1 Proprietary and Confidential New Jersey Clean Air Council Public Hearing April 1, 2009 Jeff Halfinger Babcock & Wilcox.

Slides:



Advertisements
Similar presentations
January 23, 2013 Emergence of New Regulatory Technical Requirements and Review Standards for Small Modular Reactor I&C Systems Troy V. Nguyen, Ph.D., P.E.
Advertisements

New Nuclear Plants in the United States
Region II WIN Feb © 2011 Babcock & Wilcox Nuclear Energy, Inc. All rights reserved. A practical, scalable, modular ALWR.
The Babcock & Wilcox Company Company Overview
NuScales Passive Safety Approach Update September 2011 Contact Information: Bruce Landrey Chief Marketing Officer Dr. Jose N.
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
1 Proprietary & Confidential © 2012 BrightSource Energy, Inc. All rights reserved. © BrightSource Energy, Inc. All rights reserved. 1 Ivanpah.
The Gas Advantage ! Information contained in this document is the intellectual property of Venus Gas Products & Services (Mysore) Pvt. Ltd. (VGPSPL) and.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Zycko’s data centre proposition The very best products and technologies Focus on what your customers need Turning products into solutions Wide range of.
Content of the Presentation
Nuclear Energy University Programs Small Modular Reactors August 10, 2011 Dan Ingersoll presented by Bob Hill.
NRC Status and Plans for New and Advanced Reactors Michael A. Norato, PhD Chief, Component Integrity, Performance & Testing Branch 2 (BWRs) Division of.
1 ACPR Advanced, cost competitive, proven technology, and reliable The Third Generation Nuclear Reactor.
.1 Babcock & Wilcox Proprietary Information Introduction to mPower IRUG Conference Salt Lake City, Utah July 27, 2011 Jason Williams Babcock&Wilcox.
POWER GENERATION TECHNOLOGIES
Getting Green Building Automation. Why is Building Automation a Green Technology? There are programs starting all over the nation that focus on alternative.
 A nuclear reactor produces and controls the release of energy from splitting the atoms of certain elements. In a nuclear power reactor, the energy released.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
1 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 David Cliff UK Licensing Manager AP1000 Westinghouse.
BNFL/Westinghouse’s Perspective on the Nuclear Hydrogen Economy Dr PJA Howarth Head of Group Science Strategy.
“ Second Moscow International Nonproliferation Conference PLUTONIUM UTILIZATION IN REACTOR FUEL A. Zrodnikov Director General State Scientific Center of.
Can Egypt share the Construction of Power Reactors as Korea ?
Nuclear Energy General Concept. In 2001, total US generation of electricity was 3,777 billion kilowatt-hours.
Nuclear Fact Sheet Matthew Pigott EGRS 352 Professor Nicodemus Process: Nuclear energy results from the splitting of uranium atoms in a process called.
SMR-160: A Walk-away Safe Small Modular Nuclear Reactor
1 This material is based upon work supported by the Department of Energy under Award Number DE-NE This report was prepared as an account of work.
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.

Westinghouse Operational Experience and Prospects for New Build
Problems SHORTAGE of renewable, clean electrical generating capacity SHORTAGE of renewable, clean electrical generating capacity NEED FOR ENERGY SECURITY.
PBNC- 1 Overview of US Nuclear Energy Initiatives /06- 1 Harold McFarlane President American Nuclear Society.
Engineering Deans Institute 2015 The Future of Nuclear Energy Dr. Terry A. Michalske Laboratory Director April 13, 2015.
A NUCLEAR RENAISSANCE Ping Wan The Tenth Nuclear Utility Meteorological Data Users Group Meeting June 2005.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Kevin Burgee Janiqua Melton Alexander Basterash
ALFRED System Configuration Luigi Mansani
Nuclear Thermal Hydraulic System Experiment
Reiner W. Kuhr Executive Consultant University of Calgary November 2, 2006 PBMR Oil Sands Applications.
Nuclear Power Plant Orientation
"Congress should promote research into the next generation of nuclear plants and encourage investment in existing nuclear plants to expand a clean and.
NuScale Power Small Modular Reactors The Future of Nuclear Energy
Page 1 Petten 27 – Feb ALFRED and ELFR Secondary System and Plant Layout.
By Kasey Poirier, Eean Albro, Chase Lee
THE FUKUSHIMA NUCLEAR ACCIDENT ON THE TECHNOLOGY DEVELOPMENT OF NEW NUCLEAR POWER PLANTS 1.IRSHAD NURHAKIM BIN NORAHIM (ME088151) 2.LEE SZE TENG (ME087909)
LOW PRESSURE REACTORS. Muhammad Umair Bukhari
A generation ahead by design SMR -160 An Unconditionally Safe Source of Pollution-Free Nuclear Energy for the Post-Fukushima Age 1 By Dr. Kris Singh Holtec.
Nuclear Battery Battery.  Reactor –Core Metallic fuel core (U-10%Zr) –Reactivity control Movable reflectors –Shutdown system Shutdown rod and reflectors.
NUCLEAR REACTORS G. HETSRONI Emeritus Danciger Professor of Engineering Technion – Haifa – Israel.
Progress Meeting 20 Nov 2012, Karlsruhe LEADER 1LEADER1 WP1 REFERENCE DESIGN OBJETIVES AND SPECIFICATION (SCK-CEN)
© Cengage Learning 2015 LIVING IN THE ENVIRONMENT, 18e G. TYLER MILLER SCOTT E. SPOOLMAN © Cengage Learning 2015 Nonrenewable Energy-Nuclear Energy.
1 PG&E’s Humboldt Bay (HBPP) & Diablo Canyon (DCPP) Power Plants Decommissioning process and replacement power April 14, 2011 Loren Sharp.
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
Generator Operation. Video of Generator synchronizing.
NuScale Generator A Practical Energy Alternative for the Future
AN INTEGRAL PWR, “CAREM”, IS BEING DEVELOPED BY CNEA, ARGENTINA
Collaborative Research in
Pressurized Water Reactor
Nuclear Power Update for The Society of American Military Engineers
An Innovative Design by a Nuclear Newcomer
NEI Perspectives on Small Modular Reactors
NRC Event Number – Event Date
Problems SHORTAGE of renewable, clean electrical generating capacity
Session Name: Lessons Learned from Mega Projects
Panel Session 3 Small Modular Reactors Chairman: Prof Johan Slabber.
NuScale Micro-Reactor Technology
Small Modular Reactors: T’s & C’s
Presentation transcript:

1 Proprietary and Confidential New Jersey Clean Air Council Public Hearing April 1, 2009 Jeff Halfinger Babcock & Wilcox

2 Proprietary and Confidential A Shifting Landscape Increasing construction cost and schedule Skilled field craft labor NSSS component supply chain Tightening capital markets Government loan-guarantees Capital cost and funding access Changing geo-political environment Carbon-constrained regulatory framework Fossil-fueled power generation costs Energy independence and security

Modular reactors are NOT:

Modular Reactors are NOT:.4

5 Proprietary and Confidential MWe Improved Construction Schedule Project Financing Design & Licensing Risk Base Load Impact The Drivers Behind a Modular Reactor NSSS supply chain Cost Efficiency Real-world issues are shaping the optimal size.

6 Proprietary and Confidential Solution: B&Ws mPower TM Reactor Modular Approach Flexible and scalable to customer requirements Integrated reactor modules Multi-unit (1-10+) plant 100 percent shop manufactured Rail-shippable Reduced licensing risk, construction cost, & schedule Evolved PWR-type concepts Passive safety No on-site NSSS construction Three years to start-up Integrated and simplified NSSS with fewer components Internal helical coil SG No need for safety-grade backup power No external pressurizer Conventional core and standard fuel Simplified operations and maintenance Four plus-year core design Sequential partial-plant outages Standardized BOP Lower risk and cost solution…

7 Proprietary and Confidential 125 Mwe integral reactor Internal steam generator Standard PWR fuel Large primary coolant inventory SA508 RPV with SS clad Small penetrations into Primary Coolant System at TOP of RPV Diverse, redundant internal CRDMs No boron in primary coolant B&Ws mPower Reactor Steam Generator Reactor Primary Circulation Nuclear Core Feedwater Inlet Steam Outlet Circulators Internal CRDM

8 Proprietary and Confidential Decay heat removal heat sink Pressure Suppression Spent fuel pool Module B&Ws mPower Reactor Features Underground containment Used fuel stored in spent fuel pool for life Natural circulation decay heat removal system for emergency/refueling cooling Primary coolant treatment system within containment Steam generator inspection within containment Independent, self contained modules

9 Proprietary and Confidential The B&W mPower Plant Design Features Prefabricated components, Streamlined construction NSSS Steam turbine Control room containment Limited Module Interaction Independent controls Local responses minimizes interaction Underground reactor building, Enhanced safety Missile penetrations Seismic advantages Non-proliferation support Reliable Sequential outages Minimize options, Cost effective Condenser cooling (air or water) Seismic design (2 zones?) Number of modules

500 MWe Plant Using 125 MWe Modules 10 Compact footprint Self-contained Location flexibility 1900 Ft 1550 Ft

Adaptability to Government Installations Small compact standardized design Passively safe Scalable Long refueling cycle 5+ years at <5% enriched U 235 ~10 years at <10% enriched U 235 Built in the USA Heavy forgings from Lehigh Heavy Forge Component fabrication at B&Ws Mt. Vernon, Indiana facility Fuel fabrication at B&Ws Lynchburg, VA facility Modular construction techniques Transportable size

.12 Potential for Co-Generation Steam Desalination Electrolysis for hydrogen and oxygen production Fischer-Tropsch? Sell Excess Electricity to Secondary Market Adaptability to Government Installations

.13 Public-Private Partnerships To be Successful Program Must: Select appropriate sites for reactor deployments Critical missions Strategic offensive and defensive capabilities High energy costs and usage Production tax credits and loan guarantees could make nuclear power more competitive at more sites Develop a long-term land lease agreement (EUL?) Win-Win arrangement for Air Force and commercial developer Develop a long-term power purchase agreement Mechanism for third-party financing Minimizes market risks for initial units

14 Proprietary and Confidential Mt. Vernon, IN Lynchburg, VA Mt. Vernon, IN B&W Supply Chain of Proven Technology Domestic Forgings or Rolled Plate Component fabrication B&Ws Mt. Vernon, Indiana facility Fuel fabrication B&Ws Lynchburg, VA facility Control rod drive fabrication B&Ws Euclid facility Modular construction capabilities McDermotts Morgan City Vertical Integration within B&W

15 Proprietary and Confidential First Plant Deployment Define Functional Requirements Concept Definition Preliminary Design Prepare DCD Latest submittal NRC Review Final Design Prepare COL Application NRC Review Long-Lead Procurement Construction ITAAC NRC review paces project implementation

16 Proprietary and Confidential B&W mPower Benefits Sized to customer requirements Competitive cost Reduced risk – minimum site work and supply chain Shorter schedule – three-year construction Proven approach – evolved PWR technology Optimized O&M – four plus-year refuel cycle with partial outages Improved safety, safeguards, and security