UMREG2012 Meeting, IAEA, Vienna, November 7, 2012

Slides:



Advertisements
Similar presentations
VBGU 1 Verband Bergbau, Geologie und Umwelt e.V. Welcome Statement Association of Mining, Geology and Environment.
Advertisements

Cluff Lake Project IAEA- RSLS Workshop Elliot Lake, Ontario, May 2, 2014 Dale Huffman Vice-President, SHEQ AREVA Resources Canada.
Remediation Challenges and Stakeholder Engagement: A Canadian Perspective Michael Binder President Canadian Nuclear Safety Commission Presentation to the.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Scoping.
Safety and Security Aspects of the Management of High Level Waste and Spent Fuel Ramzi Jammal Executive Vice-President and Chief Regulatory Operations.
First Technical Meeting on EMRAS II new working group on “Reference approaches to modelling for regulatory compliance for legacy site management”
Current Trends in Mining Finance: Strategic and Financial Challenges Roy Hinkamper, KPMG LLP April 2013.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
PROJECT Towards an Harmonised Approach for National Space Legislation in Europe Berlin, January 2004 NATIONAL SPACE LEGISLATION: THE BELGIAN.
TRP Chapter Chapter 1.1 Introduction. TRP Chapter Why raise hazardous waste management standards? To reduce risks of inadequate controls on.
Regulatory Body MODIFIED Day 8 – Lecture 3.
Government of Canada Policy on Radioactive Waste and Legacy Uranium Mines Tom Calvert Uranium and Radioactive Waste Division Natural Resources Canada May.
Wenxin Zhang Department of Civic Design University of Liverpool
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
MINING AND SUSTAINABLE DEVELOPMENT IN GHANA
Working Group 1 Reference and Graded Approaches for Assessing the Impact of Radioactive Discharges.
ENVIRONMENTAL MONITORING AND REPORTING BY ENTERPRISES FEASIBILITY OF DEVELOPING MONITORING GUIDELINES FOR CHEMICAL INDUSTRY IN EASTERN EUROPE, CAUCASUS.
Group of Experts on Monitoring of Radioactively Contaminated Scrap Metal Second Session Geneva, June 2006 United Nations Economic Commission for.
A project implemented by the HTSPE consortium This project is funded by the European Union SUSTAINABLE GROWTH LIFE
Update on progress with development of DS459
The United Nations Economic Commission for Europe (UNECE) Convention on the Protection and Use of Transboundary Watercourses and International Lakes A.
Legacy Management Strategic Plan 2010 David Geiser Director, U.S. Department of Energy (DOE or Department) Office of Legacy Management (LM) November 2010.
National Radioactive Waste Disposal Institute Bill Presentation to the NCOP Select Committee on Economic and Foreign Affairs October 2008.
TEAM 1 NONAMECOUNTRY 1SU RUI (LEADER)CHINA 2TENG IYU LIN (PRESENTER)MALAYSIA 3MUHAMMAD TARIQ AZIZ (RAPPORTEUR)PAKISTAN 4NORAISHAH PUNGUTMALAYSIA 5MOHAMMAD.
1 International Working Forum on Regulatory Supervision of Legacy Sites (RSLS) Technical Meeting Amel MELLOUK – ASN / DRC Jérémie VALLET – MEDDE/MSNR Regulatory.
1 NEED IN INTEGRAL APPROACH  Strategy and Politics in Decommissioning  Institutional and Legal aspects  Regulatory aspects  Economic aspects  Socio-Economic.
UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Remediation of the Tuyuk Suu Tailings Pond “Appraisal of the Minkush.
Institutional Control Program Long Term Care and Control of Decommissioned Mine/Mill Sites Located On Crown Land Saskatchewan Ministry of the Economy April.
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
Needs and Assistance which can be provided Christian Kunze WISUTEC Wismut Umwelttechnik GmbH ENVIRONET Kick-Off Meeting Vienna, 23 – 27 November 2009.
Future European issues on off-shore wind power deployment Steffen Nielsen Head of Section Danish Energy Authority Ministry of Transport and Energy European.
JRC Information Day – May 11, 2006, Bucharest 1 Valică GOREA President of Nuclear Agency GOVERNMENT of ROMANIA Romanian Nuclear Programme Medium and Long.
International Working Forum for Regulatory Supervision of Legacy Sites (RSLS) Review of 2013 and Introduction of Next Steps of RSLS Malgorzata.
Prasetyadi Utomo Ministry of Environment of Indonesia CD4CDM Workshop Pathumthani, Thailand 19 – 21 October, 2005 Indonesia’s Policy on CDM Implementation.
Introduction 1. Purpose of the Chapter 2. Institutional arrangements Country Practices 3. Legal framework Country Practices 4. Preliminary conclusions.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
Coordination between National Regulators for the Safety and Security of International Shipments of Radioactive Materials between Member States Stephen.
Milestones or Millstones Alex R. Burkart, Deputy Director Office of Nuclear Energy, Safety and Security United States Department of State.
Regulatory Approach to Radioactive Waste Management and Remediation in Central Asia Tamara Zhunussova Vienna, IAEA, 6-8 November, 2012.
56th Regular Session of the IAEA General Conference
“ OVERALL DECISION MAKING IN PLANNING FOR REMEDIATION OF URANIUM MINES” Presentation to the Senior Regulator’s meeting at the 56 th IAEA General Conference.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
Regulatory Framework for Uranium Production Facilities in the U.S.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
European Waste Management Presentation of Waste Disposal Company Halle Lochau (AWH) EWM Working Group Meeting Dundee, 3rd and 4th February 2005.
Nuclear Research and consultancy Group European Radiation Survey Site Execution Manual Leo van Velzen ENVIRONET Kick-off meeting Vienna 23 – 26 November.
23 January 2016 Gustavo C ARUSO Head, Regulatory Activities Section Division of Nuclear Installations Safety Department of Nuclear Safety and Security.
Programs to decrease e-waste
Demonstrating and Promoting Best Techniques and Practices for Reducing Health Care Waste to Avoid Environmental Releases of Dioxins and Mercury Project.
INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for.
International Atomic Energy Agency IX.4.2. Principles of radioactive waste management Basic technical management solutions: concentrate and contain, storage.
International Atomic Energy Agency Meeting Summary Technical meeting of the International Project on Demonstration of Operational and Long-Term Safety.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
VICH Training Strategy Steven D. Vaughn, DVM Director, Office of New Animal Drug Evaluation, Center for Veterinary Medicine U.S. Food and Drug Administration.
DDG Nuclear Energy: Mr Zizamele Mbambo
First Nation Waste Management Initiative
Green and Sustainable Remediation (GSR) Overview
Update of 2017 Activities of the ENVIRONET NORM Project
SMA ENVIRONMENTAL FORUM 2018
Nick Bonvoisin Secretary to the Convention on the
Horst Monken-Fernandes Waste Technology Section NEFW
USNRC IRRS TRAINING Lecture18
Plenary Meeting of the Network on  Environmental 
REGULATORY ASPECTS OF RADIOACTIVE WASTE MANAGEMENT IN TURKEY Dr
Making the Business Case for Conversion
Presentation transcript:

UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Uranium Mining and Remediation Exchange Group UMREG “Creating Conditions Conducive to Remediation of Uranium Production Legacy Sites and Safeguarding an Economically and Environmentally Balanced Uranium Production Cycle.” UMREG2012 Organizing Committee: Peter Woods, Russel Edge, Alex Jakubick, Don Metzler, Peter Waggitt in cooperation with Horst Monken-Fernandes UMREG Balanced Resources Management

UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Origin of International Exchange Activities started as a bilateral US/German Exchange Group in Albuquerque (1993) and Chemnitz (1994). The purpose was to bring together the proponents and regulators for information exchange concerning remediation of uranium production legacy sites in the USA and Germany. The aim was to promote economically and environmentally balanced solutions and pragmatic administrative procedures based on sound scientific/engineering principles and proven technologies. The first multilateral meeting was in Sudbury, 1995 which included Canadian and South African delegates. Subsequent meetings followed with participation of Australia and France in Berlin (1995), Vancouver (1997), Denver (1998), Schlema (2000) and Bruges (2001). UMREG Balanced Resources Management

UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Origin of UMREG The UMREG meetings in Freiberg 2002, Oxford 2003, Freiberg 2005 and Bruges 2007 additionally hosted representatives of uranium producing countries in Africa, Latin America, Central and Eastern Europe and Central Asia. At the UMREG 2008 meeting in Freiberg an agreement has been made with the IAEA (represented by J.P. Potier and D. Louvat) re cooperation and establishment of ENVIRONET. UMREG Balanced Resources Management 3

UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 at the Examination School in Oxford, September 24, 2003 UMREG Balanced Resources Management 4

UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Projects that shaped UMREG… During 1989 - 1992 the uranium industry underwent a structural change resulting in a very low U spot price. A large number of conventional uranium mines discontinued production, went bankrupt and left behind huge volumes of uranium mining and processing wastes, extensive areas of degraded land and surface and ground water resources contaminated on an unprecedented scale. Large scale remediation programs were deployed in several countries, such as The Uranium Mill Tailings Remedial Action (UMTRA) of the US Department of Energy. The Wismut Remediation Program of the German Federal Ministry of Economics. Individual remediation projects in Canada (e.g. the National Uranium Tailings Program and decommissioning in Elliot Lake and elsewhere) and Australia (e.g. Rum Jungle and Mary Kathleen). The European Commission’s Multi-Country Phare Program for uranium legacy sites remediation pilot projects in Central and Eastern European Countries (CEEC). Important lessons have been learned from the mentioned programs/projects. …and made UMREG focus on how to optimize the UPC and prevent the generation of new legacy sites. UMREG Balanced Resources Management

UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 The UMREG Mission: •Provide an international forum for exchange of experience among operators, regulators and stakeholders of uranium mining and remediation and facilitate constructive approaches among the involved parties •Maintain a data and information system and a worldwide network of experts, and makin their cumulative experience available to members and partner organizations. •Advocate, educate and support technology and know how transfer. The UMREG goals are pursued in agreement with the international standards recommended by IAEA UMREG Balanced Resources Management 6

UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Present activities The UMREG activities are supported within the IAEA Project 1.2.1.2 “Supporting Good Practices in Uranium Production” UMREG provides a non-commercial forum for exchange of ideas, approaches and strategies among producers, remediation companies, regulators and stakeholders. UMREG promotes and assists in development of remediation projects for legacy sites; introduction of international standards and good practice; prevention and limitation of waste generation within the Uranium Production Cycle (UPC); and, maintenance of environmental, socio-economic and material balances within the UPC The shared experiences in UMREG shows that project cash flow and low-impact UPC can be balanced (and synergetic) if the production and waste streams are transparently accounted for and life-cycle economics is applied. UMREG Balanced Resources Management 7

UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Assistance provided by UMREG: Introduction of an economically and environmentally balanced approach to uranium mining, processing, waste management and remediation through optimization of the mining life cycle at each stage; Establishment of remediation plans for the remaining legacy sites to contain the health and environmental risks they present and facilitate subsequent utilization of these sites; Harmonization of the practice of mining, processing, waste management and remediation with the international standards and balancing the production technologies with introduction of low impact waste management technologies and their monitoring; Management of stakeholders involvement in the process of uranium mining, processing and remediation. UMREG Balanced Resources Management 8

UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 This is an example of an un-remediated legacy site. We want to prevent the generation of such sites and remediate the remaining legacy sites UMREG Balanced Resources Management

UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 UMREG Balanced Resources Management

UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Lessons learned at the legacy sites - Conclusions for the UPC Remediation costs may exceed the mining profits if the balance of production and waste generation is not kept under control. The costs of remediation of the environmental impact were higher for the sites, which were abandoned, i.e. personnel, infrastructure and machinery were no more available at the site. ISL/ISR projects besides having considerably better economics and generating less waste than conventional mines has the advantage of providing the possibility of concurrent production and remediation that reduces remedial costs. The regulatory requirement of having remedial plans and assurance of remedial funds for the new projects should be mandatory. Prevention/minimization of the generation of legacy wastes, site impacts is the best strategy at all stages of the UPC the planning of measures along those lines should start already at the stage of design of the mine and processing plant. A number of projects demonstrated that international seed money and partial funding of remediation can provide an effective incentive for the national governments to allocate funds (or match funding) for remediation of the legacy sites. UMREG Balanced Resources Management

UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Balancing the Uranium Production Cycle (UPC) No Uranium Production Phases Waste, Health, Environmental and Societal Issues Pre-Construction 1 2 3 Exploration of Resources; Proving up Reserves; Feasibility study, Project Preparation and EIA; Evaluation and design of mining and processing options; Planning of operations; Licensing Segregation and disposal of exploration wastes, radioactive (e.g. ore samples, cores) and conventional; Minimization of health and environmental impacts, waste generation, and discharges at all stages of UPC. Estimation of the Environmental Baseline. Remediation funding Construction and Production 4 5 6 7 Mining of Ore Transportation Ore Processing → “Yellow cake” (U3O8 or other forms) Closure planning; Decommissioning and demolition Monitoring of operations and environmental baseline; Minimize contamination due to mine waste; Control of health and environmental risks. Diligent tailings management. Good record keeping of output. Segregation of radioactive/non-radioactive wastes. Post-Production 8 9 10 11 Preparation of remedial design and planning; Implementation of remedial works and water treatment; Regulatory clearance Regulatory assignment of the long term institutional control for management of the sites For containment of wastes, clean up of ground, sediments, water, ground water and handling of discharges. To reclaim land and water for utilization wherever possible. In accordance with the set criteria and after-use plan. Long term stewardship and maintenance (LTSM) of the site; Monitoring of integrity of containment and drainage. Safekeeping of data, records and remedial designs. UMREG Balanced Resources Management