ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.

Slides:



Advertisements
Similar presentations
Process and Product Quality Assurance (PPQA)
Advertisements

CSUN Engineering Management Six Sigma Quality Engineering Week 11 Improve Phase.
Lean Six Sigma Project Presentation Template
Project leaders will keep track of team progress using an A3 Report.
Project Storyboard Template
Pg 1 Why Learn About SIPOC And Process Maps? Document actual high level process Clarify customers, suppliers, inputs, and outputs Communicate information.
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.
Six Sigma Introduction Supply Chain Leadership Committee
Overview of Lean Six Sigma
6  Methodology: DMAIC Robert Setaputra. PDCA / PDSA PDCA / PDSA is a continuous quality improvement tool. PDCA is introduced by Shewhart. PDSA is Deming’s.
Barry Murash MBBit Nortel 2007
Overview of DMAIC A Systematic Framework for Problem Solving
Six Sigma What is Six Sigma?
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Do not put content on the brand signature area Basic template Subtitle Location – Date Name of the speaker Job title.
Using Six Sigma to Achieve CMMI Levels 4 and 5
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
“Safety is a Measure of Success”
Black Belt Level DMAIC Certification Checklist
DMAIC Process Storyboard
Six Sigma at Boston Scientific Tuesday 12 September 2006 Steve Czarniak BSC Six Sigma: ASQ Meeting – 12 September 2006.
Welcome to Lean Six Sigma Green Belt Training
Black Belt Project Storyboard Template
NDIA Systems Engineering Supportability & Interoperability Conference October 2003 Using Six Sigma to Improve Systems Engineering Rick Hefner, Ph.D.
First Developed by Motorola in the mid 1980's, the methodology only became well known after GE's Jack Welch made it a central focus of his business strategy.
Define Tollgate Checklist
© 2001 Six Sigma Academy © 2003 Six Sigma Academy1 Champion Workshop Key Concepts.
Six Sigma Overview Presented by: >. Agenda What is Six Sigma? History of Six Sigma Six Sigma Methodology When to use Six Sigma? Different Six Sigma belts?
1 DMAIC Define Overview Paul Grooms Black Belt in Training.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
DMAIC 1. (Define, Measure, Analyze, Improve and Control) is a process for continual improvement. It is a systematic and fact based approach to plan, sequence.
Project Storyboard (Page 1 of 2)
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
Using Total Quality Management Tools to Improve the Quality of Crash Data John Woosley Louisiana State University.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
METODOLOGI SIX SIGMA PERTEMUAN 11 ANALYZE PHASE OLEH: EMELIA SARI.
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Define Phase Wrap Up and Action Items. Define Phase Overview—The Goal The goal of the Define Phase is to: Identify a process to improve and develop a.
TM 720: Statistical Process Control DMAIC Problem Solving
Practical Assessment Project Template

The DMAIC Method
Lean Six Sigma Road Map Improvement Process Road Map
LEAN SIX SIGMA PROJECT TEMPLATE
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
Six Sigma Approach.
Control Phase Wrap Up and Action Items
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Define Phase Wrap Up and Action Items
Practical Assessment Project Template
Lean Six Sigma DMAIC Improvement Story
DMAIC Project Template
OPS/571 Operations Management
Presented By: <Names> <Team Name> <Date>
Lean Six Sigma DMAIC Improvement Story
Framework for Success: DMAIC
Certification Project Template
LEAN SIX SIGMA PROJECT TEMPLATE
LEAN SIX SIGMA PROJECT TEMPLATE
Project Champion: Process Owner: Organization: Project Location:
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
The 7 Basic Quality Tools ~ The DMAIC Process
Measure Phase Wrap Up and Action Items
QMS, ISO and Six Sigma It’s all related…..
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series

To solve problems and to avoid the re-occurrences of these problems a structured and data-based method, called DMAIC, is used. Define customer expectations of the process Measure the frequency of defects Analyze why, when and where the defects occur Improve process operation by eliminating waste and variation Control the process so it stays fixed and sustainable D M A I C

DMAIC Flowchart: Method of Improving Exiting Processes

DMAIC: Define Define – What is important?  Scope and boundary  Define defects  Team charter and champion  Estimated project impact  Leadership approval

DMAIC: Define Objectives  To identify or validate the improvement opportunity.  To develop the business processes, define critical customer requirements, and prepare to be an effective project team. Main Activities  Validate/Identify business opportunity  Identify stakeholders  Identify team members  Develop team charter  Identify and map process  Identify quick wins  Develop team guidelines and ground rules  Define project Y’s

DMAIC: Measure Measure – How are we doing?  Map process and identify inputs and outputs  Cause and effect matrix  Establish measurement system capability  Establish process capability baseline

DMAIC: Measure Objectives  To identify critical measures that are necessary customer requirements and begin developing a method for effectively collecting data to measure process performance.  To understand the elements of Six Sigma calculation and establish baseline sigma for the process in question Main Activities  Identify input, process, and output indicators  Develop operational definition and measurement plan  Plot and analyze data  Determine if special cause exists  Cause and effect matrix  Collect other baseline performance data  Failure modes and effect analysis

DMAIC: Analyze Analyze – What is wrong?  Complete FMEA  Perform multivariate analysis  Identify potential critical inputs  Develop plan for next phase

DMAIC: Analyze Objectives  To identify and validate the root causes that create the problem the team is focused on.  To determine true sources of variation and potential failure modes that lead to customer dissatisfaction. Main Activities  Stratify process  Stratify data & identify specific problem  Develop problem statement  Identify root causes  Design root cause verification analysis  Validate root causes  Comparative analysis  Sources of variation analysis  Regression analysis  Process control  Process capability  Design of experiments

DMAIC: Improve Improve – What needs to be done?  Verify critical inputs  Optimize critical inputs

DMAIC: Improve Objectives  To identify, evaluate, and select the right improvement solutions.  To develop a change management approach to assist the organization in adapting to the changes introduced through solution implementation. Main Activities  Design of experiments  Response surface methods  Generate solution ideas  Determine solution impacts: benefits  Evaluate and select solutions  Develop process maps & high level plan  Develop and present storyboard  Communicate solutions to all stakeholders  Develop pilot plan & pilot solution

DMAIC: Control Control – How do we guarantee performance?  Implement control plan  Verify long term capability  Continuously improve process

DMAIC: Control Objectives  To understand the importance of planning and executing against the plan and determine the approach to be taken to assure achievement of the targeted results.  To understand how to disseminate lessons learned, identify replication and standardization opportunities/processes, and develop related plans. Main Activities  Verify that reduction in root cause sigma resulted from solution  Identify whether additional solutions are necessary to achieve goal  Identify and develop replication and standardization opportunities  Integrate and manage solutions in daily work processes  Integrate lessons learned  Identify teams next steps and plans for remaining opportunities