S.R. 46 Sight Distance Improvement Project at County Line Road.

Slides:



Advertisements
Similar presentations
U.S. 20 Added Travel Lanes Project 0.8 mile east of C.R. 17 to S.R. 15 in Elkhart County Thursday, October 27, :30pm Presentation Northridge High.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
U.S. 50 Bridge Replacement over Tanner Creek Tuesday, June 25, :30 p.m. Presentation Lawrenceburg Fire Department Lawrenceburg, Indiana.
Public Meeting Presentation March 15, Project Location Project Purpose –Traffic reliever to I-95 –Integrate road with the Northwest Sector Plan.
U.S. 20 Pavement Replacement Project Michigan City High School Wednesday, September 17, 2014.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
Proposed S.R. 26 Pavement Replacement Project Thursday, December 13, :00 p.m. Presentation East Jay Middle School 225 East Water Street in Portland.
State Road 46 Pavement Replacement Owen Valley High School Wednesday, September 3, 2014.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
S.R. 1 Intersection Improvement Project Wells County Public Library, Bluffton, IN 6:00 p.m. Presentation Thursday, April 24, 2014.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
I 65 Added Travel Lanes Project Clark County Ivy Tech Community College Thursday, March 12, 2015.
S.R. 3 / South State Street Added Auxiliary Lanes Project in North Vernon Thursday, August 9, p.m. Jennings County High School.
U.S. 33 Northern Connector Alternative
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
S.R. 3 / South State Street Added Auxiliary Lanes Project in North Vernon Wednesday, June 29, :30pm Presentation Jennings County High School.
I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012 South Grove Intermediate School Beech Grove, Indiana.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
U.S. 231 Intersection Improvement in North Spencer County Heritage Hills High School Thursday, April 30, 2015.
INDOT Rumble Striping: A Systemic Safety Measure June 4 th, 2015.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
U.S. 150 / S.R. 56 Roadway Rehabilitation Project Thursday, August 22, :00 p.m. Presentation Orange County Community Center Paoli, Indiana.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
U.S. 24 over Tippecanoe River Bridge Replacement
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
SR25 Preventative Maintenance Project in Tippecanoe County
Interchange Modification U.S. 41 at S.R. 62/66 (Lloyd Expressway) 6:00 p.m. Presentation Thursday, November 15, 2012 Southern Indiana Career & Technical.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Local Government Section
U.S. 224 Road Reconstruction Project from the St. Mary’s River Bridge to just east of Jackson Street in Decatur, Adams County 6:30pm Presentation Erekson.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
Introduction to Transportation Engineering Alignment Design Vertical Alignment Instructor Dr. Norman Garrick Hamed Ahangari May 2014.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
U.S. 150 / S.R. 56 Road Reconstruction Project in Paoli, Orange County Thursday, August 25, :00pm Presentation Orange County Community Center 1075.
U.S. 33 Road Reconstruction Goshen High School Auditorium 6 p.m. Wednesday, August 20, 2014.
CE303: Introduction to Construction Blueprint Lab.
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013 SBCAG North County Subregional Committee State Route 246 Passing Lanes.
Bridge Replacement and Road Realignment on U.S. 6 over Norfolk Southern Railroad Albion Municipal Building Thursday, October 22, 2015.
US 25 Corbin to London Citizens Advisory Committee Meeting December 2011.
Engineering Study Griffin View Drive & Harbor Hills Blvd. Prepared for Lake County Public Works Engineering 437 Ardice Avenue Eustis, Florida Purchase.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Geometric Design: General Concept CE331 Transportation Engineering.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
HAMILTON COUNTY SR-317 (Bonny Oaks Drive) Widening From SR-17 to I-75 January 21, 2016 Robert Rodgers - C.E. Manager 2 TDOT Region 2 Project Development.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, January 21, 2016.
I-465 at I-65 Interchange Modification Public Meeting 6 p.m., Thursday, August 14 South Grove Intermediate School, Beech Grove, IN.
FHWA: Revision of Thirteen Controlling Criteria for Design; Notice for Request and Comment. Comments Due: December 7, 2015 Jeremy Fletcher, P.E., P.S.M.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
The I-465 West Leg Reconstruction Project
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Project Management Team Meeting #3
Investigation of Road Project
S.R. 26 Road Rehabilitation in Clinton County
Walker Street Reconstruction Project 25% Design Public Hearing
S.R. 261 Intersection Improvement at Fruitwood Lane in Newburgh
U.S. 20 at State Road 2 New Interchange
Presentation transcript:

S.R. 46 Sight Distance Improvement Project at County Line Road

S.R. 46 Sight Distance Project Project proposes to improve the intersection sight distance on S.R. 46 and Owen/Monroe County Line Road Purpose of project is to address stopping distance at S.R. 46 and County Line Road

Project Features Lowering the hill on S.R 46 to address sight distance Wider shoulders on S.R. 46 Project involves 4,700 feet of improvements along S.R. 46 1,200 feet of improvements on Owen/Monroe County Line Road New cross section on S.R. 46 will be shifted approximately 62 feet to the south at the intersection with County Line Road

Project Features Horizontal and vertical alignments are being revised to provide the intersection sight distance required. Profile of road will be improved by cutting the hill area and filling the sag portion of the roadway to accomplish proper grade. The new roadway section for County Line Road will consist of two 11ft lanes and 3ft shoulders (2ft paved). Vertical alignment for County Line Road will be adjusted to connect to the new grade on S.R. 46

Project Details Construction tentatively set to begin: Late Spring 2012 and continuing through 2013 Speed Limit will be reduced to 45mph on S.R. 46 during construction. Once construction is complete the speed limit will return to 55mph. Traffic will be maintained during construction S.R. 46 will be open to two way traffic at all times. Temporary traffic lanes will be constructed to maintain traffic at all times. Construction phasing will be utilized to keep the road open to traffic during construction

Project Details Traffic will not be detoured on S.R. 46 County Line Road will be closed during certain phases of construction A detour route will be marked for County Line Road Traffic The local detour will utilize Mr. Carmel Road, County Road 375E, County Road 350E, W. Flatwood Road, County Road 175S, Walden Road and Hardscrabble Road

Project Development Process Engineering Assessment Project purpose & need develop project alternatives Screen project alternatives Additional work on project alternatives & preliminary design Release environmental document & preliminary design Public Hearing to solicit public comment 2009 Right-of-WayConstruction

Public Involvement Team Rickie Clark, INDOT Office of Public Involvement (317) Glenda Seal, Seymour District Customer Service Center Manager, Danny Pearcy, S.R. 46 Project Manager

Project Resource Location Seymour District Office, 185 Agrico Lane, Seymour, Indiana Responsible for transportation construction, maintenance and development activities in Southeast Indiana (877) Kathy Eaton-McKalip, District Deputy Commissioner Glenda Seal, Customer Service Manager Danny Pearcy, Project Manager Greg Prince, Media Relations Director