Review the plan prompt and rubric related to success factors and risks 5 B. Discuss implementation routines (one component of the above) using your worksheet (copied below) 45 Routine name (E.g., Progress Update, Performance Review) Content reviewed (E.g., district progress on activities, district performance on measures) Format (E.g., memos, meetings, walk- throughs) People involved Who will run the routine? Who will be responsible for the content? Who else will participate? Timing When will the routine occur, and how frequently? Effectiveness How will you ensure that the routine is focused on quality and effectiveness, and not just compliance?

14 Agenda 8:30-9:10Welcome and update 9:10-10:00Breakout: As determined by team 10:00-10:10Break 10:10-11:00Breakout: As determined by team 11:00-11:25Cross-LEA sharing 11:25-11:30Wrap-up

15 Cross-LEA Sharing ActivityGuiding QuestionsTime Share your districts elevator pitch for your plan, as though you were speaking to a group of teachers Briefly share: What is the district doing? What will be different for teachers? Why does this matter? 20 (3 per LEA)

16 Agenda 8:30-9:10Welcome and update 9:10-10:00Breakout: As determined by team 10:00-10:10Break 10:10-11:00Breakout: As determined by team 11:00-11:25Cross-LEA sharing 11:25-11:30Wrap-up

17 Objectives – how did we do? Please complete the workshop surveys on your table Remember to send your full draft plan by April 11 Discuss Support Program updates Refine LEA plans, by: Revising a section of your plan Completing an incomplete section of your plan Understand the strengths and areas for improvement in other districts