 Design Stage  Affect on Quantities Post-Bid  Affect on Contractor  Affect on Relationships  Enhancement of Construction Plans.

Slides:



Advertisements
Similar presentations
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Advertisements

Constructability Review
COBB COUNTY DOT CHANGE ORDERS & SUPPLEMENTAL AGREEMENTS Georgia Chapter of ASHE Presented by Mike Cates Pre-Construction Engineer Cobb County Department.
Highway & Rural Driving
Culvert Inventory and Assessment Protocol 2015 Field Season.
GeoPak Ver Update New Criteria Enhancements since last year. Using Backslope Override and the Backslope Constraint Line(BCL)
Chapter 3: Elements of Design Transition Design Controls (p
Road Design Basic Road Design
Transportation Tuesday TRANSPORTATION TUESDAY There’s nothing I hate more than intolerance (Anon) Remember the little guy... High in your truck or protected.
Driving Maneuvers and how to do them by J. M. Christensen and how to do them by J. M. Christensen.
Missouri Department of Transportation US Fish and Wildlife Service Squaw Creek National Wildlife Refuge Habitat Restoration Breakout Session Shannon Kusilek,
THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON.
Transportation Tuesday TRANSPORTATION TUESDAY CHANGE TAKES TIME HAS TRANSPORTATION TUESDAY MADE A DIFFERENCE TO YOU YET? SIX REMINDERS FOR SAFER DRIVING.
Measuring Sitework, Excavation, and Piling
Sample questions from the Rules of the Road units of the Driving Theory syllabus. ESOL for Driving.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
© 2009 Bentley Systems, Incorporated Chuck Lawson GEOPAK Product Engineer Advanced Intersection Design with Roadway Designer.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Delaware State Driver’s Education Study Guide. Drivers have trouble seeing motorcycles in traffic. Why?
EXAM 2 REVIEW. 1. Drainage problem (25 pts) Below you see a cross-section of a ditch. It runs parallel to a 200-acre field consisting of permanent pasture.
Profile Leveling.
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
Chapter 13 Site Plan Layout.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Lec 25, Ch.7, pp : Intersection types and design principles (Objectives) Become familiar with the typical intersection types (See figures 7-1 thorugh.
Harry Williams, Cartography1 Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is.
LPA – Utility Coordination Natalie Parks StructurePoint November 20, 2013.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Signals,Road Markings, Intersections, Sharing the Road
Stop Sign This is a traffic sign. This means to stop. It helps us be safe when driving.
ELECTRONIC DESIGN DATA MANAGEMENT. Directory Structure (GEOPAK Road Manual Chapters 1 & 2) MicroStation/GEOPAK files are stored in the t drive under t:\de-proj\county_designation\jobnumber.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
 Cross section elements consist of the following:  1.Traffic lanes (carriage ways);  2.Shoulders;  3.Medians;  4.Curbs;  5.Side slopes.
CAD Standards Presented by Gary Holeman PE Senior Design and Automation Engineer Roadway Engineering unit
Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is rare and/or.
Biking as Transportation Safely Today we will have a great and safe ride. We will use our bikes as transportation. We will ride in pods, following our.
Here’s your first homework Section Assignment: (use this format in all your assignments) Wrong = Missing = Name and assignment Problem group description.
CE303: Introduction to Construction Blueprint Lab.
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
People act carelessly and need to pay more attention. People cross the street at red lights when cars are coming. People smoke when they know it is bad.
Signals,Road Markings, Intersections, Sharing the Road.
E4014 Construction Surveying Road Construction Plans.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
STA Safety Project PID #76439 December 12, 2006.
Where are you going for your summer holiday? airport How are you going there for your summer holiday?
Tips. Crossing the road  On green light, look both ways and listen for traffic before crossing.
Evaluation and Redesign of Rojeeb Street. Objectives ▪ Evaluation of existing conditions of Rojeeb Street. ▪ Estimation of future conditions of Rojeeb.
Kevin R. Miller BYU Construction Management. Estimating today When was the last time you estimate a set of plans that were 100%? How do you perform quantity.
An Introduction to Contracts and Design Guides Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation.
INTEGRATED DESIGN PROJECT BFC 43303
Safety Audit Planned Project - Preliminary Design zGeneral Project Data yProject layout xRoad function Determine the road function. What kind of traffic.
Trimble GCS900 Grade Control System. Definition: Construction The act or result of – Conceptualizing (we need a airstrip) – Interpreting and planning.
A stop sign is a traffic sign that stands for coming to a complete stop at an intersection or end of the road.
IS (Image Station) Scanning capability (20Pt/Sec) imaging Long range High accuracy Not expensive solution Scanning capability (3500Pt/Sec) Imaging Medium.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
Obeying traffic rules. Heavy traffic Traffic jam.
Child Care Subsidy Program Online Billing Provider Training Spring 2016.
Gujarat Institute of Technical Studies name: Patel Savan Vasudevbhai Semester: 3 st Sem. Branch: Civil Engineering Enrollment No. : Sub: surveying.
Documenting Self Inspections The City of Hendersonville Department of Public Works Erosion Control Self Inspection Form Power Point Presentation.
Situations you may encounter while driving
Site Grading of Terrace
CONTOURS Engr. Randy G. Policarpio. Definitions: Contour – an imaginary line of constant elevation on the ground surface. Contour line – a line on the.
Signs and Symbols from Instant Art Traffic Signs CD-ROM
This section up here is a little tricky
PLAN PREPARATION BASICS GENERAL LAYOUT
School of Civil Engineering
ACEC Designer Training
Presentation transcript:

 Design Stage  Affect on Quantities Post-Bid  Affect on Contractor  Affect on Relationships  Enhancement of Construction Plans

 Survey  Subsurface Investigation  In-House construction of plans

 Control was not tied down  Used bad control information  Acquired insufficient or erroneous information  Topo all tie in points  Survey the existing crowns  Use of companies with poor past history  Same issues that contractors see  Flight Data Use  Accuracy

 Insufficient or incomplete boring information  Verification of information received

 Plan sheets  Construction Layout o Missing data o Profiles do not tie together o Side streets tied in wrong  Typicals – Plan Sheets – Cross Sections o Different information o Superelevations o Missing typical sections o Guardrail flares o ROW o Drainage ditches  Drainage o Incorrectly located o Superelevations o Low point o Missing structures

 Plan sheets  Structures o Alignments and elevations o Sloping caps and abutments o Boxouts o Wall profiles  Utilities o Not shown on the plans o Not depicted correctly o How do we design around this information?

 Plan sheets  Erosion o Areas are overwrought/untouched o Silt Fence at cut slopes and shoulders o Staging o Site visits  Staging o Drainage o Tapers o Widths  ROW o Drainage o Cost to cure information

 To the owner  To the contractor  To the designer

 Resurvey  Office calculations  Project delay  Quantity overrun  Cost  Quality  Public Opinion

Right now, your project would have to be considered a disaster. I could have walked from the fire station to Abernathy faster that was able to drive. Yet once past Abernathy, I was able to drive between 40 and 50 mph. There is a major flaw in your design that I can't believe. Just before Johnson's Ferry hits Abernathy coming from Sandy Springs, the road used to expand into two outbound lanes. That allowed you to queue up twice the number of cars waiting for the next green light. When that light turned green, those cars were able to take off in a straight line, rather than having to make a left turn. In other words, your new intersection is about 40% as efficient for all those commuters coming down Johnson's Ferry. If this abysmal design is not fixed, you will see accidents and potentially violent behavior at Sandy Springs Circle and and Johnson's Ferry road. Commuters will be furious if today's experience is truly representative of what you have created. I mean tar and feather, fire someone furious. I hope there is better to come. If not, someone in your office should experience career consequences for such an obviously horrible design. Regards,

 Contractor is not a designer  Understanding Design Intentions  Adversarial Relationships  How do we resolve problems?  Time to review and absorb plans  Building survey files  Resolve discovered omissions/errors or correct the contractor  Begin construction  Stake the project and absorb the stakes  Resolve omissions/errors discovered in the field (for the life of the project) o The superiority of the three dimensional field

 Survey is the key  Attention to detail  Incorporate knowledge from past mistakes  Neat and visible  Willingness to listen and help  No designer is perfect – no contractor is perfect  Compliment of views  Give and take (Total cooperation from owner/designer/contractor)

 Questions or Comments