ARUP Studies Update ILC Interaction Region Design Requirements John Osborne CERN, Yung Loo & Matt Sykes (ARUP) CFS-ADI Joint Meeting - University of Tokyo.

Slides:



Advertisements
Similar presentations
Kitakami IR Access Discussions T. Markiewicz/SLAC 13 May 2014 SiD Meeting / AWLC Fermilab.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
SiD assembly Marco Oriunno (SLAC), May. 14, 2014 ALCW 2014, Fermilab Infrastructures & Timeline for Hybrid Access.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
Investigation of FCC position Impacts on Hadron Injectors John Osborne, Charlie Cook, Yung Loo (ARUP) 16/09/2014.
ILC CFS / CLIC CES Studies for the Interaction Region : - An action was given at the Geneva Linear Collider Meeting for CFS to develop a more in-depth.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Geotechnical & Civil Engineering Studies Future Circular Colliders (FCC)
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
LCWS2013 (Asian Region) CFS 12th November Experimental Hall 3D deformation analysis Asian Region Design CONVENTIONAL FACILITIES AND SITING.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
Interaction Region Studies for a Linear Collider at CERN - Detector ‘push-pull’ slab design - Cavern assessment Matt Sykes.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
PD5: Detector Integration / Machine Detector Interface T. Markiewicz/SLAC 15 May 2014 SiD Meeting / AWLC Fermilab Summary.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
1 J.Osborne (CERN)
CLIC Experimental Area Layout Design Considerations & ARUP Study A. Gaddi, H. Gerwig, M. Herdzina, H. Hervé, N. Siegrist, F. D. Ramos.
1 SiD Push-pull Plans Marco Oriunno, SLAC International Workshop on Linear Colliders 2010 Geneva, October 2010 M.Oriunno, IWLC10 – Geneva, Oct.2010.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Report from ARUP meeting Andrea Gaddi, CERN Physics Department.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
FCC-hh MDI 5 th Meeting Friday 13 th March 2015 Civil Engineering Layouts for Experimental Caverns – First Draft Charlie Cook (GS), John Osborne (GS)
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
1 May 22, Y.Sugimoto Update of detector hall in mountain region.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
5 December 2011 Task 2 Cavern Study Ground model and 3D cavern layout Matt Sykes Eden Almog Alison Barmas Yung Loo Agnieszka Mazurkiewicz Franky Waldron.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
Matt Sykes Andy Kervell Yung Loo Heidi Clough Craig Sturzaker ARUP: Update on GIS Model and tunnel options under lake.
CES Studies at CERN for the Interaction Region : -Summary of Linear Collider IR meeting at CERN held on 16 February Design Brief for external design.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Joint Institute for Nuclear Research Deformations and stresses in the flux return yoke A.Efremov, Yu.Lobanov, A.Makarov Darmstadt,
Philip Burrows SiD Monthly Phone Meeting, 4/10/071 IR Issues from IRENG07 Philip Burrows John Adams Institute Oxford University.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
FCC Underground Infrastructure
SiD Collaboration Meeting SLAC, December 2011
CLIC Civil Engineering Update
Updated Design of Detector Hall
Introduction and Meeting Objectives
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Marco Oriunno (SLAC), March 12, 2014 MDI WG
CLIC Civil Engineering & Infrastructure
Acknowledgements to all FCC study teams
Experimental hall design in Japanese site
Interaction Region Alternative Layouts
Detector Service Cavern for ILC
Dead zone analysis of ECAL barrel modules under static and dynamic loads for ILD Thomas PIERRE-EMILE, Marc ANDUZE– LLR.
Detector hall in mountain regions
CLIC Civil Engineering Update
Tom Lackowski Revised 10/12/2011
Detector hall in mountain regions
RDR Baseline Layouts for Interaction Region
Kitakami IR Access Discussions
8-10 April 2014 CFS-ADI Joint Meeting
Presentation transcript:

ARUP Studies Update ILC Interaction Region Design Requirements John Osborne CERN, Yung Loo & Matt Sykes (ARUP) CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014

2 ARUP - Study Mandate Review key requirements and specifications from the European Region LC IR & MDI studies. Review against the Asian Region design concept requirements. Compare and identify implications of any changes. Any potential changes to be registered. Recommendations / implications / adherence issues to be identified between the ILD/SID design criteria and the LC design for the Asian Region. Current on-going CFS meetings have focussed on Asian Region detector hall access optioneering (i.e. HT,VS,HT/VS). - Therefore review has been modified to aid current progress. - Potential for requirements review to aid decision process for optioneering outcomes.

3 Summary of ARUP – European Region Review of IR Cavern Layout Studies 1. Geotechnical & Tunnelling Studies Design Concept for IR Cavern Layout. Invert Deformation Performance Requirements Identification. Geological Review & Geotechnical Modelling.

4 Summary of ARUP – European Region Review of IR Cavern Layout Studies 2. Mechanical Engineering Studies Design Concept for Detector Platform Movement System. Mechanical systems modelling. Slab Performance Requirements Identification. 3. Combined Geotechnical, Mechanical modelling  Slab + Cavern design concept & requirements

5 LC IR Design Requirements CFS design considerations: - Requirements from European Region for LC IR detector hall layout and MDI Preliminary identification of if/how requirements have been considered and impacted in: - Asian Region CFS – Experimental Hall 3D Deformation Analysis Presentation 1 - Kitakami Mountains Geological Survey Report 2 - Progress Report on IR Vertical Shaft Study 3 Identification of how requirements may help to differentiate between different layout options (i.e. HT / VS / HT&VS) 1. CFS weekly meeting presentation (Aspects to be clarified by Asian Region team - Japanese language report) 2. Oyo Corporation Report CFS weekly meeting presentation

6 LC IR Design Requirements Requirement Engineering Specification Affected by Geotechnical Conditions? Considered in Asian Region CFS Study? Affected by cavern layout? i.e. HT/VS/HT&VS option 1 Maximum Detector Weight tons  2 Movement duration 5 hours  ?  3Speed> 1 mm/s  ?  4 Number of movements 10/year  ?  5 Limit of acceleration 0.05m/s 2  ?  6 Maintenance allowances 2m (On Beam)  ?? 7 Maintenance allowances 6m (Off Beam)  ?? 8 Positioning relative to beam ± 1mm  (but driven by criteria 10)?? 9Slab Vibration20Hz  ??  : Not Affected  : Affected / Considered in Asian Region Studies ?: Check with Asian Region Studies if has been considered

7 LC IR Design Requirements Requirement Engineering Specification Affected by Geotechnical Conditions? Considered in Asian Region CFS Study? Affected by cavern layout? i.e. HT/VS/HT&VS option 10 Static deformation of platform limited to ±2mm   (only HT option)  11 Layout configuration “Z” – CLIC.CE G   (only HT option)  12 Ground Conditions CERN - Molasse Basin   (Kitakami)N/A 13 Machine platform footprint 20 x 20m  14 Min. Distance between Detectors 15m  ?? (HT&VS option) 15 Magnetic field at top of platform <1,000 gauss  ?  16 Operating Temperature Range 20°C ±2°C  ?  17 Platform Movement System Rollers or Air Pad  ?   : Not Affected  : Affected / Considered in Asian Region Studies ?: Check with Asian Region Studies if has been considered

8 Requirements affected by Geotechnical Conditions Aspects to consider 9. Slab Vibration - Asian Region Study considers a 3m thick slab. European Region Slab frequency limits are based on: ILD slab - 2.2m thick | SiD slab - 3.8m thick. Effect of this on slab freq. req.? - Potential seismic effects on vibration? - Granite much stiffer than molasse, may lead to different dampening effects of detector hall structure - potential dynamic effects may need to be considered in further analyses. 10. Static deformation of platform - Asian Region Study considers c ombined slab + invert deformation (elastic FE Analysis) - Consideration of further deformation effects: - Geomechanical/kinematic deformation? - Seismic effects?

9 Requirements affected by Geotechnical Conditions Aspects to consider 11. Layout configuration - Z-configuration has an advantageous geometry in terms of stress shielding effects on IR compared with HT/’HT&VS’ options. - Conceptually: Shafts and compact symmetric shape of Z-config may have a generally stiffer structure, and non-cantilevered shape compared with HT option with access tunnel. - HT option at greater comparative depth: - Potentially greater overburden stresses - Potentially increased engineered access tunnel excavation requirements

10 Requirements affected by Geotechnical Conditions Aspects to consider 90m 200m HT D11m Grad7% Assembly Yd DH Straight 5 SFTs 1 Main SFT 1 ILD SFT 1 SiD SFT 2 EV SFT Assembly Yd Upper A/T DH Z-shape DHDH Upper HT HT D8m Grad10% 2 SFTs 1 Main SFT 1 UT/EV SFT HT access (baseline)VS accessHT & VS access 11. Layout configuration

11 Requirements affected by Geotechnical Conditions Aspects to consider 15. Magnetic field at top of platform - Geological Survey [Oyo Corp]: ‘granite of the Kitakami Mountains is I-type granite of the magnetite series.’ - Magnetite is highly magnetically susceptible. Further studies needed? 16. Operating Temperature Range - Mountainous regions may have localised densening of geothermal heat fluxes, especially in valleys. Effect on heat exchange with caverns/tunnels and operating temperature? Opportunity for heat exchanger for tunnel cooling / heat extraction?

12 Potential non-geotechnical/tunnelling issues Aspects to consider 6. Maintenance allowances - Are HT/’HT&VS’ layouts space-proofed for maintenance allowances? - e.g. Is there additional allowances for platform support spacing during slicing 14. Minimum distance between detectors - Can 15m distance be maintained on ‘HT&VS’ layout. Can this distance be maintained when either machine is on beamline?

13 Potential non-geotechnical/tunnelling issues Aspects to consider Are there benefits to any of the access layouts in terms of shafts vs horizontal/inclined tunnel access for: Interventions points and emergency access Heat release, forced ventilation and potential Helium release Routes for maintenance and installation/removal access. CMS type assembly helps to mitigate the impact of any delays in the underground civil works (this implies VS Solution)

14 Further Steps Confirmation of the identified ‘?’ requirements with Asian Region study teams. Identify their effects and which requirements need further assessment/discussion. Following continued development of the MDI design, to identify if these impact on geotechnical/tunnelling requirements Requirements gathering can be used as a decision aid to differentiate between the 3 access layout options. - To decide if requirements review should form part of this decision process, or be a compliance tool which proceeds a developed choice on access layout.