Machine Installation and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.

Slides:



Advertisements
Similar presentations
PPPL,NFRI Study of Error Field and 3D Plasma Response in KSTAR J.-K. Park 1, Y. M. Jeon 2, In collaboration with J. E. Menard 1, K. Kim 1, J. H. Kim 2,
Advertisements

Potential Upgrades to the NBI System for NSTX-Upgrade SPG, TS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
Study of tearing mode stability in the presence of external perturbed fields Experimental validation of MARS-K/Q and RDCON codes Z.R. Wang 1, J.-K. Park.
NSTX-U T&T TSG Contributions to FY15 JRT NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U.
NSTX-U FY2014 Q3 progress report: Upgrade Construction Progress Ron Strykowsky, Erik Perry, Tim Stevenson, Larry Dudek, Jim Chrzanowski, Steve Langish,
Team Meeting April 25, 2014 NSTX-U Construction Progress NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U.
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
Operations Notes Updates Since Last Team Meeting Stefan Gerhardt NSTX Team Meeting B318 January 3 rd, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
NSTX-U FWP 2015 Budget Planning Meeting-NSTX Upgrade Status- Ron Strykowsky – 4/10/ NSTX Upgrade Progress Overview Ron Strykowsky Erik Perry, Tim.
NSTX NSTX Team Meeting Jan. 3, 2013 NSTX Team Meeting Jan. 3, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX Team Meeting May 28, 2008 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
Quality Assurance Readiness for Operations Review Judy Malsbury, Head of QA Princeton Plasma Physics Laboratory NSTX Upgrade LSB B318 December 9-11, 2014.
NSTX-U Diagnostic Installations S.P. Gerhardt, B. Stratton, R. Kaita With help from A. von Halle, E. Perry, F. Jones NSTX-U Supported by Culham Sci Ctr.
Sustainment and Control Chapter Status Stefan Gerhardt 12/5/12 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
ISTP (and other…) Update Stefan Gerhardt NSTX-U Monday Physics Meeting Feb. 20, 2015 B318 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
EP-TSG session Meeting agenda et al. M. Podestà NSTX-U Research Forum 2015 EP-TSG session PPPL, Room B252 02/24/2015 NSTX-U Supported by Culham Sci Ctr.
Current status of high k scattering system J. Kim 1, Y. Ren 2, K-C. Lee 3 and R. Kaita 2 1) POSTECH 2) PPPL 3) UC Davis NSTX Monday Physics Meeting LSB-318,
NSTX-U Collaboration Status and Plans for: Charged Fusion Product Diagnostic FIU Werner U. Boeglin Ramona Perez, Alexander Netepenko, FIU D.S. Darrow PPPL.
1 Update on Run Schedule R. Raman NSTX Team Meeting PPPL, Princeton, NJ, 08 February, 2006 Work supported by DOE contract numbers DE-FG02-99ER54519 AM08,
RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Hebrew.
NSTX Team Meeting July 21,, 2011 NSTX TF Update NSTX Team Meeting July 21, 2011 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Prototype Multi-Energy Soft X-ray Diagnostic for EAST Kevin Tritz Johns Hopkins University NSTX-U Monday Physics Meeting PPPL, Princeton, NJ June 25 th,
Direct measurement of plasma response using Nyquist Contour Z.R. Wang 1, J.-K. Park 1, M. J. Lanctot 2, J. E. Menard 1,Y.Q. Liu 3, R. Nazikian 1 1 Princeton.
NSTX-U Program Update J. Menard NSTX-U Team Meeting B318 May 7, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl.
ASC SPG NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst.
ASC Five Year Plan Chapter Status Stefan Gerhardt NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu.
Wave Heating and Current Drive TSG: XMP for Recomissioning the HHFW System R.J. Perkins, J. C. Hosea Theory & Modeling: N. Bertelli NSTX-U Supported by.
NSTX Centerstack Fabrication Status James H. Chrzanowski and the NSTX Upgrade Team Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science.
NSTX-U Construction Erik Perry Princeton Plasma Physics Laboratory NSTX Upgrade Readiness to Operate Review LSB B318 December 9-11, 2014 NSTX-U Supported.
1 Roger Raman for the NSTX Research Team University of Washington, Seattle NSTX Run Usage 27 February – 5 May, 2006 NSTX Mid-Run Assessment PPPL, Princeton,
M&P TSG Prioritization for FY2015 and campaign startup M.A. Jaworski, C.H. Skinner, R. Kaita NSTX-U Science and Topical Science Group organizational meeting.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTXU Project Update Jim Chrzanowski, Larry Dudek, Erik Perry, Tim Stevenson, Ron Strykowsky and the Project Team October 4th, 2013 NSTX-U Supported by.
NSTX-U Collaboration Status and Plans for: X Science LLC Ricky Maqueda NSTX-U Collaborator Research Plan Meetings PPPL – LSB B318 April / May 2014 NSTX-U.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Some Halo Current Measurements in 2009 S.P. Gerhardt Thanks to: E. Fredrickson, H. Takahashi, L. Guttadora NSTX Results Review, 2009 NSTX Supported by.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by Vacuum Pumping, Gauging and RGA Systems W. Blanchard Princeton Plasma.
Safety Jerry Levine Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 May 2 - 3, 2012 NSTX-U Supported by Culham.
Macroscopic Stability TSG Pre-forum Meeting #1 J.W. Berkery Department of Applied Physics, Columbia University, New York, NY NSTX-U Supported by Culham.
NSTX Team Meeting February 7, 2007 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U.
EP-TSG: draft plans for commissioning & first research phases of NSTX-U operation M. Podestà, D. Liu, N. Gorelenkov, N. Crocker for the NSTX-U EP-TSG Pre-Forum.
NSTX-U Collaboration Plans for UCLA PI: Neal A. Crocker Co-PI: Prof. Troy Carter Grad. Student (planned 2 nd year onward) PPPL Research Contacts and Collaborators:
NSTX Team Meeting December 21, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Effect of 3-D fields on edge power/particle fluxes between and during ELMs (XP1026) A. Loarte, J-W. Ahn, J. M. Canik, R. Maingi, and J.-K. Park and the.
NSTX-Upgrade Magnetics And Related Diagnostics SPG NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX NSTX Team Meeting May 7, 2013 NSTX Team Meeting May 7, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
First results of fast IR camera diagnostic J-W. Ahn and R. Maingi ORNL NSTX Monday Physics Meeting LSB-318, PPPL June 22, 2009 NSTX Supported by College.
Tom Egebo PPPL Review of the NSTX TF Coil Repair Effort September 3 - 4, 2003 Cost & Schedule to Completion Supported by Columbia U Comp-X General Atomics.
NSTX NSTX TF, PF and umbrella Upgrade Internal ReviewFeb 24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX NSTX LidsJuly 6, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns Hopkins U LANL LLNL Lodestar.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX Team Meeting June 30, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX-U Disruption PAM Working Group – Controlled Shutdown XP Discussion S. A. Sabbagh and R. Raman Department of Applied Physics, Columbia University,
Planning for Toroidal Lithium Divertor Target for NSTX and Supporting Experiments on CDX-U/LTX R. Kaita Boundary Physics Science Focus Group Meeting July.
Upgrades to PCS Hardware (Incomplete) KE, DAG, SPG, EK, DM, PS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Presently Planned Vacuum-Side Diagnostics for the NSTX-Upgrade Center Column NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Preliminary Results from XP1020 RFA Measurements J.W. Berkery Department of Applied Physics, Columbia University, New York, NY, USA NSTX Monday Physics.
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX-U Collaboration Status and Plans for: M.I.T. Plasma Science and Fusion Center Abhay K. Ram, Paul Bonoli, and John Wright NSTX-U Collaborator Research.
Monitoring impact of the LLD Adam McLean, ORNL T. Gray, R. Maingi Lithium, TSG group preliminary research forum PPPL, B252 Nov. 23, 2009 NSTX Supported.
Research Operations Update Stefan Gerhardt NSTX-U Team Meeting B-318 December 4 th, 2014 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Comments on HC Measurements for NSTX- Upgrade SPG CS Upgrade Meeting 11/2/11 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
J-W. Ahn 1 K.F. Gan 2, F. Scotti 3, R. Maingi 1, J.M. Canik 1, T.K. Gray 1, J.D. Lore 1, A.G. McLean 4, A.L. Roquemore 3, V.A. Soukhanovskii 4 and the.
NSTX Team Meeting August 9, 2011 NSTX TF Update Team Meeting August 9, 2011 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
Neutron diagnostic calibration transfer XMP D. Darrow and the NSTX Research Team XMP & XP review meeting Control Room Annex June 11, 2015 NSTX-U Supported.
Profiles Variations in NSTX-U and their Potential Impact on Equilibrium and Stability Magnetoboss 12/6/2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
NSTX NSTX Upgrade Project – Final Design ReviewJune 22-24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Presentation transcript:

Machine Installation and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 October 2 nd & 3 rd, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl Res, Kiev Ioffe Inst TRINITI Chonbuk Natl U NFRI KAIST POSTECH Seoul Natl U ASIPP CIEMAT FOM Inst DIFFER ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep Coll of Wm & Mary Columbia U CompX General Atomics FIU INL Johns Hopkins U LANL LLNL Lodestar MIT Lehigh U Nova Photonics Old Dominion ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Illinois U Maryland U Rochester U Tennessee U Tulsa U Washington U Wisconsin X Science LLC

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Topics Outage Planning Outage Coordination Installation Risks and Mitigations Outage Progress in 2013 Remaining Structural Work Work Once Centerstack is in NSTX Test Cell Tasks to Prepare for Return to Operations

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Outage Planning Outage planning based on bottoms-up estimates from Engineering –Assumes just 5 days per week for almost all tasks Assigns technicians, by name, to critical scope to assure staffing requirements are met Adjust start dates of tasks to assure tasks in the same area are compatible Accelerate tasks that make other tasks safer or more efficient Work crews on opposite sides of vacuum vessel or on different shifts Daily / hourly coordination of all field work is critical

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Outage Coordination Use of Work Control Center (like TFTR D&D Project) to oversee and coordinate all activities in the NSTX Test Cell All work in the NSTX Test Cell being done with Engneering Work Packages (EWPs) Work Control Center reviews all EWPs for the field –Reviews removal/installation procedures –Reviews Job Hazard Analysis (JHA) –Attends pre-job and post-job briefs –Interfaces between Engineering and the field crews –Assures that the field work is done safely and correctly –Assures the field crews are used efficiently

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Outage Coordination Daily Plan-of-the-day meetings to coordinate activities between crews and fine tune technician assignments –Includes field crew leaders, QA, Safety, Health Physics, Industrial Hygiene, DOE –Adjustments based on actual progress and manpower availability Flexibility for adjustments comes from –Second shift work –Multiple crews working on opposite sides of the vessel –Having many work packages ready for field work Safety and efficiency from –Temporary platforms to improve efficiency –Trial fit-ups to verify handling techniques and minimize time spent on NSTX –Temporary platforms to improve access and safety (inspected every shift) –Plan work so crews are on opposite sides of machine

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Installation Risks and Mitigations Delays in getting parts delivered to installation crews –Re-schedule work sequence –Schedule work on two shifts once parts arrive Scope creep –Engineering Change Proposal process –Review of engineering estimates by division heads (WAF review) Fit-up of new centerstack –Estimate includes three fit-ups

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Outage Progress in 2013 Install new umbrella legs / feet / slides Install umbrella arch reinforcements

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Outage Progress in 2013 Install reinforcements for TF to umbrella interface

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Outage Progress in 2013 Replace PF2/3 clamp hardware and install additional PF2 clamps Install new PF4/5 supports and replace existing hardware (still in progress)

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Outage Progress in 2013 Modify vacuum vessel legs to clear new TF turnbuckles

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Outage Progress in 2013 Move two TF outer legs to new locations (to make room for other work) Install two new TF outer legs to replace ones taken out of service

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Outage Progress in 2013 Re-silverplated leads on TF outer legs

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Outage Progress in 2013 Installed new cable tray around top of machine –Walking surface included in top of tray

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Outage Progress in 2013 Installed most of the TF outer leg upper support structure –Successfully proven out this very challenging installation procedure

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Remaining Structural Work Finish installing new PF4/5 supports and replace existing columns Install new TF outer leg lower supports Install new centerstack pedestal Install TF outer support turnbuckles Add extensions and anchors to vacuum vessel leg struts

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Work Once Centerstack is in NSTX Test Cell Lift centerstack casing over the OH/TF bundle Install PF1A upper coil Install kapton/G10 flash shields Lift centerstack into vacuum vessel Install TF flex bus support rings Install ceramic break assemblies Install organ pipes Install instrumentation cables to centerstack Install CHI flags Install edge tiles in-vessel

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Work Once Centerstack is in NSTX Test Cell Install bus inside umbrella and back to racks Install new TF flex bus Field measure space between centerstack and all TF flags Fabricate 72 unique centerstack to TF flag links Install umbrella lid support rings Install new umbrella lids

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Tasks to Prepare for Return to Operations Clean, photo and close the vacuum vessel Pumpdown Leak check Bakeout All routine tasks at the end of an outage

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Summary The Upgrade Outage has been planned based on –Bottoms-up estimates from Engineering –Identifying staff to do the work –Scheduling work to avoid conflicts The plan is being continually worked –To improve safety and efficiency –To deal with delays in getting parts –To accelerate tasks to make full use of resources Coordination and Control –Provided by the Work Control Center –At the Plan-of-the-day meeting –Continuously by the Field Supervisors Successfully performing the outage (SPI= 0.97, CPI= 1.09) –Will turn over NSTX to Operations in a fully ready condition